As of 18 Nov 2026
New projects in West Bengal, page 11
India
1,466 projects are registered with the real estate regulator in West Bengal. 1,226 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
1,018 of the 1,226 are still filed as under construction, and 451 are already past the completion date their promoter filed.
Projects 1,001 to 1,100 of 1,226
| SONAR BHUBAN-KADAMHIRA/P/NAD/2020/001076 | PM Enterprise | Nadia | Apartments | Under constructionpast its filed completion date | Dec 2021 | 32 |
| SONAR SANSARWBRERA/P/PAS/2023/000123 | Durgapur Real Estate Private Limited | Paschim Bardhaman | Apartments | Under construction | Dec 2027 | 160 |
| SOUTHWIND EXOTICAWBRERA/P/PUR/2023/000157 | Southwinds Developers Llp | Purba Bardhaman | Apartments | Registered | Mar 2026 | 277 |
| Springfield ResidencyHIRA/P/BAN/2019/000661 | Raghunathjee Construction | Bankura | Mixed | Under constructionpast its filed completion date | Sep 2023 | 63 |
| SQUAREWOOD UTSAB PHASE - IHIRA/P/DAR/2018/000201 | Squarewood Projects Pvt. Ltd. | Darjeeling | Apartments | Under constructionpast its filed completion date | Aug 2022 | 84 |
| SQUAREWOOD UTSAB PHASE - IIHIRA/P/DAR/2019/000362 | Squarewood Projects Pvt. Ltd. | Darjeeling | Apartments | Under constructionpast its filed completion date | Sep 2023 | 66 |
| SREE BISHNU NILACHAL APARTMENTWBRERA/P/PAS/2024/001249 | Devahuti Housing Private Limited | Paschim Bardhaman | Mixed | Registered | Mar 2027 | 26 |
| SREE KRISHNA APARTMENTWBRERA/P/PAS/2023/000575 | Nani Acharyya | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Sep 2024 | 20 |
| SREE VISHNU APARTMENTWBRERA/P/PAS/2025/003232 | Nanda Dulal Roy | Paschim Bardhaman | Apartments | Registered | Apr 2028 | 12 |
| SreebhumiWBRERA/P/WES/2024/001953 | M/S Rajeshwari Developers | West Midnapore | Mixed | Under construction | Dec 2027 | 18 |
| SREEJAN SKYLINEWBRERA/P/DAR/2025/002974 | Sreejan Green | Darjeeling | Apartments | Under construction | Nov 2026 | 13 |
| SREENIVAS DWELL 3WBRERA/P/ALI/2023/000826 | B. D. Builders | Alipurduar | Apartments | Under construction | Dec 2027 | 30 |
| SRI GIRIDHAR DWARIKA ARCADEWBRERA/P/DAR/2023/000733 | Darjeeling Infracon Private Limited | Darjeeling | Mixed | Under constructionpast its filed completion date | Jun 2025 | 26 |
| SRI KRISHNA KUNJ RESIDENCYHIRA/P/PAS/2020/001135 | Manishankar Builders Private Limited | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Nov 2023 | 127 |
| SRI KRISHNA TOWERWBRERA/P/PAS/2023/000798 | Balajee Enterprise | Paschim Bardhaman | Mixed | Under construction | Dec 2027 | 17 |
| SRI KUMAR APTWBRERA/P/DAR/2025/003238 | Shivlok Construction | Darjeeling | Apartments | Under construction | Sep 2027 | 6 |
| SRIJA APARTMENTWBRERA/P/PAS/2025/003031 | Siddha Developer | Paschim Bardhaman | Apartments | Registered | Dec 2025 | 15 |
| SRIJAN APARTMENTWBRERA/P/PAS/2023/000829 | Srijan Apartment | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Jul 2025 | 12 |
| SRIJAN ENCLAVEWBRERA/P/PAS/2025/002935 | Rmg Buildcon | Paschim Bardhaman | Apartments | Under construction | Dec 2028 | 18 |
| SRINIKA APARTMENTWBRERA/P/PAS/2023/000449 | Aarya Developers | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Sep 2024 | 12 |
| SRINIKETANHIRA/P/DAR/2020/000951 | Vasudhaiva Kutumbakam Nirman Pvt. Ltd. | Darjeeling | Apartments | Under constructionpast its filed completion date | Mar 2025 | 202 |
| SRIRAM COMPLEX PHASE 2HIRA/P/NAD/2020/001039 | Sriram Construction | Nadia | Apartments | Under constructionpast its filed completion date | Mar 2024 | 20 |
| SRISTI APARTMENTWBRERA/P/PAS/2025/003269 | Sarathi Construction | Paschim Bardhaman | Apartments | Under construction | Sep 2027 | 16 |
| SRRB COMPLEXWBRERA/P/EAS/2023/000667 | Tinku Kumar Patra | East Medinipur | Mixed | Under constructionpast its filed completion date | Feb 2026 | 31 |
| SS ENCLAVE IIIWBRERA/P/DAR/2024/001573 | Ss Abasan | Darjeeling | Apartments | Under constructionpast its filed completion date | Dec 2025 | 12 |
| SS ENCLAVE IVWBRERA/P/JAL/2025/003652 | Saas Infra Realty | Jalpaiguri | Apartments | Under construction | Dec 2026 | 7 |
| STAR CONSTRUCTIONWBRERA/P/NAD/2024/002029 | Star Construction | Nadia | Mixed | Under construction | Jun 2027 | 30 |
| STAR GREENWBRERA/P/DAR/2024/001354 | Star Construction | Darjeeling | Mixed | Under constructionpast its filed completion date | Dec 2025 | 51 |
| STAR LIGHT APARTMENTWBRERA/P/DAR/2024/001184 | Yash Shree Developers | Darjeeling | Apartments | Under construction | Dec 2028 | 24 |
| STAR MANSIONWBRERA/P/PUR/2025/002793 | Purbasa Real Estate Pvt. Ltd. | Purba Bardhaman | Mixed | Under construction | Dec 2030 | 85 |
| SUBHASHINI APARTMENTHIRA/P/PAS/2021/001237 | Sayak Developer | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2023 | 18 |
| SUCHONA ENCLAVEWBRERA/P/PAS/2025/003736 | Oasis Group | Paschim Bardhaman | Apartments | Registered | Jul 2026 | 24 |
| SUDARSHAN TOWERWBRERA/P/PUR/2025/003342 | S. V. Builders And Developers | Purulia | Mixed | Under construction | Dec 2028 | 17 |
| SUDHA KUNJA FULBARI ABASAANWBRERA/P/MAL/2024/001136 | Baba Loknath Construction | Maldah | Apartments | Under construction | Dec 2026 | 12 |
| SUGAM PARK - PHASE IIHIRA/P/PAS/2018/000027 | Sugam Park (AoP) | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2021 | 460 |
| SUJALAM APARTMENTWBRERA/P/PAS/2024/001138 | Green Estates | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Mar 2026 | 20 |
| SUKHBRISHTIWBRERA/P/PUR/2025/002569 | Joy Maakamakhya Construction Private Limited | Purba Bardhaman | Mixed | Under construction | Oct 2028 | 85 |
| SUKHMAN RESIDENCYWBRERA/P/PAS/2026/004086 | Omkara Infrastructures | Paschim Bardhaman | Mixed | Under construction | Nov 2028 | 15 |
| SUKHMANI RESIDENCYWBRERA/P/PAS/2023/000909 | Dadimata Marcom Private Limited | Paschim Bardhaman | Mixed | Under constructionpast its filed completion date | Dec 2024 | 46 |
| SUKRITI APARTMENTHIRA/P/PAS/2021/001182 | "Misra Associates Development Consultants Pvt.Ltd." | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Mar 2023 | 58 |
| SUKTARA TOWERWBRERA/P/BAN/2023/000800 | Sunanda Construction | Bankura | Apartments | Under constructionpast its filed completion date | Oct 2024 | 38 |
| SULAKSHMI APARTMENTWBRERA/P/PAS/2026/004751 | Sayak Developer And Builder | Paschim Bardhaman | Apartments | Under construction | Jan 2028 | 60 |
| SULEKHA APARTMENTWBRERA/P/PAS/2025/003134 | Briddhi Developers | Paschim Bardhaman | Mixed | Under construction | Sep 2028 | 17 |
| SULOCHONA APARTMENTWBRERA/P/PAS/2023/000085 | Sayak Developer | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2024 | 36 |
| SUMANGALWBRERA/P/PUR/2023/000346 | Smart Homes | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2025 | 9 |
| Sumangal IIWBRERA/P/WES/2023/000374 | Soumen Samanta | West Midnapore | Apartments | Under constructionpast its filed completion date | Aug 2025 | 16 |
| SUMUKHA RESIDENCYWBRERA/P/PAS/2025/002404 | Shree Sumukha Developers LLP | Paschim Bardhaman | Apartments | Under construction | Mar 2027 | 20 |
| SUNCITYWBRERA/P/DAR/2023/000471 | N B Developers | Darjeeling | Mixed | Under construction | Mar 2027 | 255 |
| SUNDARAM APARTMENTWBRERA/P/PUR/2025/003296 | Karunamoye Construction | Purba Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2025 | 15 |
