Overview
Prestige Kew Gardens
Overview
Prestige Kew Gardens
Overview
Prestige Kew Gardens
Overview
Photo: parikshit kulkarniTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2019 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
Land · ₹275.44 Cr 47.2%
Loan & collateral
| Escrow bank | J&K BANK · Mission Road |
|---|
Data room
39 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Adarsh Palm RetreatLapsed · completion date passed | Adarsh Developers | Apartment | 975–5,250 sqft | – |
| Adarsh Palm Retreat Mayberry-Phase 1Lapsed · completion date passed | Akarsh Residence Pvt Ltd | Apartment | 1,757–2,706 sqft carpet (as filed) | Mar 2026 |
| Adarsh RosewoodActive · 15% built | Adarsh Developers | Apartment | 1,335–1,900 sqft | Dec 2027 |
| Aishwarya SiliconLapsed · completion date passed | M/s.AISHWARYA BUILDCON DEVELOPERS | Apartment | 1,084 sqft carpet (as filed) | Apr 2022 |
| August GrandCompleted (regulator flag) | August Ventures Private Limited | Apartment | 1,944 sqft carpet (as filed) | Completed |
| Balaji MonarchCompleted · OC 04-12-2020 | SRI BALAJI BUILDERS | Apartment | 835 sqft carpet (as filed) | Completed |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Kew Gardens in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 61,337 sq m | |
|---|---|---|
| Sale deed | 18 Sep 2020 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Parkland, price locked; Century Regalia (Project 2), price locked; Adarsh Rosewood, price locked.
| Adarsh Parkland | 3.3 km | Locked | |
|---|---|---|---|
| Century Regalia (Project 2) | 3.6 km | Locked | |
| Adarsh Rosewood | 3.9 km | Locked | |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 4 km | Locked | |
| SOBHA Neopolis | 4.2 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 4 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 4 km | Locked | |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 4 km | Locked | |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 4 km | Locked | |
| Aydin Infra Signature 3 | 4.4 km | Locked | |
| Satori Residence By Genurise | 4.9 km | Locked | |
| Ranka Iris | about 5 km | Locked |
| Prestige Kew Gardens This project | This project is the point the others are measured from | 31 Dec 2019 | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Parkland | 3.3 km | – | – | Locked |
| Century Regalia (Project 2) | 3.6 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Adarsh Rosewood | 3.9 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 4 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
| SOBHA Neopolis | 4.2 km | 31 Dec 2028 | 95% (570 of 600) | Locked |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 4 km | 31 Dec 2030 | 98% (220 of 225) | Locked |
| Rent, 4BHK, 3 km | ₹85,000 /mo · 8 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹67,000 /mo · 196 listings | |
| Rent, 2BHK, 3 km | ₹37,000 /mo · 243 listings | |
| Rent, 1BHK, 3 km | ₹17,500 /mo · 136 listings | |
| Rent per sq ft, 3 km | ₹37.7 /mo, as listed · 230 listings with a size |
| Projects within 4 km, counted | 25 (11 with an approximate location) | |
|---|---|---|
| Flats in them | 5,153 | |
| Booked | 2,604 of 5,153 (51%) | |
| Unsold | 2,549 | |
| Booked a month, pooled | 80 flats | |
| Months to sell, pooled | 29 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 980 m, HAL Airport Road |
| Nearest storm drain | 160 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 10 m, an unnamed water body |
| Schedule end | 30 Nov 2019 | |
|---|---|---|
| RERA completion date | 31 Dec 2019 | |
| Work began, as filed | 10 Jun 2016 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹583.22 Cr |
|---|
| Escrow bank | J&K BANK · Mission Road |
|---|
| K-RERA registrations under this promoter | 66 | |
|---|---|---|
| Marked completed | 37 | |
| Past promised date, not completed | 10 | |
| Other phases under this promoter name | 33 | |
| With a filed extension or completion | 19 (17 completed, 2 extended) | |
| Average schedule slip | 2 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Bilva ElinaLapsed · completion date passed | Jagadish v | Apartment | – | Jul 2019 |
| Carbon Corner StoneCompleted (regulator flag) | CARBON DEVELOPERS Pvt Ltd | Apartment | – | Completed |
8 of 44 other projects in Bellandur, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 370 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 160 m to the east, tertiary drain | |
|---|---|---|
| Ground level | 884 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.0 km, Seetharam Palya | |
| Metro, under construction | 1.9 km, Kadubeesanahalli |
| Kempegowda Airport | 46.6 | 48 | 28.2 |
| MG Road (CBD) | 13.0 | 19 | 8.9 |
| Manyata Tech Park | 19.3 | 26 | 12.6 |
| ITPL, Whitefield | 13.4 | 16 | 7.7 |
| Ecospace, Bellandur ORR | 4.8 | 10 | 2.4 |
| Electronic City Ph 1 | 19.4 | 27 | 12.0 |
| Landfill or waste transfer station | 1.9 km to the west | |
|---|---|---|
| Sewage treatment plant | 720 m to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the west |