Overview
Spencer Oaks
Overview
Spencer Oaks
Overview
Spencer Oaks
Overview
Title & ownership
Approvals
| Building plan (BBMP) | Sanctioned 2 Jul 2022 · No. PRJ/0195/22-23IN | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK
Location & risks
Construction & progress
Developer
Land · ₹35.00 Cr 70.1%Development · ₹14.95 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 2 Jul 2022 | |
| Escrow bank | Union Bank of India · Union Bank Jayanagar Branch |
Data room
110 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Jose EsperancaLapsed · completion date passed | M/s Sindhuri Infra Projects | Apartment | – | Apr 2022 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft | Dec 2026 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Spencer Oaks in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Aug 2028 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 91-76-3/2 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 7 | 1,507 |
| 3BHK | 7 | 1,550 |
| 3BHK | 4 | 1,765 |
| Magnolia Delight | about 3 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4.5 km | Locked | |
| Vista Svara | about 5 km | Locked | |
| Renaissance Srichakra | about 5 km | Locked | |
| Vista Padmalaya | about 5.5 km | Locked | |
| Century Regalia (Project 2) | about 6 km | Locked | |
| Lodha Mirabelle | about 6 km | Locked | |
| Mirabelle Phase 2 | about 6 km | Locked | |
| Legacy Saviero | about 6.5 km | Locked | |
| Vkk Grand | about 7 km | Locked | |
| Brr North Excellency Phase I | about 7.5 km | Locked | |
| Sumadhura Solea | about 7.5 km | Locked |
| Spencer Oaks This project | This project is the point the others are measured from | 31 Aug 2028 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Vista Svara | about 5 km | 30 Oct 2026 | 50% (16 of 32) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Pulakeshinagara |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (18 covered spaces for 18 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 1 Aug 2028 | |
|---|---|---|
| RERA completion date | 31 Aug 2028 | |
| Work began, as filed | 31 Aug 2022 |
| Structure | RCC framed structure. TMT steel birla or sagar cement | |
|---|---|---|
| Wall thickness | 6" Solid blocks for exterior walls and 4"thick solid cement block for internal walls. |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC Windows with three track and security grill | |
|---|---|---|
| Flooring | Vitrified tile (600/600), flooring for living, dinning, bedrooms & kitchen. Ceramic tile flooring for balconies. Antiskid flooring for bathrooms | |
| Toilet tiles | Ceramic tiled flooring and glazed tile dado upto 7' | |
| Wiring | Concealed copper wiring with anchor/ cables, with anchor Switches & Sockets/and necessary points in each rooms. | |
| Power backup | Ashok leyland, Kirloskar and Mahindra generators as standby power to operate lifts, common area lights , CCTV and 3 bulb/tube and a fan in each flat |
| Chartered accountant's certificate, registration | Dated 26 Jul 2022 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹49.95 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹14.95 Cr | |
| Estimated cost, chartered accountant's certificate | ₹49.95 Cr, same as the filing |
| Escrow bank | Union Bank of India · Union Bank Jayanagar Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Locked |
| Renaissance Srichakra | about 5 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
|---|
| Vista Padmalaya | about 5.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
|---|
| Century Regalia (Project 2) | about 6 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Projects within 4 km, counted | 20 (20 with an approximate location) | |
|---|---|---|
| Flats in them | 681 | |
| Booked | 312 of 681 (46%) | |
| Unsold | 369 | |
| Booked a month, pooled | 5 flats | |
| Months to sell, pooled | 71 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 2 km, Cubbon Park | |
| Metro, under construction | about 0.5 km, Pottery Town |
| Kempegowda Airport | 31.5 | 25 |
| MG Road (CBD) | 3.5 | 2.5 |
| Manyata Tech Park | 6.5 | 5.5 |
| ITPL, Whitefield | 17.5 | 14 |
| Ecospace, Bellandur ORR | 18.5 | 11 |
| Electronic City Ph 1 | 24 | 19 |
| Landfill or waste transfer station | about 2.5 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named ETP on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the east, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Pottery Road on OpenStreetMap |