Overview
Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 29 Oct 2026 · No. PS/EM/EO-4/TA-4/E/47/2026-27 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 16 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted · OC 28-12-2023 | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 275 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Floris & Commercial At Brigade Autograph in the interactive atlas
Transfer of the land
Sale deed
in favour of Ananthay Properties Private Limited · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Land use converted
Bangalore Development Authority · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bangalore Development Authority · Survey [number withheld]
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Ananthay Properties Private Limited · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Land use converted
Bangalore Development Authority · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bangalore Development Authority · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan PS/EM/EO-4/TA-4/E/47/2026-27
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/071126/009091
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Aditya Birla Capital Limited · ₹500.00 Cr disbursed | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | [number withheld] | |
|---|---|---|
| Land extent, Sy [number withheld] | 81,713 sq m | |
| Land extent, Sy [number withheld] | 33,796 sq m | |
| Land extent, Sy [number withheld] | 46,187 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 83,645 sq m | |
| Khata | A Khatha · Bangalore Development Authority · 6 Aug 2025; A Khatha · Bangalore Development Authority · 20 Feb 2025 | |
| Sale deed | Dated 21 Dec 2024, 18 Jul 2025 | |
| Sale deed in favour of | Ananthay Properties Private Limited | |
| Fire NOC | Filed with the registration |
|---|
| Environmental clearance | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2032 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy [number withheld] | Converted 21 Jul 2025 · Bangalore Development Authority | |
| Sy [number withheld], [number withhe… | Converted 15 Feb 2025 · Bangalore Development Authority | |
| Survey numbers | [number withheld] · [number withheld] · [number withheld] |
3 bedroom + 3 toilet · avg 97 m² 17.9%3 bedroom + 3 toilet · avg 97 m² 12.9%2 bedroom + 2 toilet · avg 70 m² 12.8%2 bedroom + 2 toilet · avg 70 m² 12.6%6 other types 43.9%
| 1 bedroom + 1 toilet | 96 | 403 |
| 1 bedroom + 1 toilet | 98 | 403 |
| 2 bedroom + 2 toilet | 239 | 756 |
| 2 bedroom + 2 toilet | 243 | 756 |
| 3 bedroom + 2 toilet | 223 | 916 |
| 3 bedroom + 2 toilet | 228 | 916 |
| 3 bedroom + 3 toilet | 244 | 1,044 |
| 3 bedroom + 3 toilet | 339 | 1,044 |
| 3 bedroom + 3 toilet + study + powder room | 92 | 1,261 |
| 4 bedroom + 4 toilet + powder room +maid's room + maid's toilet | 96 | 1,612 |
| Godrej Woodscapes | about 1 km | Locked | |
|---|---|---|---|
| Sattva Songbird | about 1.5 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 2 km | Locked | |
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | Locked |
| Floris & Commercial At Brigade Autograph This project | This project is the point the others are measured from | 30 Jun 2032 | Not filed | Not verified yet |
|---|---|---|---|---|
| Godrej Woodscapes | about 1 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
| Sattva Songbird | about 1.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 5 km, SAI BABA ASHRAM KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.41 (3,245 covered spaces for 2,299 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Doddabanahalli Grama Panchayat) | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Sep 2031 | |
| RERA completion date | 30 Jun 2032 | |
| Work began, as filed | 15 Nov 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: A 149.9 m, B 149.9 m, C 149.9 m, D 149.9 m, E 149.9 m, BLOCK A 98 m, Hotel 100.65 m | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 600 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
Land · ₹670.88 Cr 18.3%Development · ₹3002.55 Cr 81.7%
| Estimated cost, at registration | ₹3673.44 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Developer's project loan | Aditya Birla Capital Limited · ₹500.00 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 29 Oct 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 3 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 3 km | Locked |
|---|
| Neighbourhood Tree Park | about 3.5 km | Locked |
|---|
| Chaithanya Sankhya | about 3.5 km | Locked |
|---|
| Sowparnika Euphoria in the East | about 3.5 km | Locked |
|---|
| Godrej Splendour Phase II | about 4 km | Locked |
|---|
| Definer Upper Deck | about 4.5 km | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 2 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 3 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
|---|
| Projects within 4 km, counted | 54 (54 with an approximate location) | |
|---|---|---|
| Flats in them | 20,255 | |
| Booked | 10,799 of 20,255 (53%) | |
| Unsold | 9,456 | |
| Booked a month, pooled | 287 flats | |
| Months to sell, pooled | 29 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 6 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 18 |
| MG Road (CBD) | 19 |
| Manyata Tech Park | 15 |
| ITPL, Whitefield | 7 |
| Ecospace, Bellandur ORR | 16 |
| Electronic City Ph 1 | 25 |
| Landfill or waste transfer station | about 3 km to the north-west, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Kondaspura on OpenStreetMap |