Overview
Solace - A Sindhuri Infra Project
Overview
Solace - A Sindhuri Infra Project
Overview
Solace - A Sindhuri Infra Project
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BBMP) | Sanctioned 23 May 2024 · No. BBMP/Ad.Com./EST/0041/24-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Apartment of 12 Flats having Three Bedrooms… 100%
Location & risks
Construction & progress
Developer
Land · ₹4.70 Cr 36.4%Development · ₹8.20 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 21 May 2025 | |
| Building plan (BBMP) | Sanctioned 23 May 2024 | |
| Escrow bank | Axis Bank · Jai Bharath Nagar Branch |
Data room
100 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Jose EsperancaLapsed · completion date passed | M/s Sindhuri Infra Projects | Apartment | – | Apr 2022 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft | Dec 2026 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Solace - A Sindhuri Infra Project in the interactive atlas
Transfer of the land
Sale deed
Survey 86/63-47
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./EST/0041/24-25
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · BBMP · Survey 86/63-47
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/210625/007863
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 21 May 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: OLD EC and affidavits, 4 pages, English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 86-63-47 | |
|---|---|---|
| Land extent, Sy 86-63-47 | 631.7 (unit to confirm) | |
| Land area of this registration | 631 sq m | |
| Khata | A Khatha · BBMP · 23 May 2025 | |
| Sale deed | Dated 22 Dec 2023 |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 86-63-47 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Apartment of 12 Flats having Three Bedrooms | 12 | 1,233 |
| Magnolia Delight | about 4 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4 km | Locked | |
| Legacy Saviero | about 4.5 km | Locked | |
| Century Regalia (Project 2) | about 5 km | Locked | |
| Vkk Grand | about 5.5 km | Locked | |
| Lodha Mirabelle | about 5.5 km | Locked | |
| Mirabelle Phase 2 | about 5.5 km | Locked | |
| Brr North Excellency Phase I | about 6.5 km | Locked | |
| Vista Svara | about 6.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 7 km | Locked | |
| Sumadhura Solea | about 7 km | Locked | |
| Renaissance Srichakra | about 7 km | Locked |
| Solace - A Sindhuri Infra Project This project | This project is the point the others are measured from | 31 Dec 2027 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 4 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero | about 4.5 km | 30 Jun 2027 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Cox town |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.17 (14 covered spaces for 12 units) | |
| Power backup | Declared by the promoter |
| Water supply, as filed | Borewell, Local authority (BWSSB) |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Swami Vivekananda Road | |
| Metro, under construction | about 2 km, Tannery Road |
| Completion | Completed, occupancy certificate 2 Sep 2025 |
|---|
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 31 May 2026 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 23 May 2024 |
| Structure | RCC structure | |
|---|---|---|
| Wall thickness | External walls: 6"; Internal walls: 4" | |
| Building heights, fire NOC | 15 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Flooring | Living and dining: marble; Master bedroom: wooden flooring; Bedrooms: vitrified tiles (798x1598 mm) | |
|---|---|---|
| Toilet tiles | Vitrified tiles (walls) | |
| Power backup | Provided, 7.35 sq m |
| Architect's certificate, registration | Dated 26 May 2025 · site inspected 18 May 2025 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹12.90 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹8.20 Cr |
Unsold (12) 100%
| Flats sold, at completion | 0 | |
|---|---|---|
| Flats unsold, at completion | 12 | |
| Flats in the phase | 12 |
| Escrow bank | Axis Bank · Jai Bharath Nagar Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 45% (43 of 96) |
| Locked |
| Century Regalia (Project 2) | about 5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Vkk Grand | about 5.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Lodha Mirabelle | about 5.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
|---|
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 490 | |
| Booked | 185 of 490 (38%) | |
| Unsold | 305 | |
| Booked a month, pooled | 5 flats | |
| Months to sell, pooled | 57 months |
| Kempegowda Airport | 31.5 | 23.5 |
| MG Road (CBD) | 6.5 | 4 |
| Manyata Tech Park | 7.5 | 5 |
| ITPL, Whitefield | 15.5 | 12 |
| Ecospace, Bellandur ORR | 17 | 10 |
| Electronic City Ph 1 | 26 | 18.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1 km, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Raheja Mansion Substation on OpenStreetMap |