Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Calista - Phase 2 in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (Local Planning Authority)
Sanctioned 12 Dec 2022 · No. HPA/CC/265/2022-23
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/265/2022 · issued 16 Sep 2022 · building height 56.98 m
✓Clear
Environmental clearance
SEIAA 34 CON 2022
✓Clear
Airport height NOC
Filed with the registration
Pollution board (CFE)
consent order CTE-334540 · issued 23 Nov 2022 · valid until 22 Nov 2027
✓Clear
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2027
Registration certificates
PRM/KA/RERA/1251/446/PR/220823/006195
Land use
Conversion order
Land conversion
Converted 10 Nov 1992 · Special Deputy Commissioner
Survey numbers
163 · 170/1 · 165 · 166/1
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
Not verified yet
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3 Bedroom + 3 Toilet Study · 107 m² 15.8%3 Bedroom + 2 Toilet · 90 m² 14.6%2 Bedroom + 2 Toilet · 72 m² 11.6%3 Bedroom + 2 Toilet · 85 m² 7.9%11 other types 50.1%
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹105.62 Cr 30.2%Development · ₹243.55 Cr 69.8%
Form 4
Estimated cost, at registration
₹349.18 Cr
Estimated cost, architect's and engineer's certificates
₹243.55 Cr
Estimated cost, Form 4 Q2 2026-27
₹309.18 Cr
Cost incurred
₹179.53 Cr (58.1% of the Form 4 Q2 2026-27 estimate)
Cost left
₹129.65 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (481) 100%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
481 / 481 · 0 available
Sold, Q4 2025-26
481 / 481 · 0 available
Sold, Q1 2026-27
481 / 481 · 0 available
Sold, Q2 2026-27
481 / 481 · 0 available
Unsold, Q2 2026-27
0
Sold in Q4 2025-26
0
Sold in Q1 2026-27
0
Sold in Q2 2026-27
0
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
KOTAK MAHINDRA BANK · Lavelle Road
Designated account, collected
₹55.50 Cr in Q2 2026-27
Designated account, withdrawn
₹0 in Q2 2026-27 (0% of that quarter's deposits)
Sale proceeds realised, Q1 2026-27
₹37,12,00,000
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
36
Marked completed
13
Past promised date, not completed
8
Revoked or withdrawn
1
Other phases under this promoter name
31
With a filed extension or completion
13 (11 completed, 2 extended)
Average schedule slip
19 months
Not verified yet: Receivable, sold flats; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Other
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot