As of 18 Nov 2026
New projects in Assam, page 5
India
1,321 projects are registered with the real estate regulator in Assam. 1,236 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
537 of the 1,236 are still filed as under construction, and 52 are already past the completion date their promoter filed.
Projects 401 to 500 of 1,236
| MUKUTA COMPLEX & RESIDENCY BLOCK A&BRERAA JO 203 OF 2026-2027 | M/S Priyangam Bharadwaj | JorhatJB Road | Other | Under construction | Dec 2029 | 48 |
| N.K.C CENTRERERAA KM 82 OF 2025-2026 | N.K.C. Enterprise | Kamrup MetroBeltola Road | Other | Under construction | Dec 2027 | 8 |
| NABAYAN HERITAGERERAA CA 116 OF 2025-2026 | Nabayan Engineer's & Builders | CacharBeltola Road, Meherpur | Other | Under construction | Jan 2027 | 15 |
| NAKESHARERAA KM 27 OF 2023-2024 | Nav Srinath Infratech Pvt Ltd | Kamrup MetroJilika patha | Other | Lapsed | Dec 2023 | 61 |
| NALINI ENCLAVEARERAKMPPROJ2020A17 | M/S Rudramukhi Enterprise | Kamrup MetroHaridev Road | Other | Lapsed | Aug 2020 | 12 |
| NAMO ENCLAVERERAA KM 60 OF 2025-2026 | Swaraj Developers | Kamrup MetroNaranarayan Path | Other | Under construction | Feb 2028 | 7 |
| NAND MAHALRERAA KM 151 OF 2025-2026 | Maa Bagala Amusement Hub | Kamrup MetroBonda | Other | Under construction | Aug 2030 | 24 |
| NARAYAN APARTMENTRERAA KM 64 OF 2025-2026 | Maa Kamakhya Developers And Realtors | Kamrup MetroSati Joymati Nagar | Other | Under construction | Jun 2029 | 20 |
| NARAYAN ENCLAVERERAA KM 153 OF 2025-2026 | M/S Abm Infratech | Kamrup MetroSouth Sarania Road | Other | Under construction | Dec 2028 | 0 |
| NARAYAN ENCLAVERERAA KU 206 OF 2024-2025 | Hallmark Developers | KamrupAmingaon Doulgobindo Road | Other | Under construction | Dec 2027 | 24 |
| NARAYANA HEIGHTSRERAA KM 52 OF 2024-2025 | Muse Design & Construction | Kamrup MetroBhupen Hazarika Path | Other | Under construction | Mar 2029 | 16 |
| NARAYANI HEMKANTA NIKETANRERAA KM 144 OF 2023-2024 | G. M. Infratech | Kamrup MetroBakulpath | Other | Lapsed | Sep 2026 | 0 |
| NARAYANI RIDDHI SIDDHIRERAA KM 96 OF 2024-2025 | G. M. Infratech | Kamrup MetroBakulpath | Other | Under constructionpast its filed completion date | Jun 2024 | 1 |
| NARAYANI SARVOPARIRERAA KM 127 OF 2023-2024 | G. M. Infratech | Kamrup MetroPNGB Road | Other | Lapsed | Mar 2026 | 8 |
| NARAYANI SHEOLALITARERAA KM 53 OF 2021 | Gm Infratech | Kamrup MetroN.H-37 | Other | Lapsed | Nov 2023 | 0 |
| NAVYAH AVENUERERAA DI 130 OF 2024-2025 | Rang Nirman | DibrugarhB.C. Das Road | Other | Under construction | Jun 2028 | 19 |
| NAVYAH LAKHI RESIDENSYRERAA DI 145 OF 2023-2024 | M/S Rang Nirman | DibrugarhKhaniya Gaon Road | Other | Under construction | Jun 2027 | 36 |
| NAVYAH PALACERERAA DI 21 OF 2022-2023 | M/S Rang Nirman | DibrugarhAT Road , Dibrugarh | Other | Lapsed | Nov 2024 | 0 |
| NAYAN ACROPOLISRERAA KM 103 OF 2021 | M/S S.S. Builders | Kamrup MetroKahilipara Main Road | Other | Lapsed | Nov 2023 | 18 |
| NC ONERERAA КM 222 OF 2026-2027 | M/S Sauvarnay Agro Warehousing | Kamrup MetroG S Road | Other | Registered | Dec 2027 | 1 |
| NCS PALAZZORERAA KM 128 OF 2021 | Ncs Estate Pvt. Ltd. | Kamrup MetroA T Road | Other | Lapsed | Sep 2018 | 0 |
| NEEHAR ENCLAVERERA KM 38 OF 2021 | Mrs. Nisha Jain | Kamrup MetroCycle Factory Road | Other | Lapsed | Dec 2022 | 0 |
| NEEL HEIGHTSRERAA KM 239 OF 2024-2025 | M/S Neel Warehousing Solutions | Kamrup MetroLalgamara Path | Other | Registered | Jan 2028 | 25 |
| NEELKANTHRERAA KM 131 OF 2025-2026 | Jia Construction | Kamrup MetroR K Mission Road | Other | Under construction | Mar 2028 | 15 |
| NEER ABODERERAA JO 126 OF 2025-2026 | Neer Constructions | JorhatSonari Gaon Road | Other | Under construction | Apr 2027 | 12 |
| NEHARS KRISHNA GREENRERAA KM 71 OF 2023-2024 | Nehars And Associates Private Limited | Kamrup MetroShishu Udyan Path | Other | Lapsed | Nov 2024 | 25 |
| NEOVEN, THE LOBS & BEN ESTATERERAA KM 82 OF 2022-2023 | Neoven Corp. | Kamrup MetroR.G.B Road | Other | Under construction | Aug 2027 | 21 |
| NIDHIVANRERAA CA 97 OF 2023-2024 | Econest Infrastructure Pvt. Ltd. | CacharAshram road | Other | Under construction | Dec 2027 | 187 |
| NIGHTINGALE TOWERRERAA JO 255 OF 2021 | M/S Bhawa Laxmi Constructions Pvt. Ltd. | JorhatDohabora Road | Other | Lapsed | Dec 2022 | 19 |
| NIKHIL NIWASRERAA KM 155 OF 2024-2025 | Jbr Construction | Kamrup MetroSawkuchi Road | Other | Lapsed | Mar 2022 | 0 |
| NIKITA PINNACLERERAA KM 177 OF 2021 | M/S Afcons | Kamrup MetroGS Road | Other | Lapsed | Oct 2022 | 0 |
| NIKITA PINNACLE PHASE 2RERAA KM 237 OF 2024-2025 | M/S Afcons | Kamrup MetroG.S. Road | Other | Lapsed | Mar 2023 | 0 |
| NILACHAL RESIDENCYRERAA BO 150 OF 2023-2024 | Umesh Sarkar, | BongaigaonCollege Road | Other | Under construction | Jun 2027 | 30 |
| NILAKANTHA ENCLAVERERAA KM 90 OF 2024-2025 | Shshreeji Developer, | Kamrup MetroHatigaon Main Road | Other | Under construction | Dec 2026 | 15 |
| NIMMI COMPLEXRERAA KM 161 OF 2024-2025 | Skyline Infra | Kamrup MetroMilan Nagar | Other | Under construction | Oct 2027 | 47 |
| NIRBHOY ENCLAVERERAA JO 201 OF 2021 | M/S Nirbhoy | JorhatA.T.Road | Other | Lapsed | Mar 2025 | 30 |
| NIRBHOY NIVASRERAA JO 63 OF 2023-2024 | M/S Nirbhoy | JorhatJogen Saikia Path | Other | Lapsed | Apr 2026 | 18 |
| NIRVANA BY METROPOLITAN REALTORS AND DEVELOPERSRERAA KM 34 OF 2020 | M/S Metropolitan Realtors And Developers | Kamrup MetroPunjabari Main Road | Other | Lapsed | Dec 2024 | 19 |
| NIRVANA BY METROPOLITAN REALTORS AND DEVELOPERS PHASE2RERAA KM 241 OF 2024-2025 | Metropolitan Realtors And Developers | Kamrup MetroPanjabari Main Road | Other | Lapsed | Sep 2025 | 6 |
| NIRVANA HEIGHTSRERAA KU 213 OF 2024-2025 | M/S Sns Developers | KamrupPani Tanki Road | Other | Under construction | Feb 2029 | 22 |
| NISHANT VISTARERAA KM 173 OF 2023-2024 | M/S Nishant Developers | Kamrup MetroGanesh Mandir Path | Other | Registered | Sep 2027 | 17 |
| NIVAM REGALIA / AUSPIRE NIVAMRERAA KM 65 OF 2023-2024 | M/S Nirmaan | Kamrup MetroNh 37 | Other | Under construction | Jul 2028 | 352 |
| NJ ZODIAC ENCLAVERERAA KM 18 OF 2025-2026 | Zodiac Construction | Kamrup MetroPanjabari Road | Other | Registered | Dec 2026 | 9 |
| NURJAHAN APARTMENTRERAA KM 197 OF 2021 | M.B.S. Realtors | Kamrup MetroLichubagan Road | Other | Lapsed | Jan 2023 | 16 |
| OASIS RESIDENCYRERAA JO 197 OF 2024-2025 | Diganta Baruah | JorhatJail Road | Other | Under construction | Dec 2026 | 48 |
| OBERON ENCLAVERERAA KM 37 OF 2023-2024 | Oberon Constructions Private Limited | Kamrup MetroNh-27 | Other | Lapsed | Aug 2025 | 10 |
| OM SAI APARTMENTRERAA KM 186 OF 2024-2025 | M/S Sibananda Das Builders, | Kamrup MetroNamghar Path | Other | Registered | Dec 2027 | 14 |
| OQTIS ARCADIARERAA KM 177 OF 2025-2026 | Oqtis Infra Private Limited | Kamrup MetroDharapur -Palashbari Main Road | Other | Under construction | Apr 2027 | 5 |
| OQTIS ARCADIARERAA KM 265 OF 2021-2022 | Oqtis Infra Pvt. Ltd. | Kamrup MetroDharapur -Palashbari Main Road | Other | Lapsed | Dec 2026 | 0 |
| P R HEIGHTRERAA KM 231 OF 2021 | P R India Commercials Private Limited | Kamrup MetroA K Deb Road | Other | Lapsed | Dec 2025 | 0 |
| PABITARA APARTMENT BLOCK-1RERAA KM 61 OF 2023-2024 | L.G. Construction | Kamrup MetroNarengi Chandrapur Road | Other | Lapsed | Dec 2024 | 31 |
| PACIFIC GARDENRERAA BO 155 OF 2023-2024 | Arohon Developers | BongaigaonBongaigon College Road | Other | Under construction | Oct 2028 | 24 |
| PADMAVATI ENCLAVERERAA ST 13 OF 2025-2026 | K K Construction | SonitpurLachit Chowk | Other | Under construction | Sep 2028 | 25 |
| PALACIA ELEGENCYRERAA KM 03 OF 2021 | M P Construction | Kamrup MetroKahilipara Main Road | Other | Lapsed | Dec 2022 | 21 |
| PALACIA MAJESTICARERAA KM 224 OF 2024-2025 | M P Construction | Kamrup MetroPanjabari Road | Other | Under construction | Aug 2031 | 27 |
| PARADISE APARTMENTRERAA DU 293 OF 2026-2027 | Super Buildtech | DhubriM.G. Street | Other | Under construction | Mar 2027 | 24 |
| PARADISE SUNRISERERAA 102 OF 2022-2023 | Dr Construction | Kamrup MetroPir Azan Fakir Road | Other | Lapsed | Dec 2026 | 22 |
| PARAMOUNT ENCLAVERERAA JO 75 OF 2023-2024 | Paramount Engineers | JorhatMalowali | Other | Under constructionpast its filed completion date | Feb 2026 | 46 |
| PARAMOUNT GRANDEARERAKMPPOROJ2017-30 | M/S Paramount Grande | Kamrup MetroNh-37 | Other | Lapsed | Dec 2019 | 0 |
| PARAMOUNT SQUAREARERAKMPPROJ2017-50 | M/S Paramount Square | Kamrup MetroVIP Road | Other | Lapsed | Jun 2019 | 0 |
| PARAMOUNT URBANARERAA KM 260 OF 2026-2027 | Agarwalla Brothers | Kamrup MetroNh 32 | Other | Under construction | Dec 2031 | 0 |
| PARASOL CEDARRERAA KM 159 OF 2024-2025 | M/S Parasol Engineering Associates | Kamrup MetroLokhra Road | Other | Under construction | May 2027 | 9 |
| PARASOL MAPLERERAA KM 70 OF 2022-2023 | M/S Parasol Engineering Associates | Kamrup MetroKahilipara Road | Other | Lapsed | Apr 2023 | 8 |
| PARK AVENUE RESIDENCYRERAA NN 14 OF 2024-2025 | Vertical Developers | NagaonNagaon-Morigaon Road | Other | Under construction | Oct 2028 | 63 |
| PARVATI ENCLAVERERAA NN 104 OF 2021 | Alok Developer | NagaonB.B. Road | Other | Lapsed | Apr 2024 | 0 |
| PD ENCLAVERERAA DI 215 OF 2025-2026 | Global Techno Services | DibrugarhJayanagar | Other | Under construction | Mar 2029 | 16 |
| PEARL GRANDRERAA CA 109 OF 2025-2026 | The Pearl Shells Infrastructure | CacharChengcoorie Road | Other | Under construction | Jan 2027 | 35 |
| PERCEPT EDIFICERERAA KM 66 OF 2023-2024 | Percept Infratech | Kamrup MetroMother Teresa Road | Other | Under construction | Dec 2026 | 10 |
| PERCEPT METRO HEIGHTSRERAA KM 141 OF 2023-2024 | Percept Infracon | Kamrup MetroSatirtha Path | Other | Under construction | Dec 2027 | 28 |
| PERCEPT ORCHID HEIGHTSRERAA KM 184 OF 2023-2024 | Sayeed Ahmad Karim | Kamrup MetroParag Das Path | Other | Under construction | Dec 2026 | 15 |
| PERCEPT SQUARERERAA KM 59 OF 2023-2024 | Percept Infra Realtors Pvt Ltd. | Kamrup MetroR.G Baruah Road | Other | Under constructionpast its filed completion date | Sep 2024 | 0 |
| PIYA ELITERERAA KM 72 OF 2022-2023 | Pragjyotish Housing Private Limited | Kamrup MetroUday Nagar Path | Other | Under construction | Jul 2027 | 425 |
| PIYA ELITE- PHASE IIRERAA KM 172 OF 2023-2024 | Pragjyotish Housing Private Limited | Kamrup MetroUday Nagar Path | Other | Under construction | Jun 2028 | 518 |
| PIYA HEIGHTSRERAA KM 64 OF 2023-2024 | M/S Pragjyotish Housing Private Limited | Kamrup MetroBhagaduttapur Road | Other | Under construction | Jun 2028 | 0 |
| PIYA MANSIONRERAA KM 40 OF 2024-2025 | M/S Pragjyotish Housing Private Limited | Kamrup MetroDr Zakir Hussain Rd | Other | Under construction | Dec 2026 | 7 |
| PRABHANJALI RESIDENCYRERAA DI 251 OF 2021 | M/S Amar Construction Company | DibrugarhBishnu Nagar Lane | Other | Lapsed | Mar 2022 | 0 |
| PRAFULLA ALAYRERAA KM 41 OF 2025-2026 | Surjya Mahanta, | Kamrup MetroMRG Road | Other | Under construction | Nov 2028 | 10 |
| PRAGATI HEIGHTSARERAKMPPROJ2017-89 | M/S Pragati Builders | Kamrup MetroPiyoli Phukan Road | Other | Lapsed | Oct 2023 | 0 |
| PRAGATI RESIDENCYRERAA KM 211 OF 2021 | M/S Pragati | Kamrup MetroBarnachal Road | Other | Lapsed | Jun 2021 | 0 |
| PRAKRITI BISHNU ELITERERAA KM 04 OF 2024-2025 | Prakriti Infra | Kamrup MetroDwarka Nagar | Other | Lapsed | Sep 2025 | 6 |
| PRAKRITI SHOM SATYARERAA KM 56 OF 2024-2025 | Prakriti Shom, A Join Venture | Kamrup MetroRajgarh Link Road | Other | Lapsed | Sep 2026 | 32 |
| PRAKRITI TARAMINDRERAA KM 33 OF 2020 | M/S Prakriti Infra | Kamrup MetroMother Teresa Road | Other | Lapsed | Sep 2023 | 3 |
| PRANANATH KRISHNA HEIGHTRERAA NN 36 OF 2025-2026 | Tenements | NagaonBimal Bora Path | Other | Under construction | Jul 2028 | 29 |
| PRATIBHALOYRERAA KM 42 OF 2025-2026 | City Moor Realtors | Kamrup MetroUzzalnagar Road | Other | Under construction | Mar 2027 | 12 |
| PRATIMA COMPLEXRERAA DI 01 OF 2023-2024 | Shri Bulbul Gogoi | DibrugarhDuliajan Girls College Road | Other | Lapsed | Dec 2024 | 36 |
| PRESTIGERERAA JO 100 OF 2024-2025 | M/S Pawan Kumar Agarwal | JorhatD C B Road | Other | Under constructionpast its filed completion date | May 2026 | 0 |
| PRIDE HERITAGERERAA KM 21 OF 2024-2025 | Pride Construction (Jv) | Kamrup MetroFakruddin Ali Ahmed Road | Other | Under construction | Sep 2028 | 21 |
| PRIME PARADISERERAA NN 52 OF 2022-2023 | M/S Prime Paradise | NagaonDhing Road | Other | Under constructionpast its filed completion date | Mar 2026 | 62 |
| PRINCE ENCLAVE PHASE IIRERAA JO 160 OF 2021 | M/S Bhawalaxmi Constructions Pvt. Ltd. | JorhatBaruah Chariali | Other | Lapsed | Dec 2022 | 36 |
| PRITAMS ENCLAVERERAA KM 168 OF 2023-2024 | Shreeji Developer, | Kamrup MetroHatigaon Main Road | Other | Under constructionpast its filed completion date | Apr 2026 | 8 |
| PRITI ENCLAVERERAA KM 57 OF 2023-2024 | Haradhan Debnath | Kamrup MetroSreenagar Road | Other | Lapsed | May 2026 | 11 |
| PROBHA NANI RESIDENCYRERAA KM 153 OF 2024-2025 | Madhab Sarmah | Kamrup MetroAugust Kranti Path | Other | Under construction | Dec 2026 | 20 |
| PROBODH RESIDENCYRERAA KM 25 OF 2024-2025 | P. Gogoi And Associates Pvt. Ltd. | Kamrup MetroHengrabari Road | Other | Under construction | Dec 2026 | 28 |
| PROFULLA APARTMENTRERAA JO 91 OF 2022-2023 | Sriprakash Baruah | JorhatClub Road | Other | Lapsed | Mar 2026 | 34 |
| PROGRESSIVE CROWNRERAA CA 245 OF 2026-2027 | Assam Progressive Developers Limited | CacharNational Highway Road | Other | Under construction | Sep 2029 | 48 |
| PUBERUN APARTMENTRERAA KM 50 OF 2022-2023 | Puberun Real Estate Pvt. Ltd. | Kamrup MetroBishnu Rabha Path | Other | Lapsed | Jan 2026 | 25 |
| PUBERUN APARTMENT - IIIRERAA KM 105 OF 2021 | Puberun Real Estate Pvt. Ltd. | Kamrup MetroBishnu Rabha Path | Other | Lapsed | Jul 2024 | 30 |
| PUBERUN HEIGHTSRERAA KM 133 OF 2025-2026 | Puberun Real Estate Pvt. Ltd. | Kamrup MetroBrindaban Path | Other | Under construction | Dec 2029 | 51 |
| PURNA KAMALA ENCLAVERERAA JO 12 OF 2025-2026 | Binayak Constructions | JorhatA.T. Road | Other | Under construction | Jun 2028 | 21 |
| PURUSHOTTAM APARTMENTRERAA BO 294 OF 2026-2027 | Destiny Developers | BongaigaonT R Phukan Road | Other | Under construction | Dec 2028 | 26 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region