Overview
Sovereign Unnathi
Overview
Sovereign Unnathi
Overview
Sovereign Unnathi
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 2 May 2014 |
|---|
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2019 |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹360.00 Cr |
|---|
Loan & collateral
| Records searched to | 2 May 2014 | Review |
|---|---|---|
| Escrow bank | KOTAK MAHINDRA BANK · MALLESWARAM |
Data room
36 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sovereign Unnathi in the interactive atlas
Page 1
Page 1 of 16 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 16 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 43,519 sq m |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Forfeiture, agreement | 15% of the sale consideration |
|---|
| Legacy Saviero | about 1.5 km | Locked |
|---|
| Vkk Grand | about 2 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 2.5 km | Locked |
|---|
| Nava Skanda Bellavita | about 3.5 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4 km | Locked |
|---|
| The Pearl Paradise | about 4 km | Locked |
|---|
| Brr North Excellency Phase I | about 4.5 km | Locked |
|---|
| Lodha Mirabelle | about 5 km | Locked |
|---|
| Radiance Floresta | about 5 km | Locked |
|---|
| Mirabelle Phase 2 | about 5 km | Locked |
|---|
| Sattva La Vita | about 5.5 km | Locked |
|---|
| Adarsh Pinecourt | about 5.5 km | Locked |
|---|
| Sovereign Unnathi This project | This project is the point the others are measured from | 31 Dec 2019 | – | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 1.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | about 2 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 2.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Nava Skanda Bellavita | about 3.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 4 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| The Pearl Paradise | about 4 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
| Projects within 4 km, counted | 35 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 7,210 | |
| Booked | 4,151 of 7,210 (58%) | |
| Unsold | 3,059 | |
| Booked a month, pooled | 104 flats | |
| Months to sell, pooled | 29 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Richi's Garden |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority |
| RERA completion date | 31 Dec 2019 | Red flag |
|---|---|---|
| Work began, as filed | 5 Apr 2010 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | KOTAK MAHINDRA BANK · MALLESWARAM | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4 km, K.R. Puram | |
| Metro, under construction | about 2.5 km, Horamavu |
| Kempegowda Airport | 28.5 | 18.5 |
| MG Road (CBD) | 13 | 10 |
| Manyata Tech Park | 8 | 5.5 |
| ITPL, Whitefield | 14 | 9 |
| Ecospace, Bellandur ORR | 18 | 12 |
| Electronic City Ph 1 | 29.5 | 21.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Bangalore Water Supply and Sewerage Board on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south-west, named Banaswadi Substation on OpenStreetMap |