| SUNDARAM ENCLAVEHIRA/P/PAS/2021/001267 | Indra Kumar Gupta | Paschim Bardhaman | Mixed | Registered | Mar 2024 | 17 |
| SUNDARAM RESIDENCYWBRERA/P/PUR/2025/002633 | Sundaram Construction | Purba Bardhaman | Apartments | Under construction | Dec 2026 | 8 |
| SUNFLOWER APARTMENTSHIRA/P/NAD/2019/000511 | Susanta Das | Nadia | Mixed | Under constructionpast its filed completion date | Dec 2019 | 24 |
| SUNRISE MANORWBRERA/P/PUR/2026/004345 | Tomim Hossain | Purba Bardhaman | Mixed | Under construction | Jan 2029 | 9 |
| SUNSHINE APARTMENTWBRERA/P/PAS/2025/002305 | Maa Kali Developers | Paschim Bardhaman | Mixed | Under construction | Sep 2028 | 29 |
| SUNSHINE APPARTMENTWBRERA/P/PAS/2023/000905 | Sunshine Builds | Paschim Bardhaman | Apartments | Under construction | Sep 2028 | 12 |
| SUNSHINE PLACEWBRERA/P/PUR/2024/001066 | Smart Homes | Purba Bardhaman | Mixed | Under constructionpast its filed completion date | Jan 2026 | 20 |
| SURENDRA VILLAWBRERA/P/DAR/2024/001298 | Kite Developers | Darjeeling | Apartments | Under construction | Dec 2027 | 12 |
| SURYANARAYAN APARTMENTWBRERA/P/PAS/2023/000391 | Arun Kumar Sannigrahi | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Sep 2025 | 20 |
| SUTAPA ENCLAVE PHASE IIWBRERA/P/PAS/2023/000165 | Vinayak Realtors | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2025 | 60 |
| SwabhumiHIRA/P/JAL/2020/000994 | Shree Shyam Developers | Jalpaiguri | Mixed | Under constructionpast its filed completion date | Dec 2023 | 58 |
| SWAGATAM TOWERWBRERA/P/JHA/2023/000443 | Debson Construction & Trading Co. | Jhargram | Mixed | Under constructionpast its filed completion date | Dec 2024 | 28 |
| SWAMI VIVEKANANDA APARTMENTWBRERA/P/JHA/2025/002679 | Starlight Construction | Jhargram | Mixed | Under construction | Jun 2027 | 21 |
| SWAPNA MADHURI PHASE- IIIWBRERA/P/PAS/2025/002546 | Snl Builders | Paschim Bardhaman | Apartments | Under construction | Jun 2027 | 16 |
| Swapnabhumi VWBRERA/P/MUR/2024/001097 | Swapnabhumi V | Murshidabad | Mixed | Under constructionpast its filed completion date | Jun 2025 | 40 |
| SWAPNANEERWBRERA/P/PUR/2025/002576 | Swayambhu Realcon | Purba Bardhaman | Mixed | Under construction | Dec 2029 | 17 |
| SWAPNONIR PHASE IIWBRERA/P/PAS/2024/001000 | Shree Shyam Builders & Developers | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Jun 2025 | 25 |
| SWARNA BHOOMI PHASE -IIWBRERA/P/EAS/2024/001331 | Mohana Commercial Private Limited | East Medinipur | Apartments | Under constructionpast its filed completion date | Apr 2026 | 64 |
| SWARNALATAWBRERA/P/WES/2024/001691 | Suhasini Constructions | West Midnapore | Apartments | Under construction | Apr 2027 | 50 |
| SWARNOMOYEE APARTMENTWBRERA/P/PAS/2023/000421 | Durgapur Bidisha Niketan | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Dec 2025 | 21 |
| SWARNOMOYEE APARTMENT PHASE 2WBRERA/P/PAS/2026/004466 | Bidisha Niketan | Paschim Bardhaman | Apartments | Under construction | Jan 2027 | 35 |
| SWASTIK APARTMENTWBRERA/P/PAS/2026/004575 | Dutta And Company | Paschim Bardhaman | Apartments | Under construction | May 2028 | 24 |
| SWASTIK ENCLAVEWBRERA/P/PAS/2024/002279 | R.K Builders And Developers Private Limited | Paschim Bardhaman | Mixed | Under construction | Aug 2029 | 101 |
| SWASTIK RESIDENCYWBRERA/P/PAS/2024/001777 | Swastik Promoters And Developers | Paschim Bardhaman | Apartments | Under construction | Mar 2027 | 16 |
| SWASTIK TOWERWBRERA/P/JAL/2024/000987 | Baidyanath Constructions | Jalpaiguri | Apartments | Under constructionpast its filed completion date | Dec 2025 | 80 |
| SWASTIKAWBRERA/P/DAR/2023/000529 | Landmark Builders & Developers | Darjeeling | Mixed | Under constructionpast its filed completion date | Dec 2025 | 10 |
