Overview
Sumukha Earthen Crest
Overview
Sumukha Earthen Crest
Overview
Sumukha Earthen Crest
Overview
Photo: Arjun VasuTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 1 Sep 2025 · No. BBMP/Ad.Com./MDP/0628/24-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 70 m² 58.2%3BHK · avg 100 m² 41.8%
Location & risks
Construction & progress
Developer
Land · ₹19.00 Cr 33.7%Development · ₹37.30 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 1 Sep 2025 | |
| Escrow bank | ICICI Bank · Bagalur Main Road |
Data room
128 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
All 195 projects in Hennur Road → · Sumukha Ventures's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sumukha Earthen Crest in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 30 Jan 2026 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Dec 2029 |
| Land conversion | Converted 20 Apr 2021 · Revenue Department | |
|---|---|---|
| Survey numbers | 22/5 · 22/6 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 64 | 756 |
| 3BHK | 46 | 1,076 |
| Brr North Excellency Phase I | about 1.5 km | Locked | |
|---|---|---|---|
| Vkk Grand | about 1.5 km | Locked | |
| Lodha Mirabelle | about 1.5 km | Locked | |
| Mirabelle Phase 2 | about 1.5 km | Locked | |
| Sumadhura Solea | about 2.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 2.5 km | Locked | |
| Sumadhura Epitome | about 2.5 km | Locked | |
| Nava Skanda Bellavita | about 3 km | Locked | |
| Legacy Saviero | about 3.5 km | Locked | |
| Sattva La Vita | about 3.5 km | Locked | |
| Sobha City Athena | about 3.5 km | Locked | |
| The Pearl Paradise | about 3.5 km | Locked |
| Sumukha Earthen Crest This project | This project is the point the others are measured from | 30 Dec 2029 | – | Not verified yet |
|---|---|---|---|---|
| Brr North Excellency Phase I | about 1.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Vkk Grand | about 1.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Lodha Mirabelle |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 0.5 km, Vaddera Palya (Railway track) | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.36 (150 covered spaces for 110 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 30 Dec 2029 | |
|---|---|---|
| Schedule end | 30 Dec 2029 | |
| RERA completion date | 30 Dec 2029 | |
| Work began, as filed | 3 Jan 2026 |
| Structure | RCC framed structure | |
|---|---|---|
| Building heights, fire NOC | 11.48 m filed, 3 towers |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows (sliding) | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
| Power backup | Provided |
| Fire safety | Filed with the registration | |
|---|---|---|
| Architect's certificate, registration | Dated 23 Dec 2025 · site inspected 15 Dec 2025 | |
| Engineer's certificate, registration | Dated 24 Dec 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹56.30 Cr |
|---|
| Escrow bank | ICICI Bank · Bagalur Main Road |
|---|
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 2 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 1.5 km |
| 30 Jun 2028 |
| 96% (418 of 437) |
| Locked |
| Mirabelle Phase 2 | about 1.5 km | 31 May 2030 | 61% (173 of 284) | Locked |
|---|
| Sumadhura Solea | about 2.5 km | 30 Jun 2029 | 14% (32 of 233) | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 2.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
|---|
| Projects within 4 km, counted | 44 (44 with an approximate location) | |
|---|---|---|
| Flats in them | 8,324 | |
| Booked | 4,940 of 8,324 (59%) | |
| Unsold | 3,384 | |
| Booked a month, pooled | 110 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 6 km, Baiyappanahalli | |
| Metro, under construction | about 1.5 km, Nagawara |
| Kempegowda Airport | 24.5 | 18.5 |
| MG Road (CBD) | 11 | 9 |
| Manyata Tech Park | 5.5 | 2 |
| ITPL, Whitefield | 18 | 12.5 |
| Ecospace, Bellandur ORR | 23.5 | 14 |
| Electronic City Ph 1 | 31 | 23.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |