Building plan (Local Planning Authority)Sanctioned 14 Jan 2022No. ALN/551/2021-22
RERA extensionsNone on the filingFiling read 20 Oct 2026
Land conversionConverted 25 Jul 2012DC Bengaluru
Permits
Approval letters
Building plan (Local Planning Authority)
Sanctioned 14 Jan 2022 · No. ALN/551/2021-22
Power NOC
Filed with the registration
Fire department
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
3BHK 61.9%2BHK 38.1%
Unit types
Location & risks
What is the location like?
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedLocal authority (Municipality Chandapura)Declared by the promoter
Metro, operationalabout 3 kmBommasandra
Construction & progress
How is it being built, and when will it be ready?
Red flag1 red flag
CompletionNo return filed
Possession, agreement31 Mar 2023Agreement for sale, p. 11
StructureRCC framed structureAs specified
Progress
Completion, architect
Lapsed: no quarterly return is on this phase's K-RERA filing
Work left
Developer
Can the developer deliver?
Review1 to review
SoldNo return filed
Sold in the latest quarterNo return filed
Funding
Estimated cost
Loan & collateral
Can it be financed?
Review1 to review
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Records searched to
6 Dec 2021
!Review
Building plan
Sanctioned 14 Jan 2022
Escrow bank
ICICI Bank · SARJAPURA
Stage
Data room
Documents filed for this project
Locked
104 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
We purchased a flat in Bhavisha Meadows Phase 2, and our overall experience has been very good. The Bhavisha Homes team is supportive, responsive, and easy to reach whenever needed. The buying process was smooth and well-handled by Mr.Gagan…
Llooziya mariyam3 Aug 2024★★★★★
All I have to say is simply amazing . We are one of the first residents in Bhavisha Meadows phase-1 . Calm and Beautiful society to live in with really good amenities including 24*7 CCTV surveillance , positive vibes, greenery, fresh air…
Ddikumar217 Jan 2024★★★★★
I recently purchased a Flat in Bhavisha Meadows, build quality and amenities are great. One thing I most liked is 360 degree ventilation and ample amt of sunlight through out the day. Admin team very supportive.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Bhavisha Meadows in the interactive atlas
2012
Survey 2/2
Approval or registration
Land use converted
DC Bengaluru · Survey 2/2
K-RERA filing, land schedule
2021
Survey 2/2
Transfer of the land
Title deed registered
No. BSK-1-00781-2021-22 · Book 1 · executed 19 Apr 2021 · Chandapura village, Attibele hobli, Anekal taluk
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
Title
Title report
Records searched to
6 Dec 2021
Charges
Developer's project loan
None declared
Mortgage on the project land
None declared
Boundaries
Schedule in the EC vs KGIS neighbours
The matched land is part of a survey number. KGIS holds only the whole number, so its neighbours are not this land's.
Survey sketch
Survey sketch filed with K-RERA
No survey sketch is listed on this phase's K-RERA filing
Sketch, sanction and mutation vs KGIS map
Filed survey numbers matched to the KGIS map
1 of 1
Whole survey numbers on the KGIS map
23,001 sq m
Extent the filed land schedule names for these survey numbers
8,094 sq m
Plot area against the filed extent
2.84 times
Land area filed with K-RERA
4,677 sq m
Village, hobli and taluk on the KGIS map
Chandapura, ATTIBELE2 hobli, ANEKAL taluk
Sy. 2/2: filed extent, KGIS plot
8,094 sq m, 23,001 sq m
Mutation entry
None open on 1 of 1 filed surveys
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Not verified yet: Title opinion; Charges on the land; Landowner share of sales; Court-case search; High Court order; Encumbrance certificate, Form 15; Sketch dimensions; Sanctioned plan area; Share of sales revenue; Joint development agreement.
SEIAA
Filed with the registration
Airport height NOC
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Mar 2023
Registration certificates
PRM/KA/RERA/1251/308/PR/300622/005027
Land use
Conversion order
Land conversion
Converted 25 Jul 2012 · DC Bengaluru
Survey numbers
Sy No 2/2
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
•• %
•• %
•• %
•• %
•• %
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Type
Flats
Carpet, as filed (sq ft)
2BHK
32
–
3BHK
52
–
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Lapsed: no quarterly return is on this phase's K-RERA filing
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structural safety certificate; Foundation; Wall material; Wall thickness; Concrete / steel grade; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Structural engineer, quarterly; Design consultants (Form 6); Fire safety; Environmental clearance.
Land · ₹75.0 L 3.5%Development · ₹20.75 Cr 96.5%
Form 4
Estimated cost, at registration
₹21.50 Cr
Estimated cost, architect's and engineer's certificates
₹21.50 Cr, same as the filing
Sales
Sold vs unsold
Lapsed: no quarterly return is on this phase's K-RERA filing
Sold per quarter
Lapsed: no quarterly return is on this phase's K-RERA filing
K-RERA inventory
Lapsed: no quarterly return is on this phase's K-RERA filing
Compliance
Escrow
Lapsed: no quarterly return is on this phase's K-RERA filing
Escrow and filings
Escrow bank
ICICI Bank · SARJAPURA
Share of collections the promoter declared for escrow
70%
Track record
DOSL builder track
K-RERA registrations under this promoter
14
Marked completed
4
Past promised date, not completed
9
!Review
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Designated account, collected; Designated account, withdrawn; Unregistered agreements, over 10% paid; Average schedule slip.
Certified progress
Lapsed: no quarterly return is on this phase's K-RERA filing
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Approximate location: the filed pin, good to the neighbourhood, not the plot
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Local authority (Municipality Chandapura)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot