Overview
Vaishnavi Rhapsody
Overview
Vaishnavi Rhapsody
Overview
Vaishnavi Rhapsody
Overview
Photo: Vaishnavi RhapsodyTitle & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Escrow bank | Canara Bank · Cunningham Road |
|---|
Data room
86 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 2 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Jose EsperancaLapsed · completion date passed | M/s Sindhuri Infra Projects | Apartment | – | Apr 2022 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft | Dec 2026 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
All 24 projects in Frazer Town → · Vaishnavi Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vaishnavi Rhapsody in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 5 Aug 2022 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Magnolia Delight | about 3.5 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4 km | Locked | |
| Legacy Saviero | about 5 km | Locked | |
| Century Regalia (Project 2) | 5.4 km | Locked | |
| Lodha Mirabelle | 5.5 km | Locked | |
| Mirabelle Phase 2 | about 5.5 km | Locked | |
| Vkk Grand | 5.7 km | Locked | |
| Vista Svara | about 6 km | Locked | |
| Renaissance Srichakra | about 6.5 km | Locked | |
| Brr North Excellency Phase I | about 6.5 km | Locked | |
| Sumadhura Solea | 7.0 km | Locked | |
| Sumadhura Epitome | 7.2 km | Locked |
| Vaishnavi Rhapsody This project | This project is the point the others are measured from | 5 Aug 2022 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero | about 5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Century Regalia (Project 2) | 5.4 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Lodha Mirabelle | 5.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Mirabelle Phase 2 | about 5.5 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 7 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹61,000 /mo · 62 listings | |
| Rent, 2BHK, 3 km | ₹35,000 /mo · 148 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 79 listings | |
| Rent per sq ft, 3 km | ₹30.1 /mo, as listed · 112 listings with a size |
| Projects within 4 km, counted | 19 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 506 | |
| Booked | 188 of 506 (37%) | |
| Unsold | 318 | |
| Booked a month, pooled | 6 flats | |
| Months to sell, pooled | 57 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 490 m from the site | Clear |
| Nearest government-flagged flood location | 560 m, Cox town |
| Nearest storm drain | 60 m to the south, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 700 m to the south-west, an unnamed water body |
| Completion |
|---|
| Completed, occupancy certificate 8 Oct 2021 |
| Schedule end | 30 Sep 2022 | |
|---|---|---|
| RERA completion date | 5 Aug 2022 | |
| Work began, as filed | 16 May 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Engineer's certificate, registration | Dated 28 Sep 2026 |
|---|
| Estimated cost, at registration | ₹8.75 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹97.00 Cr | |
| Estimated cost, chartered accountant's certificate | ₹275.44 Cr |
Sold (7) 100%
| Flats sold, at completion | 7 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 7 |
| Escrow bank | Canara Bank · Cunningham Road |
|---|
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 7 | |
| Past promised date, not completed | 3 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 150 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 60 m to the south, secondary drain | |
|---|---|---|
| Ground level | 922 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.7 km, Halasuru | |
| Metro, under construction | 1.4 km, Tannery Road |
| Kempegowda Airport | 29.9 | 30 | 23.8 |
| MG Road (CBD) | 5.5 | 8 | 3.7 |
| Manyata Tech Park | 6.2 | 8 | 5.0 |
| ITPL, Whitefield | 15.8 | 19 | 12.4 |
| Ecospace, Bellandur ORR | 17.7 | 24 | 10.3 |
| Electronic City Ph 1 | 25.3 | 31 | 18.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.5 km to the south, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | 1.3 km to the south-east, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | 270 m to the south, named ITC Substation on OpenStreetMap |