Project is completed and ready to move. The quality of construction seems okay. I could not find an apartment to buy as I needed it on the 2nd or 3rd floor but all of them are sold out.
Overview
V-Regaliaa
Overview
V-Regaliaa
Overview
V-Regaliaa
Overview
Photo: V RegaliaaTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 27 Dec 2021 · No. BBMP/AD.COM/MDP/0459/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 86 m²
Location & risks
Construction & progress
Developer
Land · ₹20.74 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 27 Dec 2021 | |
| Escrow bank | IDFC FIRST BANK · FRAZER TOWN |
Data room
125 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched, 2 plots have no filed extent to check against.
Project is completed and ready to move. The quality of construction seems okay. I could not find an apartment to buy as I needed it on the 2nd or 3rd floor but all of them are sold out.
I have been to this location a couple of times before my booking. Now it is under construction and after completion of the project it will be a one of the good property in Horamavu,the best part is just a 5mins walk accessibility to the…
I've reserved a unit in the Vregaliaa project. The project appears promising at initial glance. In terms of location and connectivity, it’s almost on the horamavu main road. This project, in my opinion, is a mid-sized community with common…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 185 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open V-Regaliaa in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2024 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 64 | Converted 31 Jan 2011 · DC OFFICE BANGALORE | |
| Sy 55 | Converted 3 Jun 2013 · DC OFFICE KG ROAD | |
| Survey numbers | 64 · 55 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 38 | 714 |
| 3BHK | 45 | 922 |
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vkk Grand, price locked.
| Legacy Saviero | about 0.5 km | Locked | |
|---|---|---|---|
| Vkk Grand | 2.1 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 3.5 km | Locked | |
| Nava Skanda Bellavita | about 4.5 km | Locked |
| V-Regaliaa This project | This project is the point the others are measured from | 30 Sep 2024 | – | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 0.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | 2.1 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 | about 3.5 km | 31 Dec 2027 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 830 m, Hoysala nagar in Hormavu | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 110 m to the north-east, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 300 m to the east, Horamavu |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · MULTIPURPOSE HALL · SWIMMING POOL & DECK AREA | |
|---|---|---|
| Covered parking per unit | 1.11 (92 covered spaces for 83 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 30 Sep 2024 |
|---|
| Possession, agreement | 31 Dec 2024 | |
|---|---|---|
| Schedule end | 30 Sep 2024 | |
| RERA completion date | 30 Sep 2024 | |
| Work began, as filed | 1 Mar 2022 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 7 sq m |
|---|
| Architect's certificate, registration | Dated 27 Apr 2022 · site inspected 25 Apr 2022 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 5 May 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹49.28 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹28.54 Cr |
Sold (49) 59%Unsold (34) 41%
| Flats sold, at completion | 49 | |
|---|---|---|
| Flats unsold, at completion | 34 | |
| Flats in the phase | 83 |
| Escrow bank | IDFC FIRST BANK · FRAZER TOWN | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 3 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 4.5 km | Locked |
|---|
| Lodha Mirabelle | 4.9 km | Locked |
|---|
| The Pearl Paradise | 5.0 km | Locked |
|---|
| Mirabelle Phase 2 | about 5 km | Locked |
|---|
| Sumadhura Solea | 5.7 km | Locked |
|---|
| Sattva La Vita | 5.9 km | Locked |
|---|
| Sumadhura Epitome | 6.0 km | Locked |
|---|
| 93% (280 of 300) |
| Locked |
| Nava Skanda Bellavita | about 4.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
|---|
| Brr North Excellency Phase I | about 4.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹38,600 /mo · 42 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,000 /mo · 145 listings | |
| Rent, 1BHK, 3 km | ₹13,425 /mo · 34 listings | |
| Rent per sq ft, 3 km | ₹25.0 /mo, as listed · 106 listings with a size |
| Projects within 4 km, counted | 23 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 4,141 | |
| Booked | 2,726 of 4,141 (66%) | |
| Unsold | 1,415 | |
| Booked a month, pooled | 73 flats | |
| Months to sell, pooled | 19 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 1.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 110 m to the north-east, secondary drain | |
|---|---|---|
| Ground level | 893 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.3 km, K.R. Puram | |
| Metro, under construction | 1.3 km, Horamavu |
| Kempegowda Airport | 28.3 | 31 | 19.8 |
| MG Road (CBD) | 12.3 | 15 | 8.8 |
| Manyata Tech Park | 7.3 | 11 | 5.2 |
| ITPL, Whitefield | 13.2 | 16 | 9.1 |
| Ecospace, Bellandur ORR | 16.1 | 27 | 11.3 |
| Electronic City Ph 1 | 29.0 | 37 | 20.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 820 m to the north-west, named Bangalore Water Supply and Sewerage Board on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.6 km to the west, named Banaswadi Substation on OpenStreetMap |