Building plan (BDA)Sanctioned 28 Jun 2023No. BEMAPRAA/NAMA/ASA/AA-3/DA/14/2023-24
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted 28 Sep 2022DC BENGALURU
Permits
Approval letters
Building plan (BDA)
Sanctioned 28 Jun 2023 · No. BEMAPRAA/NAMA/ASA/AA-3/DA/14/2023-24
Power NOC
Filed with the registration
Fire department
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
We haven't verified this for this project yet.
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
4BHK · avg 225 m² 90.3%Ews
Location & risks
What is the location like?
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedLocal authority (PANCHAYATH & BOREWELL)Declared by the promoter
Metro, operationalabout 4 kmHebbagodi
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion50%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Review1 to review
Sold31 / 103As of Q2 2026-27
Sold in Q2 2026-273!ReviewReview
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BDA)
Sanctioned 28 Jun 2023
Escrow bank
Karur Vysya Bank Ltd. · INDIRANAGAR
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Documents filed151On K-RERA
Available00% of filed
K-RERA only151
Approvals with a validity dateNone read
Approvals & NOCs
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
Filed 17 Dec 2023K-RERA only
Filed 17 Dec 2023K-RERA only
Filed 17 Dec 2023K-RERA only
Filed 17 Dec 2023K-RERA only
Filed 17 Dec 2023K-RERA only
Filed 17 Dec 2023K-RERA only
Filed 17 Dec 2023K-RERA only
Source: K-RERA project page and the documents filed there, as read by us. 58 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Villa Bellissimo in the interactive atlas
2022
Survey 333/2
Transfer of the land
Sale deed
Survey 333/2
K-RERA filing, land schedule
Survey 333/1
Approval or registration
Land use converted
DC BENGALURU · Survey 333/1, 333/2
K-RERA filing, land schedule
Survey 333/2
Approval or registration
Land use converted
DC BENGALURU · Survey 333/1, 333/2
K-RERA filing, land schedule
2023
Survey 333/1
Approval or registration
Khata issued
A Khatha · PANACHAYATI RAJ · Survey 333/1
K-RERA filing, land schedule
Project
Approval or registration
Building plan sanctioned
BDA · plan BEMAPRAA/NAMA/ASA/AA-3/DA/14/2023-24
K-RERA filing, approvals
Survey 333/2
Approval or registration
Khata issued
A Khatha · PANACHAYATI RAJ · Survey 333/2
K-RERA filing, land schedule
2024
Project
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/300124/006589
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
A Khatha · PANACHAYATI RAJ · 28 Jun 2023; A Khatha · PANACHAYATI RAJ · 7 Jul 2023
Sale deed
Dated 26 Apr 2002, 26 Apr 2022
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; Title report; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Land · ₹20.65 Cr 14.2%Development · ₹125.00 Cr 85.8%
Form 4
Estimated cost, at registration
₹145.65 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (31) 30.1%Unsold (72) 69.9%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
10 / 103 · 93 available
Sold, Q4 2025-26
23 / 103 · 80 available
Sold, Q1 2026-27
28 / 103 · 75 available
Sold, Q2 2026-27
31 / 103 · 72 available
Unsold, Q2 2026-27
72
Sold in Q4 2025-26
13
Sold in Q1 2026-27
5
Sold in Q2 2026-27
3
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Karur Vysya Bank Ltd. · INDIRANAGAR
Designated account, collected
₹11.77 Cr in Q2 2026-27
Designated account, withdrawn
₹9.22 Cr in Q2 2026-27 (78% of that quarter's deposits)
Not verified yet: Receivable, sold villas; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Local authority (PANCHAYATH & BOREWELL)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot