Overview
Millennium
Overview
Millennium
Overview
Millennium
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Akira Apartment (Nanjundeshwara Enclave)Lapsed · completion date passed | S V CONSULTANTS AND ENGINEERS | Apartment | – | Dec 2020 |
| Akshaya EnclaveRegistered · no quarterly update yet | AKSHAYA BUILDERS | Apartment | 646–1,084 sqft carpet (as filed) | Dec 2027 |
| Anika Redwood HomesWithdrawn | Anika Developers | Mixed development | 918 sqft carpet (as filed) | Dec 2019 |
| Anika Redwood HomesCompleted · OC 13-01-2022 | Anika Developers | Apartment | – | Completed |
| Atri NestLapsed · completion date passed | A3 Developers | Apartment | 617 sqft carpet (as filed) | Mar 2023 |
| Baldota ElegantLapsed · completion date passed | MC Baldota | Apartment | – | Nov 2017 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹37.3 L 9.4%Development · ₹3.60 Cr 90.6%
Loan & collateral
| Escrow bank | HDFC · MAGADI CHORD EXTN, VIJAYANAGAR |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 6 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Birla TisyaActive · 100% built | Birla Estates | Apartment | 1,250–2,500 sqft | 2026 |
| Ds Max SplendidCompleted · OC 20-12-2018 | DS MAX PROPERTIES PVT LTD | Apartment | – | Completed |
8 of 51 other projects in Magadi Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Millennium in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 815 sq m |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Apr 2022 |
| Sumadhura Pramoda | about 4 km | Locked |
|---|
| Birla Tisya | about 6 km | Locked |
|---|
| Samaya Sunshine | about 6.5 km | Locked |
|---|
| Sobha Royal Crest | about 6.5 km | Locked |
|---|
| Vista Padmalaya | about 8.5 km | Locked |
|---|
| Good Earth Ochre | about 8.5 km | Locked |
|---|
| Garden Square | about 9 km | Locked |
|---|
| Adarsh Premia | about 9 km | Locked |
|---|
| Royal Enclave | about 9 km | Locked |
|---|
| Song Of Wind | about 9 km | Locked |
|---|
| Good Earth Cadence | about 9 km | Locked |
|---|
| Renaissance Srichakra | about 10 km | Locked |
|---|
| Millennium This project | This project is the point the others are measured from | 30 Apr 2022 | – | Not verified yet |
|---|---|---|---|---|
| Sumadhura Pramoda | about 4 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Birla Tisya | about 6 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
| Samaya Sunshine | about 6.5 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Sobha Royal Crest | about 6.5 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
| Vista Padmalaya | about 8.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Good Earth Ochre | about 8.5 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
| Projects within 4 km, counted | 7 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 1,114 | |
| Booked | 457 of 1,114 (41%) | |
| Unsold | 657 | |
| Booked a month, pooled | 20 flats | |
| Months to sell, pooled | 28 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Mallathahalli lake inlet Muddaiahna palya road |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Malathahalli |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Schedule end | 20 Jan 2022 | |
|---|---|---|
| RERA completion date | 30 Apr 2022 | Red flag |
| Work began, as filed | 30 Dec 2020 |
| Estimated cost, at registration | ₹3.97 Cr |
|---|
| Escrow bank | HDFC · MAGADI CHORD EXTN, VIJAYANAGAR |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4 km, Jnanabharathi | |
| Metro, under construction | about 12.5 km, Lakkasandra |
| Kempegowda Airport | 35.5 |
| MG Road (CBD) | 12.5 |
| Manyata Tech Park | 17 |
| ITPL, Whitefield | 27 |
| Ecospace, Bellandur ORR | 21 |
| Electronic City Ph 1 | 24.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Mallathahalli Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 2 km to the west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south-west |