| SWATILEKHA APARTMENTWBRERA/P/PAS/2023/000071 | "Misra Associates Development Consultants Pvt.Ltd." | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Jun 2024 | 32 |
| SWEET HOME APARTMENTWBRERA/P/PUR/2024/001813 | Sweet Home Construction | Purba Bardhaman | Apartments | Under construction | Dec 2026 | 12 |
| SWETA APARTMENT PHASE IIWBRERA/P/PAS/2025/002971 | Amrita Builder & Developers | Paschim Bardhaman | Apartments | Under construction | Jun 2027 | 25 |
| SWISS VALLEY PHASE IIIWBRERA/P/PAS/2023/000380 | Aarya Developers | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Mar 2026 | 16 |
| SWOPNO BILASWBRERA/P/ALI/2025/003334 | Good Will Venture And Construction | Alipurduar | Apartments | Under construction | Mar 2028 | 16 |
| TAGORE RESIDENCYWBRERA/P/PAS/2025/003519 | Clm Developers Pvt. Ltd. | Paschim Bardhaman | Apartments | Registered | Jul 2028 | 35 |
| TAMLUK DOWNTOWN ENCLAVEHIRA/P/EAS/2019/000540 | Bangbhumi Realbuilders Llp | East Medinipur | Mixed | Under constructionpast its filed completion date | Oct 2022 | 361 |
| TAPASHYAHIRA/P/DAR/2020/000745 | Tapashya Retails Private Limited | Darjeeling | Apartments | Under constructionpast its filed completion date | Dec 2019 | 11 |
| TAPATI ENCLAVEWBRERA/P/PAS/2025/003828 | Classic Realtors | Paschim Bardhaman | Apartments | Registered | Oct 2028 | 20 |
| TARA MAA RESIDENCYWBRERA/P/PAS/2026/004115 | Maa Tara Construction | Paschim Bardhaman | Apartments | Under construction | Dec 2028 | 16 |
| TARACON ENCLAVEHIRA/P/MUR/2020/000797 | Taracon | Murshidabad | Mixed | Under constructionpast its filed completion date | Sep 2022 | 43 |
| TARACON ENCLAVE BUILDING BWBRERA/P/MUR/2025/002468 | Taracon | Murshidabad | Mixed | Under construction | Dec 2026 | 46 |
| Tarang Tower 6&7WBRERA/P/PAS/2024/001170 | Bengal Shristi Infrastructure Development Ltd. | Paschim Bardhaman | Apartments | Under constructionpast its filed completion date | Mar 2026 | 144 |
| Tarang Tower 8, 9 & 10WBRERA/P/PAS/2024/001916 | Bengal Shristi Infrastructure Development Ltd. | Paschim Bardhaman | Apartments | Under construction | May 2028 | 261 |
| Tejaswini TowerWBRERA/P/BAN/2025/003147 | Somnath Dey | Bankura | Mixed | Under construction | Mar 2028 | 33 |
| Texture HariWBRERA/P/EAS/2023/000375 | Texture Realty Private Limited | East Medinipur | Mixed | Under construction | Mar 2030 | 69 |
| THE 12WBRERA/P/EAS/2023/000804 | Asmi Infra | East Medinipur | Apartments | Registered | Jun 2027 | 48 |
| THE 5TH LANE, SUNSHINE RISEWBRERA/P/BAN/2025/003701 | Lucky Key Real Estate Private Limited | Bankura | Mixed | Under construction | Jun 2027 | 14 |
| The 69 Bidhannagar Unit 2WBRERA/P/WES/2025/002565 | The 69 | West Midnapore | Mixed | Under constructionpast its filed completion date | May 2026 | 26 |
| THE 69, UNIT - 3, RANGAMATI GREEN PROJECTWBRERA/P/WES/2026/004001 | The 69 | West Midnapore | Mixed | Registered | Dec 2030 | 25 |
| THE 98WBRERA/P/JAL/2023/000216 | Kanchanjunga Developers | Jalpaiguri | Apartments | Under constructionpast its filed completion date | Jul 2025 | 98 |
| THE ATELIAWBRERA/P/JAL/2024/001569 | Prime Builders | Jalpaiguri | Apartments | Under construction | Dec 2026 | 20 |
| THE CITY BLOCKHIRA/P/PUR/2021/001275 | Sidhhi Vinayak & Vaishnodevi Developers | Purulia | Mixed | Under constructionpast its filed completion date | Aug 2022 | 30 |
| THE CITY ENCLAVEWBRERA/P/PUR/2024/001123 | Sidhhi Vinayak & Vaishnodevi Developers | Purulia | Mixed | Under construction | Aug 2027 | 69 |
| THE CRESTWBRERA/P/DAR/2023/000789 | Deepak Enterprises | Darjeeling | Mixed | Under constructionpast its filed completion date | Dec 2025 | 161 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region