As of 18 Nov 2026
New projects in Assam, page 6
India
1,321 projects are registered with the real estate regulator in Assam. 1,236 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
537 of the 1,236 are still filed as under construction, and 52 are already past the completion date their promoter filed.
Projects 501 to 600 of 1,236
| PUSPHAS CENTRALRERAA 108 OF 2024-2025 | Pusphas Construction Pvt Ltd | Kamrup MetroTripura Road | Other | Under construction | Dec 2032 | 28 |
| PUSPHAS NESTRERAA KM 17 OF 2025-2026 | Pusphas Construction Private Limited | Kamrup MetroDilip Huzuri Path | Other | Registered | Dec 2030 | 6 |
| QUEENS VILLAGERERAA KM 77 OF 2023-2024 | Dev Shakti Ventures | Kamrup MetroBeltola Basistha Road | Other | Under construction | Dec 2027 | 86 |
| RABINDRA ENCLAVERERAA KM 174 OF 2023-2024 | Bael Infrastructure | Kamrup MetroLokhra Road | Other | Lapsed | Oct 2025 | 10 |
| RADIANT TOWERRERAA KM 142 OF 2023-2024 | M/S Radiant Developers | Kamrup MetroNalapara | Other | Lapsed | Apr 2026 | 0 |
| RAHENI ENCLAVERERAA KM 50 2025-2026 | Mbs Realtors | Kamrup MetroKhanapara | Other | Under construction | Sep 2027 | 10 |
| RAJLAXMI APARTMENTARERAKMPPROJ2017-95 | M/S Bael Infrasturture | Kamrup MetroDurga Mandap Lane | Other | Lapsed | Sep 2023 | 20 |
| RAJMEDHI APARTMENT (APURBA REALTORS)RERAA KM 141 OF 2021 | M/S Apurba Relators | Kamrup MetroPatarkuchi Road | Other | Lapsed | Jan 2021 | 2 |
| RAMDHENU APARTMENTRERAA GG 49 OF 2022-2023 | M/S Ramdhenu Construction | GolaghatNear Dhodar Road | Other | Lapsed | Jun 2026 | 108 |
| RAMENDRA NOBLE AAWASRERAA KM 147 OF 2021 | M/S Jayantom Design Associates | Kamrup MetroUdayan Path | Other | Lapsed | Apr 2021 | 21 |
| RAMESHWAR LAXMIPRIYA TOWERRERAA DR 132 OF 2025-2026 | Indreshwar Sharma | DarrangLnb Road | Other | Under construction | Dec 2028 | 17 |
| RAMKRISHNA KUTIRRERAA CA 117 OF 2024-2025 | Joy Thakur Developers Pvt. Ltd | CacharVivekananda Road | Other | Under construction | Dec 2028 | 48 |
| RANA ENCLAVERERAA KM 07 OF 2022-2023 | M/S Victor & Zena Towers Private Limited | Kamrup MetroSati Joymoti Road | Other | Under constructionpast its filed completion date | Mar 2025 | 25 |
| RANJIT REGENCYRERAA CA 195 OF 2024-2025 | Anup Kumar Deb | CacharLink Road | Other | Lapsed | Aug 2022 | 2 |
| RANJIT SUDHA ENCLAVERERAA KM 104 OF 2023-2024 | Khusi Construction | Kamrup MetroKahilipara Road | Other | Lapsed | Sep 2024 | 12 |
| RATNA ENCLAVERERAA KM 145 OF 2021 | M/S Jovi Constructions, | Kamrup MetroJagannath Mandhir Path | Other | Lapsed | Dec 2024 | 18 |
| RATNALAYA ENCLAVERERAA SV 117 OF 2025-2026 | Rp Constructions | SivasagarNh-37 | Other | Under construction | Dec 2026 | 19 |
| RECTANGULAR COURTRERAA KM 93 OF 2024-2025 | Rohan Borpujari | Kamrup MetroAsomi Path | Other | Lapsed | Dec 2023 | 9 |
| REEG PALACERERAA KM 51 OF 2022-2023 | Reegraaj Albanil Pvt. Ltd. | Kamrup MetroKalyani Sagar Path | Other | Lapsed | Feb 2025 | 8 |
| REGAL HEIGHTSRERAA KM 15 OF 2024-2025 | Sbm Motors Private Limited | Kamrup MetroNh 27 | Other | Under construction | Dec 2026 | 20 |
| RENO VILLARERA KM 67 OF 2021 | Ntrust | Kamrup MetroZoo-Narengi Road | Other | Lapsed | Dec 2025 | 0 |
| RENU ENCLAVERERAA KM 276 OF 2021-2022 | M/S Renu Enclave | Kamrup MetroZoo Narengi Road | Other | Lapsed | Dec 2025 | 0 |
| RIDHI SIDHI RESIDENCYRERAA KM 56 OF 2023-2024 | Ridhi Sidhi Residency | Kamrup MetroBisnu Rabha Path | Other | Under construction | May 2028 | 82 |
| RISCON AAWASRERAA KM 09 OF 2022-2023 | Riscon Builders Pvt. Ltd. | Kamrup MetroLachit Garh Path | Other | Under construction | Feb 2027 | 231 |
| RISCON ABODERERAA KM 134 OF 2024-2025 | Riscon Builders Private Limited | Kamrup MetroTripura Road | Other | Under construction | Oct 2029 | 31 |
| RITURAJ APARTMENT BLOCK C & DRERAA KM 06 OF 2023-2024 | M/S Guwahati Construction | Kamrup MetroSarania Mazid Road | Other | Lapsed | Sep 2023 | 18 |
| RIVER FRONT VILLASRERAA KM 224 OF 2026-2027 | Rashmi Choudhury | Kamrup MetroChusali Road | Other | Under construction | Dec 2028 | 0 |
| RIVERA HEIGHTSRERAA DI 17 OF 2024-2025 | Good Earth | DibrugarhMohanaghat Road | Other | Under construction | Jan 2027 | 82 |
| RJ IVORYRERAA BS 300 OF 2026-2027 | Rj Realtech & Properties Pvt Ltd | BiswanathKamargaon | Other | Under construction | Mar 2031 | 64 |
| RL DAS COMPLEXRERAA KM 49 OF 2021 | Mahanta Associates | Kamrup MetroPanjabari | Other | Lapsed | Nov 2020 | 0 |
| RM CREATIONRERAA KM 179 OF 2023-2024 | M/S Capital Developers | Kamrup MetroAmbari Road | Other | Registered | Dec 2026 | 20 |
| ROODRAKSH BHUYANRERAA KM 82 OF 2023-2024 | Roodraksh Infratech | Kamrup MetroBye Lane No 3 | Other | Lapsed | Mar 2023 | 12 |
| ROODRAKSH KUNDANRERAA KM 267 OF 2021-2022 | M/S Roodraksh Infratech | Kamrup MetroSathgaon, Narangi | Other | Lapsed | Jun 2025 | 0 |
| ROODRAKSH PRIDERERAA KM 31 OF 2023-2024 | Roodraksh Infratech | Kamrup MetroR G Barua Road | Other | Registered | Oct 2024 | 16 |
| ROODRAKSH RESIDENCYRERAA TI 30 OF 2023-2024 | Roodraksh | TinsukiaNau-Pukhri Rd | Other | Lapsed | Feb 2026 | 44 |
| ROODRAKSH SAPPHIRERERAA KM 02 OF 2025-2026 | Roodraksh Realty | Kamrup MetroNew Airport Road | Other | Under constructionpast its filed completion date | Dec 2025 | 0 |
| ROODRAKSH SKYLUXERERAA KM 276 OF 2026-2027 | M/S Roodraksh Infracon | Kamrup MetroSatgaon Road | Other | Under construction | Mar 2031 | 199 |
| ROOFLINE GREENRERAA KM 297 OF 2026-2027 | Roofline Construction | Kamrup MetroSanghoti Path | Other | Under construction | Jun 2031 | 24 |
| ROYAL AAWAS BETKUCHIRERAA KM 39 OF 2020 | M/S Royal Associates | Kamrup MetroRoyal Path | Other | Lapsed | Dec 2023 | 350 |
| ROYAL AAWAS BOKAKHATARERAGGP0000102017-1 | M/S Royal Aawas Bokakhat | GolaghatNh-37 | Other | Lapsed | Jan 2021 | 0 |
| ROYAL AAWAS JORHAT (PHASE I)RERAA KM 15 OF 2022-2023 | Tirupati Circle | JorhatNh 37 | Other | Lapsed | Mar 2025 | 202 |
| ROYAL AAWAS NAGAONARERANNP0000102017-1 | M/S Royal Aawas Nagaon | NagaonA.T. Road | Other | Lapsed | Mar 2022 | 0 |
| ROYAL AAWAS TEZPURARERASTP0000102017-3 | M/S Reliable Developers | SonitpurTezpur University Road | Other | Lapsed | Jul 2019 | 0 |
| ROYAL AAWAS TIRUPATIRERAA KM 46 OF 2022-2023 | Royale Associates Project Royal Aawas Tirupati | Kamrup MetroMa Manasha Mandir Path | Other | Lapsed | Jun 2026 | 490 |
| ROYAL EMPIRERERAA KM 219 OF 2026-2027 | Royal Construction | Kamrup MetroFakharuddin Ali Ahmed Road | Other | Under construction | Mar 2029 | 12 |
| ROYAL ENCLAVERERAA DU 87 OF 2025-2026 | Sumit Dey, Propreitor, Saanvi Builders | DhubriGTB Road | Other | Lapsed | Oct 2026 | 23 |
| ROYAL MANSION NAGAONRERAA NN 132 OF 2023-2024 | Reliable Associate | NagaonA.T. Road | Other | Lapsed | Jul 2026 | 98 |
| ROYAL PALACERERAA KM 164 OF 2024-2025 | Royal Construction | Kamrup MetroHatigaon Bhetapara Road | Other | Registered | Dec 2027 | 14 |
| ROYAL PINCHA MANSIONRERAA JO 133 OF 2023-2024 | Reliable Estate | JorhatChamber Road | Other | Lapsed | Jul 2026 | 23 |
| ROYAL RESIDENCYARERAKMPPROJ2017-107 | M/S Baruah Construction | Kamrup MetroNh 37 | Other | Lapsed | Aug 2025 | 1 |
| ROYAL RESIDENCYRERAA KM 125 OF 2023-2024 | Mrs. Rakhi Barua | Kamrup MetroNational Highway 37 | Other | Under construction | Mar 2027 | 67 |
| RUDRA ANUBHABRERAA KM 54 OF 2025-2026 | Jogen Goswami | Kamrup MetroLichu Bagan Road | Other | Lapsed | Sep 2024 | 6 |
| RUPALIM ENCLAVERERAA SV 23 OF 2020 | M/S Puram Construction | SivasagarA.T.Road | Other | Lapsed | Oct 2021 | 0 |
| RYKA MANSIONRERAA KM 10 OF 2025-2026 | Ryka Developers | Kamrup MetroBg Godown Road | Other | Under construction | Dec 2029 | 67 |
| S B SHALOM MANSIONRERAA KM 51 OF 2021 | M/S Luitporia Builders | Kamrup MetroMa Road | Other | Lapsed | Dec 2023 | 0 |
| S M ENCLAVERERAA KM 269 OF 2021-2022 | M/S S S Builders | Kamrup MetroB Baruah Road | Other | Lapsed | Aug 2021 | 32 |
| S R TOWERRERAA KM 268 OF 2026-2027 | Sr Real Estate | Kamrup MetroVidya Mandir Path | Other | Under construction | May 2029 | 17 |
| S. D.'S ANANDA ABASHSTHALIRERAA KM 41 OF 2024-2025 | S. D. Construction | Kamrup Metro2 | Other | Registered | Dec 2024 | 13 |
| S. D.'S DAS ABASHSTHALIRERAA KM 212 OF 2021 | Abashsthali Development Pvt. Ltd. | Kamrup Metro2 | Other | Lapsed | Aug 2021 | 0 |
