As of 19 Nov 2026
New projects in West Bengal
India
1,466 projects are registered with the real estate regulator in West Bengal. 1,226 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
1,018 of the 1,226 are still filed as under construction, and 451 are already past the completion date their promoter filed.
By district
- Paschim Bardhaman 384
- Purba Bardhaman 178
- Darjeeling 167
- Jalpaiguri 149
- West Midnapore 79
- Bankura 50
- Nadia 39
- East Medinipur 34
- Purulia 33
- Birbhum 31
- Maldah 22
- Alipurduar 15
- Murshidabad 15
- Cooch Behar 11
- Jhargram 11
Projects 1 to 100 of 1,226
| " RADHAKUNJA APARTMENTWBRERA/P/PUR/2025/002820 | Joy Maakamakhya Construction Private Limited | Purba Bardhaman | Mixed | Under construction | Aug 2027 | 38 |
| " SHIBAM "WBRERA/P/PUR/2025/002426 | M/S Samanta Housing Developer | Purba Bardhaman | Mixed | Under constructionpast its filed completion date | Apr 2026 | 13 |
| "ANGAD NIWAS"WBRERA/P/BIR/2026/003876 | Sumanta Agarwala Huf | Birbhum | Mixed | Under construction | Dec 2027 | 32 |
| "ANJANA'S"WBRERA/P/WES/2024/002254 | Shamik Chakraborty | West Midnapore | Apartments | Under constructionpast its filed completion date | Dec 2025 | 12 |
| "BIHU APARTMENT"WBRERA/P/WES/2025/002979 | M/S. Tvaste Real Estate | West Midnapore | Mixed | Under construction | Oct 2027 | 41 |
| "HIRALALJI SERENITY HEIGHTS"WBRERA/P/PUR/2025/003624 | Advik Shelters Private Limited | Purulia | Apartments | Under construction | Aug 2030 | 40 |
| "MONGLAM APARTMENT"WBRERA/P/BIR/2025/003436 | M/S. Dwarakeshsree | Birbhum | Apartments | Under construction | May 2028 | 10 |
| "NISCHINDIPUR" (BLOCK-I)WBRERA/P/BAN/2023/000621 | Nirmayak Builders Private Limited | Bankura | Apartments | Under constructionpast its filed completion date | Nov 2024 | 22 |
| "NISCHINDIPUR" (BLOCK-II)WBRERA/P/BAN/2023/000644 | Nirmayak Builders Private Limited | Bankura | Apartments | Under constructionpast its filed completion date | Dec 2024 | 22 |
| "Panchajanya Apartment"WBRERA/P/BAN/2024/002007 | Nirmayak Builders Private Limited | Bankura | Mixed | Under construction | Dec 2028 | 21 |
| "Saanvi"WBRERA/P/MUR/2024/002182 | Suvdeep Construction | Murshidabad | Mixed | Registered | Jul 2027 | 16 |
| "Saptapadi"WBRERA/P/PUR/2024/002048 | M/S. Acube Infrastructures | Purba Bardhaman | Mixed | Under construction | Dec 2026 | 59 |
| "Sourav Apartment"WBRERA/P/WES/2025/002673 | J N Construction | West Midnapore | Apartments | Under construction | Dec 2028 | 21 |
| "THALASHA HIMALAYAS"WBRERA/P/DAR/2026/004106 | M/S. Thalasha Estates Llp | Darjeeling | Apartments | Under construction | Sep 2027 | 8 |
| 32 RegencyWBRERA/P/PUR/2023/000702 | S N Construction | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Oct 2024 | 20 |
| 360 EASTWBRERA/P/JAL/2023/000129 | Sens Hospitality Enterprises Private Limited | Jalpaiguri | Mixed | Under construction | Dec 2028 | 143 |
| 77 COMPLEX CITY (PHASE - I)WBRERA/P/PAS/2024/002261 | Bengal India Real Estate | Paschim Bardhaman | Apartments | Under construction | Sep 2029 | 90 |
| 7th AvenueWBRERA/P/JAL/2023/000454 | Rpk Realty | Jalpaiguri | Commercial | Under constructionpast its filed completion date | Apr 2026 | 17 |
| AADHILAKSH RESIDENCYWBRERA/P/WES/2024/001294 | Singh Associate | West Midnapore | Apartments | Under construction | Mar 2027 | 70 |
| Aadhilaksh Residency-IIWBRERA/P/WES/2026/003970 | Singh Associate | West Midnapore | Mixed | Registered | Dec 2027 | 14 |
| AADRITA-1, RENAISSANCEWBRERA/P/PUR/2024/001963 | Shrachi Burdwan Developers Pvt Ltd | Purba Bardhaman | Apartments | Registered | Feb 2028 | 48 |
| AADRITA-2, RENAISSANCEWBRERA/P/PUR/2024/001968 | Shrachi Burdwan Developers Pvt Ltd | Purba Bardhaman | Apartments | Registered | Aug 2028 | 40 |
| AADRITA-3, RENAISSANCEWBRERA/P/PUR/2024/001990 | Shrachi Burdwan Developers Pvt Ltd | Purba Bardhaman | Apartments | Registered | Feb 2029 | 48 |
| AAKASHJAN APARTMENTWBRERA/P/PAS/2023/000640 | Mata Puhumi Developers Private Limited | Paschim Bardhaman | Apartments | Registered | Dec 2026 | 16 |
| AARAMBHWBRERA/P/PAS/2026/004903 | Royal Majesty Homes | Paschim Bardhaman | Apartments | Registered | Jul 2027 | 24 |
| AARANYAKWBRERA/P/BAN/2024/002064 | Raghunathjee Construction | Bankura | Apartments | Under construction | Dec 2026 | 16 |
| AARANYAK - PRATAPBAGANWBRERA/P/BAN/2026/004350 | Raghunathjee Construction | Bankura | Apartments | Under construction | Mar 2029 | 12 |
| AAROHIWBRERA/P/PAS/2025/002419 | Bengal Aerotropolis Project Limited | Paschim Bardhaman | Apartments | Under construction | Nov 2027 | 13 |
| AAROHI 2.0, PHASE - IWBRERA/P/PAS/2026/004272 | Bengal Aerotropolis Project Limited | Paschim Bardhaman | Apartments | Registered | Mar 2029 | 13 |
| AARONWBRERA/P/BIR/2024/001395 | Dwaipayan Ghosh | Birbhum | Mixed | Under constructionpast its filed completion date | Mar 2026 | 18 |
| AARONWBRERA/P/BIR/2024/002089 | Dwaipayan Ghosh | Birbhum | Mixed | Under constructionpast its filed completion date | Mar 2026 | 18 |
| AavyaWBRERA/P/DAR/2025/003308 | M/s Shweta Mundhra | Darjeeling | Mixed | Registered | Sep 2027 | 17 |
| AAYRA CROWN BLOCK BWBRERA/P/PAS/2025/002985 | Aayra Infrastructure | Paschim Bardhaman | Apartments | Registered | Mar 2031 | 78 |
| AAYRA CROWN BLOCK CWBRERA/P/PAS/2025/003023 | Aayra Infrastructure | Paschim Bardhaman | Apartments | Registered | Jan 2031 | 91 |
| ABHAY DHAMWBRERA/P/ALI/2025/003061 | Debasish Kar | Alipurduar | Apartments | Under construction | Dec 2028 | 12 |
| ABHAY DHAM 2WBRERA/P/ALI/2025/003707 | Debasish Kar | Alipurduar | Apartments | Under construction | Jun 2027 | 12 |
| ABHILASA RESIDENCYHIRA/P/PAS/2021/001184 | Abhilasa Realcon Private Limited | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2021 | 12 |
| ABHINANDAN APARTMENTWBRERA/P/PAS/2026/004608 | Baba Lokenath Builder | Paschim Bardhaman | Apartments | Under construction | Jun 2028 | 24 |
| ABHINANDAN, BHAIRABSTHANWBRERA/P/BAN/2025/003411 | Raghunathjee Construction | Bankura | Mixed | Under construction | Mar 2027 | 7 |
| ABHITYA ENCLAVEWBRERA/P/PAS/2025/003805 | Nirbhay Infra Developers | Paschim Bardhaman | Mixed | Registered | Nov 2028 | 13 |
| ABRITA ARCADEWBRERA/P/PAS/2025/002858 | Classic Realtors | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Jul 2026 | 14 |
| ADARSH APARTMENTWBRERA/P/MAL/2025/002418 | Adarsh Developers | Maldah | Mixed | Under construction | Jun 2027 | 53 |
| Adi And Avi HeightsWBRERA/P/PAS/2023/000589 | Adi & Avi Heights | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | May 2026 | 35 |
| Adimaan ResidencyWBRERA/P/WES/2026/004271 | Singh Associate | West Midnapore | Mixed | Registered | Mar 2029 | 79 |
| ADN DELIGHT HEIGHTS PHASE IWBRERA/P/PAS/2024/001779 | Bijoy Laxmi Developers | Paschim Bardhaman | Mixed | Registered | Apr 2029 | 88 |
| ADRIJA ENCLAVEWBRERA/P/JAL/2024/001062 | Kailash Construction | Jalpaiguri | Mixed | Under construction | Dec 2028 | 49 |
| Aero City ApartmentWBRERA/P/PAS/2023/000122 | Green Mountain City Developer Pvt LTd | Paschim Bardhaman | Apartments | Registered | Mar 2026 | 28 |
| AGARWAL CITYWBRERA/P/PUR/2025/002505 | Rjp Agrawal Buildtech | Purba Bardhaman | Apartments | Under construction | Sep 2027 | 24 |
| AJANTA ENCLAVEWBRERA/P/DAR/2025/002684 | Lokenath Traders | Darjeeling | Mixed | Under construction | Dec 2027 | 9 |
| AJANTA MANJULAWBRERA/P/JAL/2026/004229 | Lokenath Traders | Jalpaiguri | Apartments | Under construction | Dec 2027 | 8 |
| AJOY VILLAWBRERA/P/BIR/2026/003996 | S.B. Construction | Birbhum | Apartments | Under construction | Feb 2027 | 20 |
| AK HEIGHTSWBRERA/P/PUR/2023/000839 | Susanta Ghosh | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Jul 2026 | 16 |
| AKANSHA SAYAPATRI PHASE IWBRERA/P/DAR/2025/003098 | Sarvan Kumar Chhetri | Darjeeling | Apartments | Under construction | Dec 2027 | 11 |
| AKANSHA UNIWORLD GARDENSWBRERA/P/DAR/2025/002796 | Sarvan Kumar Chhetri | Darjeeling | Apartments | Under construction | Dec 2027 | 35 |
| AKANSHAAHIRA/P/NAD/2019/000518 | M/S Akanshaa | Nadia | Mixed | Under constructionpast its filed completion date | Dec 2021 | 48 |
| AKASH APARTMENTWBRERA/P/PAS/2025/002770 | Nanibala Constructions | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Sep 2026 | 20 |
| AKASH RESIDENCYWBRERA/P/PAS/2023/000512 | Anudeb Construction | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Dec 2024 | 22 |
| AKRITIHIRA/P/PUR/2018/000003 | Primarc Projects Pvt. Ltd | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Jun 2023 | 192 |
| AkshaydhamWBRERA/P/NAD/2025/003071 | Vaastukala Estate Developers Private Limited | Nadia | Apartments | Under construction | Apr 2028 | 13 |
| ALEKKHYAHIRA/P/BIR/2021/001198 | Dwaipayan Ghosh | Birbhum | Apartments | Registered | Dec 2022 | 20 |
| ALPANA ENCLAVEWBRERA/P/EAS/2025/003518 | Shree Bishnu Infrastructure | East Medinipur | Mixed | Under construction | Jun 2027 | 14 |
| Amar ResidencyHIRA/P/PAS/2020/001095 | Siddhivinayaka Realty Llp | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Dec 2021 | 14 |
| Amar Tari Nijer BariWBRERA/P/BIR/2025/003737 | Halder Constructio)n | Birbhum | Mixed | Under construction | Dec 2026 | 12 |
| AmbbienceWBRERA/P/JAL/2023/000193 | Berlia Developers | Jalpaiguri | Apartments | Under constructionpast its filed completion date | Dec 2025 | 108 |
| AMBER PLAZAWBRERA/P/PAS/2026/004220 | Asansol Building Construction Pvt. Ltd. | Paschim Bardhaman | Mixed | Registered | Mar 2028 | 26 |
| AMBER RESIDENCYWBRERA/P/DAR/2024/001029 | Aanchal Enclave Private Limited | Darjeeling | Apartments | Under constructionpast its filed completion date | Sep 2024 | 20 |
| AMBEY SQUAREWBRERA/P/JAL/2024/001876 | Shree Balaji Nirman | Jalpaiguri | Commercial | Under construction | Dec 2026 | 86 |
| AMBEY VALLEYWBRERA/P/JAL/2023/000596 | Bgd Enterprises Llp | Jalpaiguri | Mixed | Under constructionpast its filed completion date | Mar 2026 | 16 |
| AMILALKA DWARIKA CASTLEWBRERA/P/JAL/2023/000360 | Amilalka Developers | Jalpaiguri | Mixed | Under constructionpast its filed completion date | May 2026 | 60 |
| AMIT OLYMPIA BY DWARIKA GROUPWBRERA/P/JAL/2025/002955 | Smd Enclave Llp | Jalpaiguri | Commercial | Under construction | Nov 2027 | 157 |
| AMRIT KUTIR - 1WBRERA/P/DAR/2024/001562 | Siddhi Vinayak Construction | Darjeeling | Apartments | Under constructionpast its filed completion date | Dec 2025 | 6 |
| AMRIT KUTIR - 2WBRERA/P/DAR/2024/001204 | Siddhi Vinayak Construction | Darjeeling | Apartments | Under constructionpast its filed completion date | Dec 2025 | 6 |
| ANADI APARTMENTWBRERA/P/BIR/2025/003474 | Ussan Land Development & Construction Private Limited | Birbhum | Apartments | Registered | Dec 2025 | 18 |
| ANANDAWBRERA/P/JAL/2023/000249 | N B Developers | Jalpaiguri | Apartments | Under constructionpast its filed completion date | Dec 2024 | 50 |
| ANANDA DHARA PHASE -IWBRERA/P/PAS/2026/004363 | Richmond Enclave Private Limited | Paschim Bardhaman | Apartments | Under construction | Aug 2028 | 268 |
| Ananda NiketanWBRERA/P/PAS/2023/000182 | Hare Krishna Sky | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2025 | 45 |
| ANANDA NIKETANWBRERA/P/PAS/2025/002636 | Purbasha Builders Private Limited | Paschim Bardhaman | Apartments | Registered | Sep 2029 | 38 |
| ANANDA NIKETANWBRERA/P/PUR/2023/000732 | Sanvi Residency | Purba Bardhaman | Apartments | Registered | Mar 2026 | 9 |
| ANANDA VILLEWBRERA/P/BIR/2025/003246 | M/s. A. Sircar & Associates | Birbhum | Apartments | Under construction | Dec 2027 | 32 |
| Anandam ResidencyHIRA/P/PAS/2020/001130 | Siddhivinayaka Realty Llp | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Dec 2022 | 15 |
| ANANDAMOYEE APARTMENTWBRERA/P/PAS/2023/000160 | Om Builders | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Sep 2026 | 49 |
| Anandville Phase IHIRA/P/DAR/2020/000976 | Shanti Developers | Darjeeling | Apartments | Registered | Mar 2025 | 350 |
| Anandville Phase IIHIRA/P/DAR/2020/000980 | Shanti Developers | Darjeeling | Mixed | Registered | Mar 2028 | 479 |
| ANANTAWBRERA/P/DAR/2023/000131 | City Developers | Darjeeling | Apartments | Under construction | Mar 2028 | 600 |
| ANANTA COMPLEXWBRERA/P/PUR/2025/002688 | C.D. Developers | Purba Bardhaman | Mixed | Under constructionpast its filed completion date | Oct 2026 | 29 |
| ANANTA RAM ABODEWBRERA/P/WES/2024/002137 | Citysky Construction Private Limited | West Midnapore | Apartments | Under construction | Dec 2026 | 16 |
| ANANYA APARTMENTWBRERA/P/PUR/2025/003186 | Ananya Developers | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2025 | 12 |
| ANANYA RESIDENCYWBRERA/P/PAS/2024/001669 | Kedarnath Realestate | Paschim Bardhaman | Apartments | Under construction | Dec 2028 | 66 |
| ANAYASHA APARTMENTWBRERA/P/PAS/2026/004262 | Banerjee Builders | Paschim Bardhaman | Apartments | Under construction | Feb 2029 | 24 |
| ANINDITA RESIDENCYWBRERA/P/DAR/2025/003073 | The Jupitor | Darjeeling | Apartments | Under construction | Dec 2027 | 5 |
| ANITA APARTMENTWBRERA/P/PUR/2025/003353 | Susanta Ghosh | Purba Bardhaman | Apartments | Under construction | Jun 2030 | 12 |
| ANITA BUSINESS CENTREWBRERA/P/PUR/2024/001230 | Esha Investment & Trading Pvt Ltd | Purba Bardhaman | Apartments | Registered | Oct 2026 | 53 |
| ANJUSHREE APARTMENTWBRERA/P/PAS/2025/003534 | Binayak Developers | Paschim Bardhaman | Apartments | Registered | Mar 2027 | 56 |
| ANKUR SUKRITIHIRA/P/PAS/2019/000664 | Ankur Nirman Private Limited | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Sep 2022 | 88 |
| ANNAPURNA ENCLAVEWBRERA/P/PUR/2024/001307 | Ssds Properties & Developers Private Limited | Purba Bardhaman | Apartments | Under construction | Dec 2028 | 24 |
| Annapurna EstateHIRA/P/PUR/2020/001119 | Hajra Associates | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | May 2023 | 27 |
| Antara - Phase II, RenaissanceHIRA/P/PUR/2019/000679 | – | Purba Bardhaman | Apartments | Registered | Dec 2022 | 2 |
| Antara, RenaissanceHIRA/P/PUR/2018/000259 | – | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Sep 2022 | 3 |
| Antara/Malhar, Phase-III, RenaissanceHIRA/P/PUR/2020/000942 | – | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2024 | 3,442 |
| ANUJIT RESIDENCYWBRERA/P/PAS/2026/004320 | Briddhi Developers | Paschim Bardhaman | Mixed | Under construction | Sep 2027 | 17 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region