Overview
Shreevari Sannidhi
Overview
Shreevari Sannidhi
Overview
Shreevari Sannidhi
Overview
Photo: Shreevari Sannidhi FlatsTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 27 Dec 2022 · No. BBMP/Ad.Com./MDP/0560/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹7.97 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 27 Dec 2022 | |
| Escrow bank | Axis Bank · Banaswadi |
Data room
138 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shreevari Sannidhi in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) (1 of 2) | issued 22 May 2023 |
|---|
| Water and sewerage NOC (BWSSB) (2 of 2) | issued 3 Sep 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2025 |
| Land conversion | Converted 14 Mar 2022 · Deputy Commissioner, Bengaluru Urban District | |
|---|---|---|
| Survey numbers | 90/6 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
2 BHK Flats · avg 67 m² 57.5%3 BHK Flats · avg 83 m² 40%1 BHK Flat · 29 m² 2.5%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1 BHK Flat | 1 | 312 |
| 2 BHK Flats | 23 | 724 |
| 3 BHK Flats | 16 | 891 |
| Vkk Grand | about 1 km | Locked | |
|---|---|---|---|
| SOBHA Victoria Park Phase 1 | about 1.5 km | Locked | |
| Legacy Saviero | about 2 km | Locked | |
| Nava Skanda Bellavita | about 2.5 km | Locked | |
| The Pearl Paradise | about 3.5 km | Locked | |
| Brr North Excellency Phase I | about 3.5 km | Locked | |
| Lodha Mirabelle | about 4 km | Locked | |
| Mirabelle Phase 2 | about 4 km | Locked | |
| Sattva La Vita | about 4.5 km | Locked | |
| Radiance Floresta | about 4.5 km | Locked | |
| Sumadhura Solea | about 4.5 km | Locked | |
| Adarsh Pinecourt | about 4.5 km | Locked |
| Shreevari Sannidhi This project | This project is the point the others are measured from | 30 Sep 2025 | – | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | about 1 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 1.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Legacy Saviero | about 2 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 2 km, Vaddera Palya (Railway track) | |
| Government land in the filed surveys | Sy 90: 5% of the parent survey, 0.35 of 6.97 acres | Review |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Horamavu |
| Amenities declared | Electricity · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.10 (44 covered spaces for 40 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 2 Sep 2025 |
|---|
| Schedule end | 30 Sep 2025 | |
|---|---|---|
| RERA completion date | 30 Sep 2025 | |
| Completion date, agreement | 30 Sep 2025 | |
| Work began, as filed | 1 Apr 2023 |
| Building heights, fire NOC | 11.47 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 5 sq m |
|---|
| Architect's certificate, registration | Dated 8 May 2023 · site inspected 24 Apr 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 8 May 2023 | |
| Chartered accountant's certificate, registration | Dated 6 May 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹16.59 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹10.32 Cr | |
| Estimated cost, engineer's certificate | ₹8.61 Cr |
Sold (5) 12.5%Unsold (35) 87.5%
| Flats sold, at completion | 5 | |
|---|---|---|
| Flats unsold, at completion | 35 | |
| Flats in the phase | 40 |
| Escrow bank | Axis Bank · Banaswadi | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 30 Jun 2027 |
| 45% (43 of 96) |
| Locked |
| Nava Skanda Bellavita | about 2.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| The Pearl Paradise | about 3.5 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
|---|
| Brr North Excellency Phase I | about 3.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Projects within 4 km, counted | 36 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 6,626 | |
| Booked | 3,413 of 6,626 (52%) | |
| Unsold | 3,213 | |
| Booked a month, pooled | 105 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5 km, K.R. Puram | |
| Metro, under construction | about 2.5 km, HRBR Layout |
| Kempegowda Airport | 27 | 18 |
| MG Road (CBD) | 12.5 | 10 |
| Manyata Tech Park | 7 | 4.5 |
| ITPL, Whitefield | 15.5 | 10 |
| Ecospace, Bellandur ORR | 18.5 | 13 |
| Electronic City Ph 1 | 30.5 | 22.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Horamavu Agara 20MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |