Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹1.66 Cr 10.5%Development · ₹14.05 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 16 Jan 2023 | |
| Escrow bank | FEDERAL BANK OF INDIA · HSR Layout |
Data room
121 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Green View in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 16 Jan 2023 · No. APA/CC/276/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-121307 · issued 27 Oct 2022 · valid until 26 Oct 2027 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2026 |
| Land conversion | Converted 9 May 2022 · Deputy Commissioner, Benglauru | |
|---|---|---|
| Survey numbers | Survey Number 94/2 (Old Survey |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Flats of 2 BHK · avg 72 m² 76.7%Flats of 3 BHK 11%Row Villas 6.8%Flats of1 BHK 5.5%
| Flats of 2 BHK | 56 | 43,346 |
| Flats of 3 BHK | 8 | 7,772 |
| Flats of1 BHK | 4 | 2,228 |
| Row Villas | 5 | 7,244 |
| Abhee Serenity Springs | about 0.5 km | Locked | |
|---|---|---|---|
| Shriram Sapphire (Codename Ultimate) | about 2.5 km | Locked | |
| Vasuki Vallabha | about 3 km | Locked | |
| Sowmya Skyla | about 3 km | Locked | |
| Ramky One Karnival | about 4 km | Locked | |
| Signature Heights | about 4.5 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 6 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 6 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 6 km | Locked | |
| Columbia Aaltius | about 6 km, to a locality centre | Locked | |
| Mahidhara Harmony | about 6.5 km | Locked | |
| SOBHA Townpark | about 6.5 km | Locked |
| Green View This project | This project is the point the others are measured from | 31 Mar 2026 | – | Not verified yet |
|---|---|---|---|---|
| Abhee Serenity Springs | about 0.5 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
| Shriram Sapphire (Codename Ultimate) | about 2.5 km | 5 Nov 2028 | 100% (414 of 414) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 8.5 km, G K LAYOUT | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.08 (79 covered spaces for 73 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 27 Mar 2025 |
|---|
| Possession, agreement | 31 Mar 2026 | |
|---|---|---|
| Schedule end | 31 Mar 2026 | |
| RERA completion date | 31 Mar 2026 | |
| Work began, as filed | 16 Jan 2023 |
| Building heights, fire NOC | 14.4 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 50 sq m |
|---|
| Architect's certificate, registration | Dated 19 May 2023 · site inspected 8 May 2023 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹15.71 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹14.05 Cr |
Sold (21) 28.8%Unsold (52) 71.2%
| Flats sold, at completion | 21 | |
|---|---|---|
| Flats unsold, at completion | 52 | |
| Flats in the phase | 73 |
| Escrow bank | FEDERAL BANK OF INDIA · HSR Layout |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Vasuki Vallabha |
|---|
| about 3 km |
| 31 Dec 2027 |
| 31% (10 of 32) |
| Locked |
| Sowmya Skyla | about 3 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
|---|
| Ramky One Karnival | about 4 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
|---|
| Signature Heights | about 4.5 km | 31 Oct 2028 | 51% (178 of 346) | Locked |
|---|
| Projects within 4 km, counted | 28 (28 with an approximate location) | |
|---|---|---|
| Flats in them | 12,549 | |
| Booked | 2,989 of 12,549 (24%) | |
| Unsold | 9,560 | |
| Booked a month, pooled | 43 flats | |
| Months to sell, pooled | 225 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 2 km, Bommasandra | |
| Metro, under construction | about 12.5 km, Kalena Agrahara |
| Kempegowda Airport | 58.5 | 44.5 |
| MG Road (CBD) | 24 | 21.5 |
| Manyata Tech Park | 34.5 | 28 |
| ITPL, Whitefield | 29.5 | 21.5 |
| Ecospace, Bellandur ORR | 22 | 14 |
| Electronic City Ph 1 | 6.5 | 4.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Yerandanahalli Substation on OpenStreetMap |