I have purchased a 3 bhk property Magnificent Project great construction quality nice ambience.
Overview
Sri Sai Nandana Regal
Overview
Sri Sai Nandana Regal
Overview
Sri Sai Nandana Regal
Overview
Photo: Sri Sai Nandana RegalTitle & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 92 m² 81.5%2BHK · avg 71 m²
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 30 Jul 2025 | |
| Escrow bank | Union Bank of India · Poorna Pragna Layout, Uttarahalli |
Data room
98 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
I have purchased a 3 bhk property Magnificent Project great construction quality nice ambience.
Very good place , serene and peaceful atmosphere with modern amenities. Flats have ample light and ventilation.
The project is very nice and spacious , i have also visited the builders other projects and i am satisfied with their quality of construction. And also booked a flat here. The sales team was very nice and cooperative and listens to all our…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limlted | Apartment | 378 sqft carpet (as filed) | Mar 2024 |
| Aashrithaa Divine Phase IIIApplied for completion 12/10/2026 | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aashrithaa DivineCompleted (regulator flag) | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | – | Completed |
| Aiikya ForestscapeActive · 28% built | Swagatham Constructions Private Limited | Rowhouse | 323–980 sqft carpet (as filed) | Sep 2028 |
| Akruthi Green WoodsLapsed · completion date passed | BSR DEVELOPERS | Plot | – | Jan 2021 |
| Aratt AmoraCompleted · OC 09-06-2017 | ARATTUKULAM DEVELOPERS LLP | Apartment | 1,815 sqft carpet (as filed) | Completed |
| Aratt Amora Park ViewFiled as completed · no completion certificate on record | Aratt (Aashrayaa) | Villa | 1,770–2,015 sqft | – |
| Aratt Grand TownCompleted (regulator flag) | ARATT GRAND TOWN | Plot | – | Completed |
8 of 52 other projects in Jigani, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sri Sai Nandana Regal in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Anekal Planning Authority) | Sanctioned 30 Jul 2025 · No. CC/56/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-349032 · issued 16 Jun 2025 · valid until 9 Jun 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | Converted 13 Sep 2023 · D C Office, Bengaluru | |
|---|---|---|
| Survey numbers | 85/8 · 85/9 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 20 | 769 |
| 3BHK | 88 | 993 |
| Sold, Q2 2026-27 | 47 / 108 | |
|---|---|---|
| Unsold, Q2 2026-27 | 61 | |
| Months to sell, derived from filed bookings | 13 months |
| Aiikya Forestscape | about 3.5 km | Locked | |
|---|---|---|---|
| Ramky One Karnival | about 4 km | Locked | |
| Abhee Serenity Springs | about 4.5 km | Locked | |
| Vasuki Vallabha | about 5.5 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | about 6 km | Locked | |
| Sowmya Skyla | about 6.5 km | Locked | |
| K&T's Sai Sannidhi | about 8 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | about 8.5 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 8.5 km | Locked | |
| Mahindra NewHaven | about 8.5 km | Locked | |
| Mahindra Zen | about 8.5 km | Locked | |
| Azur Phase 2 | about 9 km | Locked |
| Sri Sai Nandana Regal This project | This project is the point the others are measured from | 31 Dec 2030 | 44% (47 of 108) | Not verified yet |
|---|---|---|---|---|
| Aiikya Forestscape | about 3.5 km | 30 Sep 2028 | 34% (121 of 360) | Locked |
| Ramky One Karnival | about 4 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
| Abhee Serenity Springs |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 8.5 km, SUBASH NAGARA | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 3 km to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.04 (112 covered spaces for 108 units) | |
| Power backup | Not declared |
As the promoter reported it
| Main structure | 100% · planned by 30 Oct 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Oct 2028 | |
| Completion | 37% |
| Schedule end | 30 Dec 2030 | |
|---|---|---|
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 15 Aug 2025 |
| Building heights, fire NOC | 14.92 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant's certificate, registration | Dated 4 Aug 2025 | |
| Chartered accountant, Form 4 | Dated 15 Jul 2026 | |
| Architect's quarterly progress certificate | 37% complete per the architect, as of 15 Oct 2026 | |
| Architect's quarterly progress certificate dated | 15 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 10 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.01 Cr 9.9%Development · ₹45.85 Cr 90.1%
| Estimated cost, at registration | ₹50.86 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹39.86 Cr | |
| Receivable, sold flats | ₹11.21 Cr |
Sold (47) 43.5%Unsold (61) 56.5%
| Sold, Q3 2025-26 | 3 / 108 · 105 available | |
|---|---|---|
| Sold, Q4 2025-26 | 3 / 108 · 105 available | |
| Sold, Q1 2026-27 | 13 / 108 · 95 available | |
| Sold, Q2 2026-27 | 47 / 108 · 61 available | |
| Unsold, Q2 2026-27 | 61 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 10 | |
| Sold in Q2 2026-27 | 34 | |
| Flats booked, Form 4 Q2 2026-27 | 47 |
| Escrow bank | Union Bank of India · Poorna Pragna Layout, Uttarahalli | |
|---|---|---|
| Designated account, collected | ₹16.52 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹11.10 Cr in Q2 2026-27 (67% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹7,12,05,575 | |
| Net amount withdrawable, Form 4 | ₹3,61,56,500 | |
| Escrow account, Q2 2026-27 | ₹11.10 Cr withdrawn | |
| Escrow account, Q3 2025-26 | Opened at ₹0 | |
| Escrow account to date, Q1 2026-27 | ₹3.78 Cr deposited from sales, ₹3.78 Cr withdrawn, balance ₹0 | |
| Sale proceeds realised, Q2 2026-27 | ₹16,51,61,866 |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 120 (86 completed, 34 extended) | |
| Average schedule slip | 10 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 4.5 km |
| 30 Jun 2030 |
| 38% (110 of 288) |
| Locked |
| Vasuki Vallabha | about 5.5 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
|---|
| Shriram Sapphire (Codename Ultimate) | about 6 km | 5 Nov 2028 | 100% (414 of 414) | Locked |
|---|
| Sowmya Skyla | about 6.5 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 4,531 | |
| Booked | 1,395 of 4,531 (31%) | |
| Unsold | 3,136 | |
| Booked a month, pooled | 49 flats | |
| Months to sell, pooled | 48 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Town Municipality Office Jigani) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 3 km to the north-west, tertiary drain | |
|---|---|---|
| Metro, operational | about 5.5 km, Bommasandra | |
| Metro, under construction | about 10 km, Kalena Agrahara |
| Kempegowda Airport | 61 | 45.5 |
| MG Road (CBD) | 27.5 | 20.5 |
| Manyata Tech Park | 37.5 | 28 |
| ITPL, Whitefield | 36 | 23.5 |
| Ecospace, Bellandur ORR | 24.5 | 15 |
| Electronic City Ph 1 | 9 | 6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2.5 km to the north | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |