As of 18 Nov 2026
New projects in Assam, page 7
India
1,321 projects are registered with the real estate regulator in Assam. 1,236 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
537 of the 1,236 are still filed as under construction, and 52 are already past the completion date their promoter filed.
Projects 601 to 700 of 1,236
| SHIVALAYRERAA KM 142 OF 2025-2026 | Capital Developers | Kamrup MetroKahilipara Main Road | Other | Registered | Oct 2028 | 12 |
| SHIVAM APARTMENTSRERAA DI 24 OF 2021 | Suresh Kumar Khemani | DibrugarhMancotta Road | Other | Lapsed | Dec 2022 | 7 |
| SHIVAM ENCLAVERERAA KM 41 OF 2021 | M/S Shivam Enclave | Kamrup MetroJaimati Nagar | Other | Lapsed | Jan 2026 | 0 |
| SHIVAM ENCLAVE BLOCK BRERAA KM 48 OF 2024-2025 | Shivam Enclave | Kamrup MetroJaimati Nagar | Other | Lapsed | Dec 2025 | 25 |
| SHIVAM'S THE HORIZONRERAA 82 OF 2021 | Shivam Developers | Kamrup MetroSubhsh Pally | Other | Lapsed | Feb 2020 | 48 |
| SHREE ANANTA EXOTICARERAA NN 94 OF 2024-2025 | M/S S.S. Construction | NagaonAt Road | Other | Under construction | Dec 2027 | 22 |
| SHREE NAKUL HOMESRERAA JO 06 OF 2024-2025 | M/S Shree Developers | JorhatJail Road | Other | Under construction | Jan 2029 | 40 |
| SHREE SHIVA ENCLAVE PHASE IIRERAA KM 134 OF 2023-2024 | M/S Shree Builders | Kamrup MetroJilika Path | Other | Under construction | Mar 2027 | 37 |
| SHREE TOWERRERAA KM 83 183 OF 2023-2024 | Rashi Real Estate | Kamrup MetroOdalbakra Main Road | Other | Under construction | Dec 2027 | 90 |
| SHREEJA PARADISE PHASE 2RERAA KM 142 OF 2024-2025 | Shreeja Buildcon Llp | Kamrup MetroPatorkuchi Road | Other | Lapsed | Dec 2025 | 12 |
| SHRI BISHNURERAA KM 227 OF 2026-2027 | M/S Barua Constructions | Kamrup MetroBhabanand Boro Path | Other | Under construction | Apr 2029 | 39 |
| SHRISTI ALAKANANDARERAA KM 115 OF 2024-2025 | Shristi Developers | Kamrup MetroBeltola Tiniali | Other | Lapsed | Sep 2025 | 10 |
| SHRISTI AMANRERAA KM 96 OF 2021 | Shristi Developers | Kamrup MetroHastinapur Road | Other | Lapsed | Dec 2021 | 15 |
| SHRISTI ANANTARERAA KM 190 OF 2026-2027 | Shristi Developers | Kamrup MetroLokhra Road | Other | Under construction | Dec 2031 | 152 |
| SHRISTI DHARMESWARRERAA KM 100 OF 2021 | Shristi Developers | Kamrup MetroDinesh Ojha Path, Rajgarh Road | Other | Lapsed | Mar 2023 | 10 |
| SHRISTI DURLAVRERAA NB 286 OF 2026-2027 | Shristi Developers | NalbariBhagatpara Road | Other | Under construction | Dec 2029 | 48 |
| SHRISTI GOVINDARERAA KM 92 OF 2025-2026 | Shristi Developers | Kamrup MetroRajgarh Main Road | Other | Under construction | Feb 2027 | 8 |
| SHRISTI POINT-IIARERAKMPPROJ2017-87 | M/S Shristi Planners | Kamrup MetroBeltola- Tiniali | Other | Lapsed | Dec 2019 | 0 |
| SHRISTI PRATISTHARERAA KM 99 OF 2021 | Shristi Developers | Kamrup MetroNs Road | Other | Lapsed | Dec 2024 | 50 |
| SHRISTI PRIDERERAA KM 98 OF 2021 | Shristi Developers | Kamrup MetroPatarkuchi Road, Basistha | Other | Lapsed | Sep 2023 | 36 |
| SHRISTI RATANRERAA KM 101 OF 2025-2026 | Shristi Developers | Kamrup MetroRajgarh Main Road | Other | Under construction | Sep 2029 | 20 |
| SHRISTI SHARDARERAA KM 92 OF 2024-2025 | M/S S.S. Construction | Kamrup MetroDr Jakir Hussain Road | Other | Registered | Feb 2025 | 8 |
| SHRISTI SIDDHARTHRERAA KM 171 OF 2024-2025 | Shristi Developers | Kamrup MetroMayuri Path | Other | Lapsed | Sep 2025 | 16 |
| SHRISTI SURYA APARTMENTRERAA KM 270 OF 2021-2022 | M/S S S Construction | Kamrup MetroLast Gate | Other | Lapsed | Jun 2024 | 0 |
| SHYAM HEIGHTSRERAA JO 62 OF 2025-2026 | Bansal Constructions | JorhatMain Road Mariani | Other | Under construction | Mar 2028 | 51 |
| SILVER NILAYARERAA KM 309 OF 2026-2027 | Suyash Infra Projects | Kamrup MetroJn Borooah Lane | Other | Under construction | Oct 2031 | 37 |
| SINGHA APARTMENTRERAA TI 53 OF 2024-2025 | Singha Apartments | TinsukiaBorpather | Other | Lapsed | Jun 2024 | 15 |
| SINGHA APARTMENT BLOCK ARERAA TI 29 OF 2025-2026 | Rajesh Singha | TinsukiaS. Dohutia Road | Other | Lapsed | Aug 2022 | 30 |
| SITANATH RAJMAHAL TOWERRERAA JO 213 OF 2021 | M/S Bhawa Laxmi Constructions Pvt. Ltd. | JorhatNa-Ali | Other | Lapsed | Jun 2019 | 0 |
| SIVA MUKTI HEIGHTRERAA SV 82 OF 2024-2025 | Civcon | SivasagarPd Chaliha Road | Other | Lapsed | Dec 2024 | 25 |
| SKYBROOK RESIDENCESRERAA KM 98 OF 2025-2026 | Alliance Plus Llp | Kamrup MetroKanaklata Path | Other | Under construction | Jan 2030 | 57 |
| SKYLINE RESIDENCYRERAA ST 165 OF 2025-2026 | Kuber Infra | SonitpurMurhateteli Road | Other | Under construction | Mar 2028 | 24 |
| SKYWALK TOWERSRERAA KM 127 OF 2025-2026 | S.S. Buildcon | Kamrup MetroA.K.Dev Road | Other | Under construction | Jul 2030 | 130 |
| SMARTLIVING RESIDENCYARERAKMPPROJ2017-114 | Ms Smartliving Realtors & Interiors | Kamrup MetroVip Road | Other | Lapsed | Dec 2022 | 16 |
| SMRITI ENCLAVERERAA CA 148 OF 2025-2026 | Starling Constructions | CacharChandmari Road | Other | Lapsed | Dec 2026 | 22 |
| SMRITI ENCLAVERERAA KM 42 OF 2024-2025 | Grihanirman | Kamrup MetroHengarabari | Other | Lapsed | Feb 2025 | 10 |
| SMRTLIVING APARTMENTRERA KM 86 OF 2021 | Smartliving Reltors & Interiors | Kamrup MetroTribeni Path | Other | Lapsed | Oct 2023 | 15 |
| SNB APARTMENTRERAA ST 185 OF 2024-2025 | M/S Good Steel | SonitpurMain Road | Other | Lapsed | Dec 2020 | 30 |
| SNEHA HEIGHTSRERAA JO 92 OF 2023-2024 | Sneha Construction | JorhatBG Road | Other | Lapsed | Aug 2025 | 0 |
| SNEHALATA APARTMENTSRERA KM 31 OF 2021 | Santanu Choudhury | Kamrup MetroPiyoli Phukan Road | Other | Lapsed | Dec 2022 | 24 |
| SORAI SAAPORIRERAA KM 211 OF 2024-2025 | Ram Janki Construction | Kamrup MetroMathura Nagar | Other | Under construction | Dec 2028 | 9 |
| SPARSH ENCLAVERERAA KM 94 OF 2023-2024 | Sri Pragyay Realtors Private Limited | Kamrup MetroNandan Path | Other | Lapsed | Apr 2023 | 12 |
| SPRING GARDENRERAA KM 93 OF 2022-2023 | J.R.M. Developer | Kamrup MetroSankar Azan Path | Other | Lapsed | Oct 2026 | 20 |
| SRI GANESH APARTMENTRERAA KM 51 OF 2023-2024 | Md Realty And Infracon | Kamrup MetroPub sarania main road | Other | Lapsed | Jul 2025 | 26 |
| SRIDHAR APARTMENTSRERAA JO 61 OF 2025-2026 | President Builders And Developers | JorhatKuladhar Chaliha Road | Other | Under construction | Feb 2031 | 42 |
| SRISHTI BK COMPLEXRERAA KM 161 OF 2025-2026 | Piush Construction | Kamrup MetroAirport Road | Other | Under construction | Oct 2031 | 90 |
| SS AAPARTMENTRERAA KM 126 OF 2024-2025 | S.S.Developer | Kamrup MetroGovt Press Road | Other | Lapsed | Aug 2026 | 9 |
| ST. URBANRERAA KM 127 OF 2024-2025 | Syed Abdul Majid | Kamrup MetroNh-37 | Other | Lapsed | Mar 2026 | 1 |
| STARBRIK AYODHYARERAA CA 252 OF 2026-2027 | Starbrik Infra Llp | CacharChirukandi Road | Other | Under construction | Oct 2029 | 0 |
| SUBHA BHAGYARERAA TI 146 OF 2025-2026 | Subha Bhagya | TinsukiaGandhi Park Road | Other | Registered | Nov 2025 | 35 |
| SUBHAM ASHOK HEIGHTSRERAA KM 281 OF 2026-2027 | Subham Infra | Kamrup MetroSonkuchi Path | Other | Under construction | Jul 2031 | 81 |
| SUBHAM ASHRAYRERAA KM 113 OF 2022-2023 | Subham Ashray | Kamrup MetroGaral Palashbari Road | Other | Under construction | Jan 2028 | 381 |
| SUBHAM GARDENRERAA JO 18 OF 2022-2023 | Subham Buildcon | JorhatAT Road | Other | Registered | Mar 2027 | 371 |
| SUBHAM KISHORI HEIGHTSRERAA DI 102 OF 2025-2026 | Subham Infra | DibrugarhSeujpur | Other | Under construction | Jun 2030 | 70 |
| SUBHAM MANJUSHREEARERAKMPPROJ2020A-03 | M/S Subham Infra | Kamrup MetroA K Deb Road | Other | Lapsed | Apr 2025 | 0 |
| SUBHAM PARKRERAA BO 167 OF 2024-2025 | Subham Infra | BongaigaonChapaguri Road | Other | Under construction | Sep 2029 | 48 |
| SUBHAM PARKRERAA JO 230 OF 2024-2025 | Subham Buildcon | JorhatBhatemora Gaon | Other | Under constructionpast its filed completion date | Sep 2024 | 46 |
| SUBHAM SAPPHIRERERAA KM 61 OF 2021 | Subham Infra | Kamrup MetroNalapara Road | Other | Lapsed | Feb 2026 | 0 |
| SUKHALATA RESIDENCYRERAA KM 101 OF 2022-2023 | Pranjal Goswami And Associates | Kamrup MetroNamghar Path | Other | Under constructionpast its filed completion date | Apr 2025 | 8 |
| SUNITI ENCLAVERERAA KM 280 OF 2021-2022 | Jai Maa Kamakhya Construction | Kamrup MetroLokhra Road | Other | Lapsed | May 2025 | 0 |
| SUNRISE LEGACYRERAA KM 25 OF 2025-2026 | P.B.Construction | Kamrup MetroBasistha Road | Other | Under construction | Oct 2027 | 16 |
| SUPRIYA RESIDENCYRERAA KM 14 OF 2025-2026 | M/S Supriya Constructions | Kamrup MetroDispur Beltola Road | Other | Lapsed | Nov 2019 | 8 |
| SURAKSHA APARTMENTRERAA KM 86 OF 2024-2025 | Royal Construction | Kamrup MetroHatigaon-Bhetapara Road | Other | Lapsed | Oct 2027 | 14 |
| SURJYA ENCLAVERERAA GG 44 OF 2020 | M/S Tenements | GolaghatGolaghat Town | Other | Lapsed | Jul 2023 | 0 |
| SURUJ RESIDENCYRERAA KM 129 OF 2025-2026 | Rana Ashok Dora | Kamrup MetroSeuj nagar | Other | Under construction | Dec 2028 | 14 |
| SURYA ASPIREARERAKMPPROJ2020A 01 | M/S Sm Infrastructure Pvt. Ltd. | Kamrup MetroNh-37 | Other | Under construction | Dec 2026 | 148 |
| SURYA ASPIRE (PHASE-II)RERAA KM 31 OF 2024-2025 | Sm Infrastructure Pvt. Ltd. | Kamrup MetroNh-37 | Other | Under construction | Dec 2026 | 0 |
| SURYA KIRANRERAA DI 216 OF 2025-2026 | Omega Constructions | DibrugarhShantipara Puja Lane | Other | Under construction | Sep 2028 | 20 |
| SURYA KUNJ APARTMENTRERAA KM 317 OF 2026-2027 | Dr Amal Kumar Borpujari | Kamrup MetroBishnurabha Path | Other | Under construction | Aug 2028 | 9 |
| SURYA UDAY ENCLAVERERAA B0 159 OF 2023-2024 | Deepak Baid | BongaigaonChapaguri Road | Other | Lapsed | Jul 2024 | 1 |
| SWAGAT BHAGWATI ENCLAVERERAA KM 223 OF 2024-2025 | Picasso Realtors | Kamrup MetroG.S.Road | Other | Lapsed | Dec 2025 | 18 |
| SWAGATAM CITY CENTER1RERAA KM 19 OF 2024-2025 | M/S Swagatam City Center | Kamrup MetroM.R.B. Road | Other | Under construction | Oct 2028 | 72 |
| SWARNA APARTMENTRERAA KM 95 OF 2023-2024 | Vikash Construction | Kamrup MetroKarbi Namghar Path | Other | Lapsed | Jun 2026 | 16 |
| SWASTEEK ANANDRERAA KM 107 OF 2023-2024 | Aakash Developers | Kamrup MetroLakhara Road | Other | Lapsed | Feb 2026 | 0 |
| SWASTEEK SIDDHIARERAKMPPROJ2017-53 | M/S Aakash Developers | Kamrup MetroBhagduttapur | Other | Lapsed | Oct 2022 | 28 |
| SWASTIK APARTMENTRERAA KM 61 OF 2022-2023 | Swastik Developers | Kamrup MetroKalimandir Path | Other | Lapsed | Mar 2024 | 12 |
| SWASTIK RESIDENCYRERAA KM 08 OF 2025-2026 | Rp Construction, | Kamrup MetroKandura Rabha Path | Other | Under construction | Sep 2027 | 10 |
| SYNDICATE GRANDEURRERAA KM 199 OF 2024-2025 | Sun Syndicate Builders Pvt. Ltd. | Kamrup MetroRadha Nagar Road | Other | Under construction | Jul 2030 | 117 |
| SYNDICATE PALACE (PHASE II)RERAA KM 25 OF 2023-2024 | Sun Syndicate Builders Pvt. Ltd. | Kamrup MetroJilika Path | Other | Lapsed | Aug 2025 | 3 |
| SYNDICATE PALACE EXTENDEDPARTRERAA KM 24 OF 2020 | M/S Sun Syndicate Builders Pvt Ltd | Kamrup MetroJilika Path | Other | Lapsed | Dec 2022 | 1 |
| SYNERGY PEARLRERAA KM 258 OF 2021 | Synergy Creations (I) Pvt. Ltd. | Kamrup MetroBhetapara | Other | Lapsed | Oct 2024 | 16 |
| TARA NIWASRERAA KM 314 OF 2026-2027 | Manoj Kumar Das | Kamrup MetroPrafulla Path | Other | Under construction | Dec 2028 | 12 |
| TARINI ENCLAVEARERAKMPPROJ2017-81 | Mr. Ujjal Boro | Kamrup MetroSeuji Path | Other | Lapsed | Jun 2023 | 18 |
| TASHI HEIGHTSRERAA KM 58 OF 2023-2024 | Adhunik Developers | Kamrup MetroBishnupur Main Road | Other | Registered | Jan 2028 | 56 |
| TEE25 CUARTORERAA JO 225 OF 2024-2025 | M/S Tessellate Design And Engineering Consultancy | JorhatA.T. Road | Other | Under construction | Nov 2026 | 23 |
| TEE25 CUARTOARERAJOP0000102017-2 | M/S Tessellate Design And Engineering Consultancy | JorhatA.T. Road | Other | Revoked | Dec 2024 | 0 |
| TEERTHADEEP ENCLAVERERAA NB 131 OF 2023-2024 | Pee Bee Techno Trade Pvt Ltd | NalbariDic Road | Other | Lapsed | Nov 2024 | 35 |
| TERAN RESIDENCYRERAA KM 111 OF 2022-2023 | Anirudha Paul | Kamrup MetroKahilipara Road | Other | Lapsed | Dec 2025 | 23 |
| THE 16TH CHAMBERRERAA KM 90 OF 2025-2026 | Shiv Construction | Kamrup MetroPandav Nagar | Other | Under construction | Oct 2027 | 16 |
| THE 95RERAA KM 37 OF 2022-2023 | M/S Maa Associates | Kamrup MetroA K Azad Road | Other | Lapsed | Apr 2026 | 89 |
| THE ADDRESSRERAA KM 117OF 2022-2023 | Aakriti Construction | Kamrup MetroRajiv Gandhi Road | Other | Lapsed | Mar 2025 | 20 |
| THE EMERALDRERAA ST 59 OF 2025-2026 | Kaustab & Shayan Infracon Llp | SonitpurPwd Colony Road | Other | Under construction | Dec 2027 | 61 |
| THE ENTELLUSRERAA KM 186 OF 2023-2024 | Laxmi Narayan Kraft Industries | Kamrup MetroMc Road | Other | Under construction | Oct 2027 | 28 |
| THE ESTATERERAA ST 91 OF 2023-2024 | Impl Builders | SonitpurMission Chariali | Other | Under construction | Dec 2026 | 100 |
| THE HIGH STREETRERAA KM 13 OF 2022-2023 | Shivaditya Global Developers | Kamrup MetroG.S Road | Other | Lapsed | Jun 2025 | 0 |
| THE ICONRERAA JO 114 OF 2023-2024 | Arb Developers | JorhatAt Road | Other | Revoked | Aug 2027 | 30 |
| THE ICONRERAA JO 235 OF 2024-2025 | Arb Developers | JorhatAt Road | Other | Under construction | Feb 2028 | 7 |
| THE KATYAYANIARERAKMPPROJ2020A-17 | M/S Mkr Construction | Kamrup MetroPandu Port Road | Other | Lapsed | Nov 2022 | 17 |
| THE KIRONHANSRERAA KM 144 OF 2025-2026 | Shiv Realtors | Kamrup MetroKahikuchi Road | Other | Under construction | Jul 2030 | 52 |
| THE LINKRERAA KM 24 OF 2022-2023 | Achyut Business Park | Kamrup MetroGs Road | Other | Under construction | Mar 2027 | 161 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region