1,466 projects are registered with the real estate regulator in West Bengal. 1,226 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
1,018 of the 1,226 are still filed as under construction, and 451 are already past the completion date their promoter filed.
Projects 401 to 500 of 1,226
| HARA KUSUM APARTMENT PHASE - XVHIRA/P/PAS/2020/001105 | Shyamal Dutta | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Sep 2023 | 20 |
| HARA KUSUM APARTMENT PHASE IXHIRA/P/PAS/2021/001284 | Manali Construction | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Nov 2022 | 42 |
| HARA KUSUM APARTMENT PHASE XIIWBRERA/P/PAS/2023/000481 | Shyamal Dutta | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Feb 2026 | 30 |
| Haripriya ApartmentWBRERA/P/PAS/2023/000020 | Shubho Laxmi Real Estate | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Feb 2024 | 30 |
| HARMONY ENCLAVEWBRERA/P/WES/2024/001782 | Anjan Group | West Midnapore | Apartments | Registered | Jun 2029 | 15 |
| HARMONY-IWBRERA/P/WES/2023/000393 | Anjan Group | West Midnapore | Apartments | Registered | May 2026 | 9 |
| HARSHITA APARTMENTWBRERA/P/PAS/2025/002914 | Clm Developers Pvt. Ltd. | Paschim Bardhaman | Apartments | Registered | Mar 2028 | 12 |
| HEAVEN HOMESWBRERA/P/PAS/2023/000389 | Zafro Industries Private Limited | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Dec 2025 | 35 |
| HEMANTA ENCLAVEWBRERA/P/PUR/2024/001020 | Bholeybaba Builder & Developer | Purulia | Mixed | Under constructionpast its filed completion date | Mar 2026 | 19 |
| Heritage ApartmentWBRERA/P/NAD/2025/003400 | Vaastukala Estate Developers Private Limited | Nadia | Mixed | Under construction | Jul 2028 | 33 |
| HILL VIEW APARTMENTWBRERA/P/ALI/2024/002145 | Hills Builder And Developers | Alipurduar | Apartments | Under construction | Feb 2027 | 20 |
| HILLTRIP RESIDENCYWBRERA/P/BAN/2023/000908 | Samanta Infracon Private Limited | Bankura | Mixed | Under construction | Dec 2026 | 58 |
| HILLVIEW HEIGHTSWBRERA/P/PUR/2025/002424 | M/S B.B.Construction | Purulia | Mixed | Under construction | Apr 2027 | 83 |
| HIMALI RESIDENCYWBRERA/P/DAR/2023/000697 | Himali Enterprise | Darjeeling | Apartments | Under constructionpast its filed completion date | Oct 2025 | 11 |
| HINDOLWBRERA/P/MAL/2025/002401 | Nivaj Projects Private Limited | Maldah | Apartments | Under construction | Aug 2027 | 42 |
| HIRA ESTATEWBRERA/P/WES/2024/001370 | Citysky Construction Private Limited | West Midnapore | Apartments | Under construction | Dec 2026 | 16 |
| HIYAR MAJHEWBRERA/P/BIR/2025/002461 | Jagannath Construction | Birbhum | Apartments | Under construction | Jan 2027 | 5 |
| HOME SQUAREWBRERA/P/JAL/2023/000173 | Green Hill Industries Private Limited | Jalpaiguri | Commercial | Under constructionpast its filed completion date | Jun 2025 | 120 |
| HORIZON - 1HIRA/P/PAS/2019/000576 | Aditya Infra | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Mar 2021 | 107 |
| HORIZON - IIHIRA/P/PAS/2019/000579 | Aditya Infra | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Sep 2021 | 105 |
| HP GREENSWBRERA/P/PAS/2023/000102 | Hira Panna Construction Private Limited | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Mar 2026 | 108 |
| ICHCHEMOYE APARTMENTWBRERA/P/PAS/2023/000054 | Land Star Builders & Developers | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2024 | 40 |
| ICHCHEMOYE APARTMENT PHASE-IIWBRERA/P/PAS/2026/004255 | Royal Associates | Paschim Bardhaman | Apartments | Under construction | Dec 2029 | 45 |
| ICONIC TOWERWBRERA/P/JAL/2023/000814 | Prime Property Developers | Jalpaiguri | Commercial | Under constructionpast its filed completion date | Dec 2025 | 24 |
| IDEAL MATASHREEWBRERA/P/COO/2025/003671 | Techno | Cooch Behar | Apartments | Under construction | Jul 2028 | 20 |
| IDEAL'S DB TOWERWBRERA/P/COO/2023/000210 | Ideal Infrastructure Solutions Private Limited | Cooch Behar | Mixed | Under constructionpast its filed completion date | Dec 2025 | 40 |
| IDEAL'S HIRANWBRERA/P/COO/2023/000250 | Ideal Infrastructure Solutions Private Limited | Cooch Behar | Mixed | Under constructionpast its filed completion date | Dec 2025 | 40 |
| IDEAL'S KARUNAMOYEEWBRERA/P/ALI/2025/003634 | Ideal Geotech | Alipurduar | Apartments | Under construction | Nov 2027 | 20 |
| IDEAL'S SEN RESIDENCYWBRERA/P/COO/2025/003654 | Ideal Infrastructure Solutions Private Limited | Cooch Behar | Apartments | Under construction | Aug 2027 | 22 |
| IDEAL'S SNEHALATAWBRERA/P/COO/2024/001067 | Techno | Cooch Behar | Apartments | Under construction | Dec 2027 | 16 |
| IDENTITY BY ABHEENANDAN REAL INFRA VENTURES LLPHIRA/P/PAS/2019/000694 | Abheenandan Real Infra Ventures Llp | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Dec 2020 | 35 |
| IMPERIAL ENCLAVEWBRERA/P/PAS/2023/000138 | Indrojit Banerjee | Paschim Bardhaman | Apartments | Under construction | Mar 2027 | 10 |
| INDRAPRASTHAWBRERA/P/PAS/2024/000982 | Sarathi Developers | Paschim Bardhaman | Apartments | Under construction | Dec 2026 | 36 |
| INSIGNIAWBRERA/P/JAL/2024/001257 | Sidhi Vinayak Builders | Jalpaiguri | Mixed | Under construction | Mar 2030 | 51 |
| INTELLIAWBRERA/P/JAL/2023/000682 | Prm Estate | Jalpaiguri | Apartments | Under construction | Dec 2026 | 158 |
| ISCKON ARCADEHIRA/P/JAL/2020/001006 | Golden Construction | Jalpaiguri | Apartments | Under constructionpast its filed completion date | Mar 2023 | 21 |
| ITILEKHA APARTMENTWBRERA/P/BAN/2025/002578 | Tarun Ghosh | Bankura | Mixed | Under construction | Jul 2027 | 73 |
| J S GREEN VALLEY APARTMENTWBRERA/P/DAR/2025/002474 | J & S Developer | Darjeeling | Apartments | Under construction | Mar 2028 | 22 |
| J.D. & D.P. APARTMENTWBRERA/P/PUR/2024/001799 | Jda Realtors | Purba Bardhaman | Apartments | Under construction | Dec 2027 | 12 |
| J.D. BELMONTEWBRERA/P/PUR/2024/001814 | Jda Realtors | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Jun 2025 | 9 |
| J.K.N TOWERWBRERA/P/PAS/2024/002202 | S.S. Construction | Paschim Bardhaman | Mixed | Under construction | Dec 2027 | 19 |
| JAGADHATRI RESIDENCYWBRERA/P/PUR/2024/001784 | Barddhaman Infrastructure Development Private Limited | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Jun 2026 | 9 |
| JAGANNATH APARTMENTWBRERA/P/PAS/2025/003247 | Maa Tara Enterprise | Paschim Bardhaman | Mixed | Under construction | Aug 2027 | 15 |
| JAGANNATH GRANDWBRERA/P/PAS/2024/002126 | Jagannath Buildinfra Private Limited | Paschim Bardhaman | Mixed | Registered | Sep 2027 | 21 |
| Jagannath ResidencyWBRERA/P/WES/2025/003804 | Shah Real Estate | West Midnapore | Mixed | Registered | Dec 2030 | 37 |
| JAGANNATH VATIKAWBRERA/P/PAS/2024/001881 | Jagannath Buildinfra Private Limited | Paschim Bardhaman | Mixed | Under construction | Mar 2027 | 25 |
| JAI HANUMAN TOWERHIRA/P/PUR/2019/000571 | Jaihanuman Residency Private Limited | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Mar 2022 | 36 |
| JAI MATA DI APARTMENTWBRERA/P/PUR/2024/000998 | Jai Mata Di Construction | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2025 | 12 |
| JAI MATA DI APARTMENTWBRERA/P/PUR/2024/001318 | Jai Mata Di Construction | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2024 | 12 |
| JAMUNA APARTMENTWBRERA/P/JAL/2024/001564 | Rakesh Saha | Jalpaiguri | Apartments | Under construction | Dec 2026 | 8 |
| JASODA APARTMENTWBRERA/P/MAL/2026/004013 | Jay Baba Biswakarma Builders | Maldah | Mixed | Registered | Dec 2028 | 97 |
| JAWALA SATYAMWBRERA/P/PUR/2025/003635 | GGL Housing Private Limited | Purba Bardhaman | Mixed | Under construction | Jun 2030 | 80 |
| JAWALA SATYAM APARTMENTHIRA/P/PUR/2020/000766 | Jawala Tea Limited | Purba Bardhaman | Apartments | Registered | Dec 2024 | 97 |
| JAYANTA KUTIRWBRERA/P/DAR/2025/003520 | Subhradeep Enterprise | Darjeeling | Apartments | Under constructionpast its filed completion date | Jan 2026 | 8 |
| JH GREENSWBRERA/P/NOR/2023/000825 | J,h Developers Llp | North Dinajpur | Apartments | Under construction | Dec 2028 | 110 |
| JHARNA APARTMENTWBRERA/P/PAS/2025/002457 | Puja Realtors | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | May 2026 | 9 |
| JHULELAL ENCLAVEWBRERA/P/DAR/2025/002960 | Jhulelal Builders | Darjeeling | Mixed | Under construction | Dec 2027 | 12 |
| JIBANALAYWBRERA/P/DAR/2025/003307 | Siddhi Vinayak Construction | Darjeeling | Apartments | Under construction | Dec 2028 | 10 |
| JINA APARTMENTWBRERA/P/PAS/2025/002842 | A.B. Construction | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Nov 2025 | 12 |
| JK APARTMENTWBRERA/P/PAS/2025/002360 | City Enterprise | Paschim Bardhaman | Mixed | Registered | Dec 2026 | 15 |
| JOY MAA BAISHNODEBI CONSTRUCTIONWBRERA/P/BAN/2024/001724 | Joymaa Baishnodebi Construction | Bankura | Apartments | Under construction | Dec 2027 | 12 |
| JUGAL RANI RESIDENCYWBRERA/P/JAL/2024/001198 | Shyam Construction | Jalpaiguri | Mixed | Registered | Dec 2025 | 21 |
| JUPITER NESTWBRERA/P/PAS/2023/000135 | Jupiter Real Estate | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2025 | 63 |
| JUPITOR-83WBRERA/P/DAR/2025/003620 | The Jupitor | Darjeeling | Apartments | Under construction | Dec 2027 | 8 |
| JYOTI COTTAGE ROW HOUSE- 1WBRERA/P/PAS/2024/001692 | Netflex Homes Private Limited | Paschim Bardhaman | Apartments | Registered | Jan 2026 | 3 |
| JYOTI COTTAGE ROW HOUSE- 2WBRERA/P/PAS/2024/001854 | Netflex Homes Private Limited | Paschim Bardhaman | Apartments | Registered | Jan 2026 | 3 |
| Jyotsana ApartmentWBRERA/P/PAS/2025/002867 | S R Construction | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Oct 2026 | 16 |
| KAILASH RESIDENCYWBRERA/P/WES/2026/004354 | Rb Real Estate Das's Private Limited | West Midnapore | Apartments | Under construction | Jun 2030 | 15 |
| Kailashnath ApartmentWBRERA/P/WES/2023/000534 | Ganaks Housing Development Industies LLP | West Midnapore | Apartments | Under constructionpast its filed completion date | Sep 2025 | 12 |
| KALIKA SQUAREWBRERA/P/JAL/2024/001748 | Hyspace Constructions Private Limited | Jalpaiguri | Mixed | Registered | Mar 2027 | 23 |
| KALPANA ABASANWBRERA/P/PAS/2025/003622 | R.K Builders And Developers Private Limited | Paschim Bardhaman | Apartments | Under construction | Dec 2026 | 9 |
| KALPANA ENCLAVEWBRERA/P/PAS/2025/003433 | Kedarnath Construction | Paschim Bardhaman | Apartments | Under construction | Jul 2028 | 15 |
| KALPATARU APARTMENTWBRERA/P/JHA/2024/001140 | Kalpataru Developer | Jhargram | Mixed | Under constructionpast its filed completion date | Aug 2024 | 11 |
| KALPATARU HOUSING COMPLEX BLOCK A & BWBRERA/P/PAS/2023/000344 | Tara Shree Builders And Developers | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Jun 2025 | 81 |
| KALPATARU HOUSING COMPLEX BLOCK CWBRERA/P/PAS/2024/001430 | Tara Shree Builders And Developers | Paschim Bardhaman | Apartments | Under construction | Aug 2028 | 80 |
| KALPOTORU RESIDENCYWBRERA/P/PAS/2023/000630 | Aradhya Space Developers | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Mar 2026 | 72 |
| KALYAN PRAVA APARTMENTWBRERA/P/EAS/2024/001524 | M/S Overseas Engineering & Co | East Medinipur | Apartments | Under constructionpast its filed completion date | Mar 2025 | 16 |
| KALYANI PARKWBRERA/P/PUR/2024/001699 | Bardhaman S S Construction Private Limited | Purba Bardhaman | Mixed | Under construction | Apr 2027 | 23 |
| KAMAKHYA APARTMENTWBRERA/P/PAS/2025/003432 | Maa Kamakhya Developers | Paschim Bardhaman | Mixed | Under construction | Jan 2028 | 16 |
| KAMALA DHAM PHASE - IIIWBRERA/P/PAS/2023/000098 | Akaisha Bhuwalka Buildcon Llp | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2024 | 104 |
| KAMALA VILLAWBRERA/P/PUR/2025/002292 | R.D.Construction | Purba Bardhaman | Apartments | Under construction | May 2027 | 16 |
| KAMALADHAM PHASE - IHIRA/P/PAS/2019/000532 | Akaisha Bhuwalka Buildcon LLP | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Sep 2021 | 153 |
| KANCHAN APARTMENTWBRERA/P/PAS/2025/003650 | Kanchan Mitra | Paschim Bardhaman | Mixed | Registered | Jul 2028 | 14 |
| KANCHANJUNGHA APARTMENTHIRA/P/ALI/2020/000824 | – | Alipurduar | Mixed | Under constructionpast its filed completion date | Sep 2022 | 45 |
| Kedar DhamWBRERA/P/JAL/2024/001580 | K N Construction | Jalpaiguri | Apartments | Under constructionpast its filed completion date | Feb 2025 | 12 |
| KEDARNATH NIWAS BLOCK AWBRERA/P/PAS/2025/002787 | Kedarnath Realestate | Paschim Bardhaman | Apartments | Under construction | Dec 2027 | 16 |
| KEDARNATH NIWAS BLOCK BWBRERA/P/PAS/2025/002940 | Kedarnath Realestate | Paschim Bardhaman | Apartments | Under construction | Dec 2027 | 15 |
| KESHOB DWELLINGWBRERA/P/BAN/2023/000207 | Keshob Real Estate Private Limited | Bankura | Apartments | Under constructionpast its filed completion date | Mar 2026 | 16 |
| KESHOB NIBASHIRA/P/PAS/2020/001112 | Keshob Real Estate Pvt Ltd | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Sep 2023 | 16 |
| KESHOBALAYAWBRERA/P/PAS/2023/000209 | Keshob Real Estate Private Limited | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Jul 2026 | 20 |
| KESSO UNISQUAREWBRERA/P/JAL/2025/002725 | – | Jalpaiguri | Commercial | Registered | Sep 2027 | 120 |
| KHUSHI TOWERWBRERA/P/PUR/2024/001333 | Astha Construction | Purulia | Mixed | Under constructionpast its filed completion date | Mar 2026 | 32 |
| KI GRANDEURHIRA/P/PUR/2020/001037 | Kayal Infra | Purba Bardhaman | Apartments | Registered | Sep 2023 | 20 |
| KI GRANDEUR PHASE IIWBRERA/P/PUR/2023/000003 | Kayal Infra | Purba Bardhaman | Apartments | Under construction | Nov 2027 | 24 |
| KIMAYAWBRERA/P/JAL/2023/000520 | Sri Balaji Plaza Private Limited | Jalpaiguri | Mixed | Under constructionpast its filed completion date | Nov 2024 | 73 |
| KIRTI APARTMENT- BLOCK AWBRERA/P/PAS/2023/000659 | Super Construction | Paschim Bardhaman | Mixed | Registered | Dec 2027 | 33 |
| KIRTI ENCLAVEHIRA/P/PAS/2019/000454 | Kirti Sai Nath Construction Private Limited | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Sep 2023 | 67 |
| KREENG KUNJAWBRERA/P/PUR/2023/000518 | Subrata Mukherjee | Purulia | Apartments | Under constructionpast its filed completion date | Apr 2025 | 14 |
| KREENG NEERWBRERA/P/PUR/2025/003477 | Kreeng Construction Private Limited | Purulia | Apartments | Registered | Dec 2028 | 8 |
| KREENG THE 23WBRERA/P/PUR/2024/000955 | S S Builders | Purulia | Mixed | Under constructionpast its filed completion date | Dec 2025 | 27 |