| S. D.'S SASHINDRALAYRERAA KM 305 OF 2026-2027 | S D Construction | Kamrup MetroMilanpur | Other | Under construction | Mar 2027 | 9 |
| SAANVI TOWERRERAA DU 161 OF 2023-2024 | Sumit Dey, Propreitor, Saanvi Builders | DhubriG.T.B Road | Other | Registered | Mar 2027 | 15 |
| SACHAYANI APARTMENTRERAA CA 154 OF 2025-2026 | Riddhi Siddhi Construction | CacharAmbicapatty | Other | Under construction | Jun 2027 | 25 |
| SAI ENCLAVERERAA KM 119 OF 2023-2024 | M/S Dee.Dee Developers | Kamrup MetroSwammanay Path | Other | Lapsed | Mar 2025 | 8 |
| SAI TARINIRERAA KM 73 OF 2024-2025 | Kuber Construction And Communication, | Kamrup MetroUrbara Path | Other | Lapsed | Jul 2026 | 8 |
| SAIKIA RESIDENCYRERAA KM 106 OF 2023-2024 | Ariyan Construction | Kamrup MetroHatigaon Bhetapara Road | Other | Lapsed | Jun 2026 | 0 |
| SAILAJA'S DURGA RESIDENCYRERAA KM 27 OF 2024-2025 | Sailaja Construction | Kamrup MetroRupkonwar Path | Other | Under constructionpast its filed completion date | Oct 2026 | 12 |
| SAILAJA'S PARADISERERAA NN 128 OF 2023-2024 | Sailaja Construction | NagaonAdp Road | Other | Under construction | Mar 2028 | 30 |
| SAKUNTALA ENCLAVEARERAKMPPROJ2017-99 | M/S Star Enterprise | Kamrup MetroPub Jyotinagar | Other | Lapsed | Sep 2024 | 0 |
| SAM APARTMENTRERAA KM 39 OF 2025-2026 | M D Realty And Infracon | Kamrup MetroBagharbori Satgaon Road | Other | Under construction | Dec 2026 | 41 |
| SAMPRITI RAGARERA JO 35 OF 2021 | Shristi Infratech | JorhatMalowali | Other | Lapsed | Mar 2018 | 1 |
| SAMRIDDHI ENCLAVERERAA KM 126 OF 2021 | M/S Samriddhi, Bharati Niwas | Kamrup MetroPanjabari Road | Other | Lapsed | Aug 2026 | 25 |
| SAMRIDDHI HEIGHTSRERAA JO 274 OF 2026-2027 | M/S Samriddhi Builders | JorhatLakhinagar Path | Other | Under construction | Aug 2029 | 16 |
| SAMRUDDHI RESIDENCYRERAA KM 26 OF 2021 | M/S R.C. Construction | Kamrup MetroUlubari, South Sarania | Other | Lapsed | Dec 2024 | 26 |
| SANTIRALOYRERAA SV 28 OF 2023-2024 | Mr. Sukumar Momin | SivasagarPurana Patty Road | Other | Lapsed | Dec 2024 | 20 |
| SARAF HOUSERERAA KM 198 OF 2026-2027 | Rohit Saraf & Sons | Kamrup MetroS C Road | Other | Under construction | Nov 2029 | 19 |
| SARAIGHAT RESIDENCYRERAA KM 106 OF 2025-2026 | Unnayan Builders And Real Estate Developers | Kamrup MetroNh 37 | Other | Under construction | Dec 2026 | 48 |
| SARASWATI APARTMENTRERAA KM 43 OF 2024-2025 | Bajrang Real Estate Developers | Kamrup MetroPragjyotish Nagar Main Road | Other | Lapsed | Jan 2026 | 15 |
| SAROJ PARKLANDRERA KM 76 OF 2021 | Saroj Realtors And Developers Pvt Ltd | Kamrup MetroBorbari Main Road | Other | Lapsed | Dec 2024 | 0 |
| SAVOY BINNI ONYXRERAA KM 312 OF 2026-2027 | Savoy Infratech | Kamrup MetroSaukuchi | Other | Under construction | Jun 2030 | 156 |
| SAVOY PURBI SAPPHIRERERAA KM 04 OF 2025-2026 | Savoy Realtors | Kamrup MetroLokhra Road | Other | Under construction | Jun 2028 | 44 |
| SAYAN COMPLEXRERAA CA 2024-2025 | Gouranga Paul | CacharHailakandi Road | Other | Lapsed | Jun 2022 | 14 |
| SB RANDIPRERAA KM 154 OF 2023-2024 | S.B. Real Estates And Landscapes | Kamrup MetroBaghorbori Road | Other | Under construction | Jun 2028 | 15 |
| SEN BARI ABASHONRERAA CA 109 OF 2023-2024 | Anup Kumar Deb | CacharNutanpatty | Other | Lapsed | Jul 2026 | 40 |
| SG RESIDENCYRERAA KM OF 107 OF 2021 | Necon & Associates | Kamrup MetroUday Path | Other | Lapsed | Aug 2022 | 21 |
| SHAHIDA APARTMENTRERAA KM 83 OF 2021 | H B Construction | Kamrup MetroDargah Road | Other | Lapsed | Dec 2023 | 30 |
| SHANTI ENCLAVERERAA KM 77 OF 2025-2026 | Bablu Mondal | Kamrup MetroJyoti Path | Other | Under construction | Dec 2028 | 16 |
| SHANTI NIWASRERAA KM 44 OF 2024-2025 | Kunjo Construction | Kamrup MetroLokhora Road | Other | Registered | Mar 2026 | 16 |
| SHANTI RATAN GREENSRERAA KM 311 OF 2026-2027 | Fortune Constructions | Kamrup MetroGarbhanga Road | Other | Under construction | Feb 2032 | 71 |
| SHARADA GREEN'SRERAA KM 272 OF 2026-2027 | M/S Sharada Developers | Kamrup MetroBhabanand Boro Path | Other | Under construction | Mar 2031 | 49 |
| SHARADA HEIGHTSRERAA KM 222 OF 2024-2025 | M/S Sharada Developers | Kamrup MetroBidyamandir Road | Other | Under construction | Nov 2028 | 18 |
| SHARVIL RESIDENCYRERAA NN 78 OF 2024-2025 | Sharvil Associates | NagaonL.K. Road | Other | Under construction | May 2027 | 51 |
| SHASS ARIHANTRERAA KM 106 OF 2022-2023 | Shassengineers | Kamrup MetroKhanka Road | Other | Lapsed | Dec 2022 | 64 |
| SHINE SANSAARARERAKMPPROJ2017-1 | M/S Shine Seven Developers | Kamrup MetroAccoland Rani Road | Other | Lapsed | Aug 2022 | 0 |
| SHINE SHANTI GREENOARERAKMPPROJ2017-86 | M/S Shine Realtors Private Limited | Kamrup MetroPngb Road | Other | Lapsed | Dec 2023 | 0 |
| SHINE-6RERAA KM 54 OF 2021 | M/S Allied Group | Kamrup MetroSadhani Path | Other | Lapsed | Dec 2022 | 8 |
| SHIV APARTMENTRERAA KM 38 OF 2025-2026 | Bajrang Real Estate Developers | Kamrup MetroSawkuchi Tiniali Hockey Stadium Road | Other | Under construction | Dec 2027 | 12 |
| SHIVA ENCLAVERERAA KM 62 OF 2023-2024 | Nav Srinath Realtors Pvt Ltd | Kamrup MetroHaridev Road | Other | Lapsed | Nov 2023 | 12 |
| SHIVAAY HEIGHTSRERAA KM 166 OF 2021 | M/S Shivaay Developers | Kamrup MetroRajib Gandhi Road | Other | Lapsed | Dec 2024 | 48 |
| SHIVAAY HEIGHTS PHASE IIRERAA KM 111 OF 2023-2023 | M/S Shivaay Developers | Kamrup MetroJ.B. Road | Other | Registered | Dec 2024 | 7 |
| SHIVAAY NIWASRERAA KM 164 | M/S Shivaay Developers | Kamrup MetroLokhra Road | Other | Lapsed | Aug 2023 | 12 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region