| SUNAINA APARTMENTBRERAP21644-1/1165/R-1011/2020 | Magadh Raj Constructions Pvt Ltd | Patna | Apartments | Registered | Dec 2020 | 20 |
| Sundaram ResidencyBRERAP00291-1/243/R-238/2018 | StructoArch Consultants Pvt. Ltd. | Patna | Apartments | Completed | Dec 2019 | 12 |
| Sunita VillaBRERAP21712-1/1215/R-1028/2020 | Bipin Kumar Singh | Patna | Apartments | Registered | Aug 2024 | 16 |
| SUNRISE RESIDENCYBRERAP00029-5/1146/R-890/2020 | Sunrise Sai Developers Pvt. Ltd. | Patna | Apartments | Registered | Jun 2023 | 16 |
| SUNRISE SAI PLAZABRERAP00029-1/93/R-19/2018 | Sunrise Sai Developers Pvt. Ltd. | Patna | Apartments | Completed | Dec 2020 | 78 |
| SUNRISE SAI TOWERBRERAP00029-3/151/R-108/2018 | Sunrise Sai Developers Pvt. Ltd. | Patna | Apartments | Completed | Dec 2020 | 28 |
| SUNRISE SUNHARI PALACEBRERAP00029-4/187/R-52/2018 | Sunrise Sai Developers Pvt. Ltd. | Patna | Apartments | Completed | Dec 2020 | 20 |
| SURAJ PALACEBRERAP00339-1/528/R-377/2019 | Randhir Kumar | Bhojpur | Apartments | Completed | Aug 2021 | 16 |
| SURAJ TRADE CENTREBRERAP00373-6/1270/R-1236/2021 | Aura Construction | Patna | Commercial | Registered | Apr 2024 | 7 |
| SURESH PALACEBRERAP00586-1/437/R-521/2019 | Kanan Homes Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Oct 2019 | 44 |
| SURYA MANSION & CHANDRAKANTABRERAP00243-12/736/R-461/2019 | Apna Awas Construction Pvt.Ltd. | Patna | Apartments | Completed | Dec 2019 | 20 |
| SURYA SHUBHAM VIHARBRERAP00146-1/83/R-141/2018 | M S Surya Engicon | Patna | Apartments | Completed | Jul 2022 | 48 |
| Surya Shyam Vihar Block BBRERAP00104-1/33/R-34/2018 | Surya Developer and Planner Pvt ltd | Patna | Apartments | Completed | Feb 2020 | 72 |
| Surya Singh Vihar block A and BBRERAP00106-1/32/R-33/2018 | S.D.S.D. And P. Pvt. Ltd (J.V) | Patna | Apartments | Completed | Jun 2021 | 80 |
| SURYA TARUMITRA ENCLAVEBRERAP65540-1/175/R-1332/2022 | Surya Tarumitra Enclave | Patna | Apartments | Registered | Nov 2024 | 42 |
| SUSHILA COMPLEXBRERAP13424-3/122/R-1441/2022 | Kusika Tradserv Private Limited | Patna | Apartments | Registered | Aug 2026 | 98 |
| SUSHILA RESIDENCYBRERAP00373-3/565/R-630/2019 | Aura Construction | Patna | Apartments | Registered | Mar 2021 | 11 |
| Sushma EnclaveBRERAP83108-1/1003/R-754/2019 | Transform Developers | Patna | Apartments | Registered | Nov 2023 | 12 |
| SWARAJ-KAMTA ENCLAVEBRERAP00328-3/918/R-686/2019 | Swaraj Vastu Developers Pvt Ltd | Patna | Apartments | Registered | Jun 2023 | 48 |
| SWARN BHOOMIBRERAP34226-1/07/R-1186/2021 | Pritam Kumar Mohanka | Purnea | Apartments | Registered | Dec 2023 | 20 |
| TABASSUM RESIDENCYBRERAP000906-1/1108/R-976/2020 | Peace S Square Buildtech | Patna | Apartments | Registered | Nov 2024 | 25 |
| TAHERA COMPLEXBRERAP01040-1/705/R-1256/2022 | Azad Developers | Bhagalpur | Apartments | Under constructionpast its filed completion date | Dec 2019 | 12 |
| Tatharaj GharanaBRERAP00167-3/114/R-78/2018 | Gharana Associate InfraPromoters Pvt. Ltd. | Gaya | Apartments | Completed | Jan 2020 | 22 |
| TEJAS RESIDENCY 30BRERAP22821-1/06/R-1213/2021 | M/S Ratnakar Homes Infrastructure | Patna | Apartments | Registered | Mar 2024 | 9 |
| TEJASWIS FATIMA ILIYAS APARTMENTBRERAP000432-8/1213/R-944/2020 | Tejaswi Infraatech Private Limited | Darbhanga | Apartments | Registered | Feb 2023 | 96 |
| TEJASWIS LOTUS TOWERBRERAP000432-7/1198/R-945/2020 | Tejaswi Infraatech Private Limited | Darbhanga | Apartments | Registered | Jan 2023 | 14 |
| TEJASWIS SARASWATI APARTMENTBRERAP20432-9/1288/R-1249/2021 | Tejaswi Infraatech Private Limited | Darbhanga | Apartments | Registered | Nov 2023 | 20 |
| THE ASHOKA RESIDENCYBRERAP0002207-1/1204/R-985/2020 | Kaaf Infrastructure Private Limited | Gaya | Apartments | Completed | Jul 2021 | 40 |
| The CrownBRERAP93630-1/1225/R-1098/2021 | Hira Panna InfraProjects LLP | Patna | Apartments | Registered | Mar 2025 | 65 |
| THE GREAT ASHOKA CITYBRERAP00040-2/894/R-893/2020 | Aparna Architect and Engicons Pvt. Ltd | Patna | Mixed | Registered | Jan 2023 | 1,129 |
| THE IMPERIAL CROWN BODHGAYABRERAP00443-1/444/R-380/2019 | Maurya Heights Buildcon Private Limited | – | Mixed | Under constructionpast its filed completion date | Nov 2020 | 46 |
| THE LANDMARK GOLDBRERAP00037-1/112/R-199/2018 | Vhp Real Estate | Patna | Apartments | Completed | Oct 2018 | 106 |
| The NestBRERAP00325-3/289/R-647/2019 | Makan Developers (I) Pvt. Ltd. | Patna | Apartments | Registered | Dec 2020 | 30 |
| The Shoppers MallBRERAP00024-4/1265/R-1168/2021 | Concicon Construction Pvt Ltd | Patna | Commercial | Registered | Jun 2023 | 40 |
| Tribeni GalaxyBRERAP00240-1/158/R-94/2018 | Ganpati Infra Buildcon Pvt Ltd | Patna | Apartments | Completed | Dec 2019 | 32 |
| TRIBHUWAN COMPLEXBRERAP00203-1/98/R-44/2018 | Mahadev Developers | Patna | Apartments | Completed | Jul 2020 | 28 |
| Trinetri DhamBRERAP00069-5/150/R-103/2018 | Satvika Bindhyawasinis Construction Pvt. Ltd. | – | Apartments | Under constructionpast its filed completion date | Jun 2019 | 16 |
| Universal Business ParkBRERAP00693-2/689/R-908/2020 | Grih Bhoomi Nirman Pvt Ltd | Patna | Commercial | Registered | Nov 2023 | 31 |
| Universal Classic 1BRERAP00073-2/178/R-114/2018 | Universal Green Infra Ltd | Patna | Apartments | Under constructionpast its filed completion date | May 2019 | 16 |
| Universal Classic 2BRERAP00073-5/557/R-462/2019 | Universal Green Infra Ltd | Patna | Apartments | Registered | Sep 2023 | 70 |
| Universal GardenBRERAP00073-1/45/R-42/2018 | Universal Green Infra Ltd | Patna | Apartments | Under constructionpast its filed completion date | Dec 2022 | 40 |
| UNIVERSAL PALACEBRERAP92324-1/963/R-673/2019 | Brajendra Kumar Builders Private Limited | Patna | Apartments | Registered | Apr 2024 | 22 |
| UNIVERSAL TOWERBRERAP000462-1/343/R-940/2020 | Universal Infra Homes | Patna | Mixed | Under constructionpast its filed completion date | Dec 2018 | 22 |
| UR RAVI KARAN COMPLEXBRERAP15818-7/170/R-1297/2022 | Soumyvinayak Construction Pvt.Ltd | Patna | Apartments | Registered | Nov 2024 | 35 |
| URBANE COURTBRERAP00243-11/739/R-482/2019 | Apna Awas Construction Pvt.Ltd. | Patna | Apartments | Completed | Dec 2019 | 24 |
| URMILA ARCADEBRERAP00216-1/79A/R-99/2018 | PROP. Alok Agrawal, MITTAL INFRASTRUCTURES | Bhagalpur | Mixed | Completed | Jan 2019 | 13 |
