Overview
VRR Golden Enclave Phase II
Part ofVRR Golden Enclave2 phases, 97 flats
Overview
VRR Golden Enclave Phase II
Part ofVRR Golden Enclave2 phases, 97 flats
Overview
VRR Golden Enclave Phase II
Part ofVRR Golden Enclave2 phases, 97 flats
Overview
Part ofVRR Golden Enclave2 phases, 97 flats
Title & ownership
Approvals
| Building plan (BDA) | Sanctioned 13 Sep 2021 · No. NM/AS/AA03/TS02/S/05/2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Villa · avg 441 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹37.93 Cr 46.1%Development · ₹44.36 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 13 Sep 2021 | |
| Escrow bank | Karnataka Bank Ltd. · Koramangala |
Data room
141 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open VRR Golden Enclave Phase II in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA |
|---|
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 23 Dec 2009 · Special Deputy Commissioner | |
|---|---|---|
| Survey numbers | 355 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Villas | Carpet per villa, average (sq ft) |
|---|---|---|
| Villa | 46 | 4,743 |
| Ramky One Karnival | about 1 km | Locked | |
|---|---|---|---|
| Vasuki Vallabha | about 3.5 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | about 4.5 km | Locked | |
| Sowmya Skyla | about 4.5 km | Locked | |
| Abhee Serenity Springs | about 4.5 km | Locked | |
| K&T's Sai Sannidhi | about 5 km | Locked | |
| Mahindra Zen | about 5.5 km | Locked | |
| Mahindra NewHaven | about 5.5 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | about 5.5 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 5.5 km | Locked | |
| Azur Phase 2 | about 6 km | Locked | |
| Assetz Ren & Rei | about 6.5 km | Locked |
| VRR Golden Enclave Phase II This project | This project is the point the others are measured from | 31 Dec 2027 | – | Not verified yet |
|---|---|---|---|---|
| Ramky One Karnival | about 1 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
| Vasuki Vallabha | about 3.5 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
| Shriram Sapphire (Codename Ultimate) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 5.5 km, SUBASH NAGARA | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 0.31 (26 covered spaces for 84 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 28 Jan 2025 |
|---|
| Possession, agreement | Dec 2027 | |
|---|---|---|
| Schedule end | 14 Feb 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Aug 2021 |
| Structure | RCC structure | |
|---|---|---|
| Building heights, fire NOC | 11 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Flooring | Living and dining: marble; Bedrooms: vitrified tiles | |
|---|---|---|
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
| Power backup | Provided, 14869 sq m |
| Fire safety | Filed with the registration | |
|---|---|---|
| Architect's certificate, registration | Dated 8 Mar 2022 | |
| Chartered accountant's certificate, registration | Dated 13 May 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹82.29 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹82.29 Cr, same as the filing |
Sold (34) 73.9%Unsold (12) 26.1%
| Villas sold, at completion | 34 | |
|---|---|---|
| Villas unsold, at completion | 12 | |
| Villas in the phase | 46 |
| Escrow bank | Karnataka Bank Ltd. · Koramangala |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 4.5 km |
| 5 Nov 2028 |
| 100% (414 of 414) |
| Locked |
| Sowmya Skyla | about 4.5 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
|---|
| Abhee Serenity Springs | about 4.5 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
|---|
| K&T's Sai Sannidhi | about 5 km | 31 Dec 2025 | 68% (27 of 40) | Locked |
|---|
| Projects within 4 km, counted | 28 (28 with an approximate location) | |
|---|---|---|
| Villas in them | 7,181 | |
| Booked | 2,584 of 7,181 (36%) | |
| Unsold | 4,597 | |
| Booked a month, pooled | 92 villas | |
| Months to sell, pooled | 40 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Hulimangala Gram Panchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3 km, Hebbagodi | |
| Metro, under construction | about 8.5 km, Kalena Agrahara |
| Kempegowda Airport | 55 | 42 |
| MG Road (CBD) | 20.5 | 18 |
| Manyata Tech Park | 31 | 25 |
| ITPL, Whitefield | 28.5 | 20 |
| Ecospace, Bellandur ORR | 18.5 | 11.5 |
| Electronic City Ph 1 | 4.5 | 3 |
| Landfill or waste transfer station | about 3 km to the north-west, named Bingipura Quarry Pit Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |