A great affordable society on the main chikagubbi road very near to the mall with excellent in society facilities and perks
Overview
Shriram Luxor
Overview
Shriram Luxor
Overview
Shriram Luxor
Overview
Photo: Shriram LuxorTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Title report dated | 19 Mar 2014 |
|---|
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | GBC(1)324/2014 | Clear |
| Environmental clearance | SEIAA 81 CON 2015 · issued 11 Dec 2015 | Clear |
| Airport height NOC | NOC ID JAKK/SOUTH/B/071114/47428 | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹116.35 Cr 36.8%Development · ₹200.05 Cr
Loan & collateral
| Escrow bank | HDFC · Richmond Road, Bangalore |
|---|
Data room
50 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
A great affordable society on the main chikagubbi road very near to the mall with excellent in society facilities and perks
Shriram Luxor may look a bit old from the outside, but it more than makes up for it with its excellent amenities. The facilities are thoughtfully planned, functional, and cater well to everyday needs.
Wonderful apartment with maintenance of hygiene in every place. At the main gate the security system is awesome And there is facilities of cafe, small grocery store, swimming,gym indoor games and outdoor games and play area for children.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
All 195 projects in Hennur Road → · Shriram Properties's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shriram Luxor in the interactive atlas
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 16,588 sq m | |
| The whole survey number on the KGIS map | 19,288 sq m | |
| Land area filed with K-RERA | 19,324 sq m | |
| Village, hobli and taluk on the KGIS map | Kannuru, Bidarahalli-3 hobli, Bangalore-East taluk | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Whole survey numbers on the KGIS map | 19,288 sq m (the project holds a share) | |
|---|---|---|
| Land area of this registration | 19,324 sq m | |
| Title deed | Executed 7 Apr 2005 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 160/1 | 1 | 4 acres 31 guntas | 4 acres 4 guntas | Differs: 27 guntas apart | 0 |
| Pollution board (CFE) |
|---|
| Filed with the registration |
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2020 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Pinecourt, price locked; Sattva La Vita, price locked; The Pearl Paradise, price locked; Sumadhura Solea, price locked; Sumadhura Epitome, price locked.
| Adarsh Pinecourt | 810 m | Locked | |
|---|---|---|---|
| Radiance Floresta | about 1 km | Locked | |
| Sattva La Vita | 1.5 km | Locked | |
| The Pearl Paradise | 1.8 km | Locked | |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2 km | Locked | |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2 km | Locked | |
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2 km | Locked | |
| Nava Skanda Bellavita | about 2.5 km | Locked | |
| Sobha City Athena | about 2.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 3.5 km | Locked | |
| Brr North Excellency Phase I | about 3.5 km | Locked | |
| Sumadhura Solea | 3.8 km | Locked |
| Shriram Luxor This project | This project is the point the others are measured from | 31 Mar 2020 | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Pinecourt | 810 m | 6 Mar 2026 | 71% (142 of 201) | Locked |
| Radiance Floresta | about 1 km | 31 May 2028 | 100% (65 of 65) | Locked |
| Sattva La Vita | 1.5 km | 12 Jul 2026 | 32% (20 of 63) | Locked |
| The Pearl Paradise | 1.8 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2 km | 31 Dec 2028 | 100% (364 of 364) | Locked |
| Rent, 3BHK, 3 km | ₹47,000 /mo · 18 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹32,000 /mo · 33 listings | |
| Rent, 1BHK, 3 km | ₹11,300 /mo · 9 listings | |
| Rent per sq ft, 3 km | ₹33.3 /mo, as listed · 33 listings with a size |
| Projects within 4 km, counted | 60 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 14,000 | |
| Booked | 7,870 of 14,000 (56%) | |
| Unsold | 6,130 | |
| Booked a month, pooled | 239 flats | |
| Months to sell, pooled | 24 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 4.0 km, Telecom layout, Ashwathnagar |
| Nearest storm drain | 1.1 km to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 400 m to the north, an unnamed pond |
| Completion |
|---|
| Completed, occupancy certificate filed with K-RERA |
| Schedule end | 28 Feb 2020 | |
|---|---|---|
| RERA completion date | 31 Mar 2020 | |
| Work began, as filed | 16 Oct 2015 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | GBC(1)324/2014 | |
|---|---|---|
| Environmental clearance | SEIAA 81 CON 2015 · issued 11 Dec 2015 |
| Estimated cost, at registration | ₹316.41 Cr |
|---|
| Escrow bank | HDFC · Richmond Road, Bangalore |
|---|
| K-RERA registrations under this promoter | 16 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 6 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 2.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.1 km to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 912 m above sea level, plus or minus 4 m | |
| Metro, operational | 9.8 km, K.R. Puram | |
| Metro, under construction | 5.9 km, Nagawara |
| Kempegowda Airport | 19.5 | 20 | 13.8 |
| MG Road (CBD) | 15.7 | 19 | 13.5 |
| Manyata Tech Park | 8.9 | 11 | 5.9 |
| ITPL, Whitefield | 21.4 | 26 | 14.2 |
| Ecospace, Bellandur ORR | 28.1 | 36 | 18.0 |
| Electronic City Ph 1 | 35.8 | 43 | 27.5 |
| Landfill or waste transfer station | 1.9 km to the north | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 920 m to the south | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.4 km to the west |