Overview
Puravankara Codename Da Vinci
Overview
Puravankara Codename Da Vinci
Overview
Puravankara Codename Da Vinci
Overview
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Adarsh Palm RetreatLapsed · completion date passed | Adarsh Developers | Apartment | 975–5,250 sqft | – |
| Adarsh Palm Retreat Mayberry-Phase 1Lapsed · completion date passed | Akarsh Residence Pvt Ltd | Apartment | 1,757–2,706 sqft carpet (as filed) | Mar 2026 |
| Adarsh RosewoodActive · 15% built | Adarsh Developers | Apartment | 1,335–1,900 sqft | Dec 2027 |
| Aishwarya SiliconLapsed · completion date passed | M/s.AISHWARYA BUILDCON DEVELOPERS | Apartment | 1,084 sqft carpet (as filed) | Apr 2022 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| August GrandCompleted (regulator flag) | August Ventures Private Limited | Apartment | 1,944 sqft carpet (as filed) | Completed |
| Balaji MonarchCompleted · OC 04-12-2020 | SRI BALAJI BUILDERS | Apartment | 835 sqft carpet (as filed) | Completed |
| Bilva ElinaLapsed · completion date passed | Jagadish v | Apartment | – | Jul 2019 |
| Carbon Corner StoneCompleted (regulator flag) | CARBON DEVELOPERS Pvt Ltd | Apartment | – | Completed |
8 of 44 other projects in Bellandur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Puravankara Codename Da Vinci in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Adarsh Rosewood | about 2 km | Locked |
|---|
| Satori Residence By Genurise | about 2.5 km | Locked |
|---|
| Adarsh Parkland | about 3 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | Locked |
|---|
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | Locked |
|---|
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3.5 km | Locked |
|---|
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3.5 km | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3.5 km | Locked |
|---|
| SOBHA Neopolis | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 4 km | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 4 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 4 km | Locked |
|---|
| Puravankara Codename Da Vinci This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Rosewood | about 2 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Satori Residence By Genurise | about 2.5 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Adarsh Parkland | about 3 km | – | – | Locked |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | 31 Dec 2030 | 98% (220 of 225) | Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | 31 Dec 2031 | 96% (289 of 302) | Locked |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3.5 km | 31 Dec 2029 | 90% (335 of 374) | Locked |
| Projects within 4 km, counted | 48 (48 with an approximate location) | |
|---|---|---|
| Flats in them | 10,905 | |
| Booked | 5,935 of 10,905 (54%) | |
| Unsold | 4,970 | |
| Booked a month, pooled | 169 flats | |
| Months to sell, pooled | 27 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Bellandur |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found |
| K-RERA registrations under this promoter | 46 | |
|---|---|---|
| Marked completed | 11 | |
| Past promised date, not completed | 11 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 6 km, Hongasandra | |
| Metro, under construction | about 0.5 km, Bellandur |
| Kempegowda Airport | 50 | 30.5 |
| MG Road (CBD) | 14.5 | 10.5 |
| Manyata Tech Park | 21 | 15 |
| ITPL, Whitefield | 15 | 9 |
| Ecospace, Bellandur ORR | 0.5 | 0.5 |
| Electronic City Ph 1 | 15 | 9.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |