Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
151 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted · OC 28-12-2023 | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 274 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sattva Aangane in the interactive atlas
Transfer of the land
Sale deed
in favour of SATTVA REALTORS PRIVATE LIMITED · Survey 23/1B, 23/2, 26/2, 25/2 and 2 more
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of SATTVA REALTORS PRIVATE LIMITED · Survey 23/1B, 23/2, 26/2, 25/2 and 2 more
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of SATTVA REALTORS PRIVATE LIMITED · Survey 23/1B, 23/2, 26/2, 25/2 and 2 more
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of SATTVA REALTORS PRIVATE LIMITED · Survey 23/1B, 23/2, 26/2, 25/2 and 2 more
K-RERA filing, land schedule
Approval or registration
Land use converted
office of the Deputy Commissioner, Bangalore District · Survey 24/1C, 24/2B
K-RERA filing, land schedule
Approval or registration
Land use converted
office of the Deputy Commissioner, Bangalore District · Survey 23/1B, 23/2, 26/2, 25/2
K-RERA filing, land schedule
Approval or registration
Land use converted
office of the Deputy Commissioner, Bangalore District · Survey 23/1B, 23/2, 26/2, 25/2
K-RERA filing, land schedule
Approval or registration
Land use converted
office of the Deputy Commissioner, Bangalore District · Survey 23/1B, 23/2, 26/2, 25/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO, Doddabanahalli village panchayth · Survey 23/1B, 23/2, 26/2, 25/2 and 2 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO, Doddabanahalli village panchayth · Survey 23/1B, 23/2, 26/2, 25/2 and 2 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO, Doddabanahalli village panchayth · Survey 23/1B, 23/2, 26/2, 25/2 and 2 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO, Doddabanahalli village panchayth · Survey 23/1B, 23/2, 26/2, 25/2 and 2 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NAMA/AA.SA/A.A-5/TA.SA-4/PU/66/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/180926/008944
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 23/1B, 23/2, 26/2, 25/2, 24/1C, 24/2B | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 40,441 sq m | |
| Khata | E Khatha · PDO, Doddabanahalli village panchayth · 15 Jan 2026 | |
| Sale deed | Dated 18 Aug 2010 | |
| Sale deed in favour of | SATTVA REALTORS PRIVATE LIMITED | |
| Building plan (BDA) | Sanctioned 2 Feb 2026 · No. BDA/NAMA/AA.SA/A.A-5/TA.SA-4/PU/66/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 21 Oct 2032 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 23/1B, 23/2, 26/2, 25/2 | Converted 24 Jun 2024 · office of the Deputy Commissioner, Bangalore District | |
| Sy 24/1C, 24/2B | Converted 20 May 2015 · office of the Deputy Commissioner, Bangalore District | |
| Survey numbers | 23/1B · 23/2 · 26/2 · 25/2 · 24/1C · 24/2B |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
TYP 01a - 3BHK+3T+3BC · avg 110 m² 12.6%TYP 04a - 3BHK+3T+2BC · avg 104 m² 12.6%TYP 03a - 3BHK+3T+3BC · avg 121 m² 9.8%Typ 04 - 3BHK+3t+2bc · avg 102 m² 6.2%33 other types 58.7%
| 3BHK+2t+3bc | 2 | 2,131 |
| 5BHK+5t+6bc-duplex | 2 | 6,178 |
| Typ 01 - 3BHK+3t+3bc | 39 | 45,391 |
| Typ 01 - 4BHK+4t+3bc | 24 | 39,213 |
| Typ 01 - 4BHK+4t+6bc-duplex | 2 | 4,919 |
| TYP 01a - 3BHK+3T+3BC | 79 | 93,517 |
| TYP 01a - 4BHK+4T+3BC | 12 | 19,676 |
| Typ 02 - 3BHK+3t+3bc | 11 | 14,230 |
| Typ 02 - 4BHK+4t+3bc | 18 | 28,923 |
| Typ 02 - 4BHK+4t+6bc-duplex | 1 | 2,852 |
| TYP 02a - 3BHK+3T+3BC | 31 | 40,655 |
| TYP 02a - 4BHK+4T+3BC |
| Sold, Q2 2026-27 | 0 / 625 | |
|---|---|---|
| Unsold, Q2 2026-27 | 625 |
| Sattva Songbird | about 1.5 km | Locked | |
|---|---|---|---|
| Godrej Woodscapes | about 1.5 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 1.5 km | Locked | |
| Godrej Splendour Phase II | about 3 km | Locked | |
| Sattva Aangane This project | This project is the point the others are measured from | 21 Oct 2032 | 0% (0 of 625) | Not verified yet |
|---|---|---|---|---|
| Sattva Songbird | about 1.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
| Godrej Woodscapes | about 1.5 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 3 km, TRIVENI NAGAR NEAR KR PURAM | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.19 (743 covered spaces for 625 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Doddabanahalli Grama Panchayath), Other | |
| Nearest city water main | Not verified yet | |
| Main structure | Not started · planned by 19 Apr 2032 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 22 Sep 2032 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 3% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 21 Oct 2032 | |
| RERA completion date | 21 Oct 2032 | |
| Work began, as filed | 1 Oct 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Tower - 1 33.3 m, Tower - 2 112.5 m, Tower - 3 122.35 m, Tower - 4 132.25 m, Tower - 7 143.35 m | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 150 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Oct 2026 | |
Land · ₹413.07 Cr 37.3%Development · ₹693.92 Cr 62.7%
| Estimated cost | ₹1106.99 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (625) 100%
| Sold, Q2 2026-27 | 0 / 625 · 625 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 625 |
| Escrow bank | ICICI Bank · Commissariat Road | |
|---|---|---|
| Designated account, collected | ₹5.7 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 1 | |
| Complaints filed against the promoter | 2 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 2 Feb 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Commissariat Road | |
| 12 |
| 19,375 |
| TYP 02a - 4BHK+4T+6BC-DUPLEX | 1 | 2,852 |
| TYP 02b - 3BHK+3T+3BC | 3 | 3,929 |
| TYP 02b - 4BHK+4T+3BC | 2 | 3,208 |
| TYP 02c - 3BHK+3T+3BC | 33 | 43,325 |
| Typ 03 - 3BHK+3t+3bc | 15 | 19,257 |
| Typ 03 - 4BHK+4t+3bc-duplex | 2 | 5,974 |
| TYP 03a - 3BHK+3T+3BC | 61 | 79,427 |
| TYP 03a - 4BHK+4T+3BC | 12 | 19,235 |
| TYP 03b - 3BHK+3T+3BC | 2 | 2,702 |
| TYP 03b - 4BHK+4T+3BC | 26 | 42,464 |
| TYP 03c - 3BHK+3T+3BC | 1 | 1,281 |
| TYP 03d - 3BHK+3T+3BC | 1 | 1,281 |
| Typ 04 - 3BHK+3t+2bc | 39 | 42,722 |
| Typ 04 - 4BHK+4t+5bc-duplex | 1 | 2,723 |
| TYP 04a - 3BHK+3T+2BC | 79 | 88,103 |
| TYP 04a - 4BHK+4T+3BC | 12 | 20,839 |
| TYP 04a - 4BHK+4T+5BC-DUPLEX | 1 | 2,723 |
| TYP 04b - 4BHK+4T+3BC | 26 | 45,553 |
| TYP 05a - 4BHK+4T+3BC | 10 | 17,933 |
| TYP 05b - 4BHK+4T+2BC | 1 | 1,787 |
| TYP 05c - 4BHK+4T+3BC | 26 | 47,167 |
| TYP 06a - 4BHK+4T+3BC | 8 | 12,884 |
| TYP 06b - 4BHK+4T+3BC | 3 | 4,833 |
| TYP 06c - 4BHK+4T+3BC | 1 | 1,615 |
| TYP 06d - 4BHK+4T+3BC | 26 | 42,517 |
| about 3.5 km |
| Locked |
| Godrej Splendour | about 3.5 km | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 4 km | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 4 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 4 km | Locked |
|---|
| Neighbourhood Tree Park | about 4 km | Locked |
|---|
| Nirmaanika Aria | about 4.5 km | Locked |
|---|
| Definer Upper Deck | about 4.5 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 |
|---|
| about 1.5 km |
| 31 Oct 2027 |
| 100% (238 of 238) |
| Locked |
| Godrej Splendour Phase II | about 3 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
|---|
| Chaithanya Sankhya | about 3.5 km | 30 Nov 2028 | 66% (29 of 44) | Locked |
|---|
| Godrej Splendour | about 3.5 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
|---|
| Projects within 4 km, counted | 61 (61 with an approximate location) | |
|---|---|---|
| Flats in them | 23,839 | |
| Booked | 15,031 of 23,839 (63%) | |
| Unsold | 8,808 | |
| Booked a month, pooled | 202 flats | |
| Months to sell, pooled | 41 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 18 |
| MG Road (CBD) | 17 |
| Manyata Tech Park | 13.5 |
| ITPL, Whitefield | 6 |
| Ecospace, Bellandur ORR | 14.5 |
| Electronic City Ph 1 | 23.5 |
| Landfill or waste transfer station | about 2 km to the north, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Kondaspura on OpenStreetMap |