The best neatly homes and trustly blinding
Overview
Sk Cosmos
Overview
Sk Cosmos
Overview
Sk Cosmos
Overview
Photo: SK CosmosTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 2 pages, English.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹87.50 Cr |
|---|
Loan & collateral
| Escrow bank | Axis Bank · BANASWADI |
|---|
Data room
91 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
The best neatly homes and trustly blinding
What started as a good experience around 9 months back has now become a frustration. The builder seems to be least bothered about the quality and inspection. The onsite engineers are for name sake, they say ok to everything and don't work…
I recently had the pleasure of experiencing the SK Cosmos apartment project, and it left me thoroughly impressed. The high-rise structure is a testament to their commitment to quality construction. The spacious 2 BHKs are designed with…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sk Cosmos in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 6,573 sq m |
|---|
Valid as of this reportValidity ended
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | KSFES/NOC/289/2019 · issued 8 Jan 2020 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | issued 12 Jul 2019 · permissible top elevation 949 m above mean sea level · valid until 11 Jul 2027 | Clear |
| Pollution board (CFE) | consent order AW-345307 · issued 1 Oct 2024 | |
| Water and sewerage NOC (BWSSB) | issued 15 Feb 2024 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jul 2025 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Legacy Saviero | about 2 km | Locked |
|---|
| Vkk Grand | about 2.5 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 2.5 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 3.5 km | Locked |
|---|
| Nava Skanda Bellavita | about 3.5 km | Locked |
|---|
| The Pearl Paradise | about 4 km | Locked |
|---|
| Brr North Excellency Phase I | about 5 km | Locked |
|---|
| Radiance Floresta | about 5 km | Locked |
|---|
| Adarsh Pinecourt | about 5.5 km | Locked |
|---|
| Sattva La Vita | about 5.5 km | Locked |
|---|
| Lodha Mirabelle | about 5.5 km | Locked |
|---|
| Mirabelle Phase 2 | about 5.5 km | Locked |
|---|
| Sk Cosmos This project | This project is the point the others are measured from | 31 Jul 2025 | – | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 2 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | about 2.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 2.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 3.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Nava Skanda Bellavita | about 3.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
| The Pearl Paradise | about 4 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
| Projects within 4 km, counted | 35 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 7,318 | |
| Booked | 4,157 of 7,318 (57%) | |
| Unsold | 3,161 | |
| Booked a month, pooled | 107 flats | |
| Months to sell, pooled | 30 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Richi's Garden |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority |
| Completion |
|---|
| Completed, occupancy certificate 15 May 2025 |
| Schedule end | 31 May 2025 | |
|---|---|---|
| RERA completion date | 31 Jul 2025 | |
| Work began, as filed | 1 Jul 2020 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | KSFES/NOC/289/2019 · issued 8 Jan 2020 | |
|---|---|---|
| Environmental clearance | Filed with the registration |
Sold (69) 53.1%Unsold (61) 46.9%
| Flats sold, at completion | 69 | |
|---|---|---|
| Flats unsold, at completion | 61 | |
| Flats in the phase | 130 |
| Escrow bank | Axis Bank · BANASWADI |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 4 km, K.R. Puram | |
| Metro, under construction | about 3 km, Horamavu |
| Kempegowda Airport | 27.5 | 18 |
| MG Road (CBD) | 13.5 | 10.5 |
| Manyata Tech Park | 8.5 | 6 |
| ITPL, Whitefield | 13.5 | 9 |
| Ecospace, Bellandur ORR | 18.5 | 12.5 |
| Electronic City Ph 1 | 30 | 22 |
| Landfill or waste transfer station |
|---|
| None within 3 km |
| Sewage treatment plant | about 1.5 km, named Horamavu Agara 20MLD Sewage Treatment Plant on OpenStreetMap |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | None within 3 km |
|---|