| URMILA REGENCYBRERAP00457-1/548/R-354/2019 | Gurudev Infrahomes Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Jun 2019 | 12 |
| US TowerBRERAP00325-4/1196/R-1010/2020 | Makan Developers (I) Pvt. Ltd. | Muzaffarpur | Mixed | Registered | Jan 2023 | 38 |
| USHA VILLABRERAP33626-1/1025/R-789/2019 | Lokankara Infrastructure Developers Private Limited | Patna | Apartments | Registered | Aug 2024 | 27 |
| UTTAM CITYBRERAP00856-1/570/R-430/2019 | Dharmendra Shasi Construction Company Private Limited | Patna | Apartments | Registered | May 2023 | 88 |
| Vaishnavi EnclaveBRERAP00036-1/61/R-37/2018 | Ashirwad Engicon Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Oct 2019 | 174 |
| Vaishnavi EnclaveBRERAP00323-2/319/R-289/2018 | Shristi Homes Pvt Ltd | Darbhanga | Apartments | Completed | May 2022 | 71 |
| Vamika ResidencyBRERAP00199-3/1060/R-798/2019 | Vamika Homes Pvt.Ltd | Patna | Apartments | Completed | Jun 2022 | 32 |
| Vastu Kiran Phase 1BRERAP80549-2/1208/R-1181/2021 | Nitish Kumar | Lakhisarai | Apartments | Registered | Feb 2022 | 27 |
| VASTU VIHAR AIIMS -1 PROJECT-6BRERAP00015-10/236/R-330/2019 | Technoculture Building Centre Private Limited | Patna | Mixed | Completed | Jun 2020 | 6 |
| VASTU VIHAR ARAH PHASE-01, EXTENSION-01BRERAP00015-15/365/R-615/2019 | Technoculture Building Centre Private Limited | Bhojpur | Apartments | Completed | Oct 2021 | 254 |
| VASTU VIHAR ASHOPUR PROJECT-04BRERAP00015-11/238/R-637/2019 | Technoculture Building Centre Private Limited | Patna | Mixed | Under constructionpast its filed completion date | Sep 2020 | 34 |
| VASTU VIHAR AURANGABAD PH-03BRERAP00015-60/958/R-867/2019 | Technoculture Building Centre Private Limited | Aurangabad | Apartments | Registered | Apr 2024 | 46 |
| VASTU VIHAR AURANGABAD PHASE 01 EXTENSION 01BRERAP00015-51/838/R-776/2019 | Technoculture Building Centre Private Limited | Aurangabad | Mixed | Completed | Apr 2021 | 15 |
| VASTU VIHAR BEGUSARAI PH 01 EXTENSION 01BRERAP00015-46/841/R-918/2020 | Technoculture Building Centre Private Limited | Begusarai | Apartments | Registered | Dec 2024 | 24 |
| VASTU VIHAR BEGUSARAI PH 02BRERAP00015-45/845/R-613/2019 | Technoculture Building Centre Private Limited | Begusarai | Apartments | Under constructionpast its filed completion date | Sep 2021 | 58 |
| VASTU VIHAR BETTIAH PHASE 01 NANO.RERAP2311201700015-27 | Technoculture Building Centre Private Limited | West Champaran | Apartments | Completed | Apr 2021 | 44 |
| VASTU VIHAR BHAGALPUR PHASE 01 EXTENSION 01BRERAP00015-37/884/R-903/2020 | Technoculture Building Centre Private Limited | Bhagalpur | Apartments | Completed | Dec 2025 | 18 |
| VASTU VIHAR CHHAPRA PHASE 01 EXTENSION 01BRERAP00015-34/788/R-527/2019 | Technoculture Building Centre Private Limited | Saran | Mixed | Completed | Apr 2021 | 65 |
| VASTU VIHAR COMMERCIAL COMPLEX CHHAPRA PHASE-02BRERAP00015-36/805/R-1150/2021 | Technoculture Building Centre Private Limited | Saran | Commercial | Registered | Nov 2021 | 50 |
| VASTU VIHAR DARBHANGA PH-03 EXT-01BRERAP00015-58/857/R-907/2020 | Technoculture Building Centre Private Limited | Darbhanga | Apartments | Completed | Apr 2021 | 25 |
| VASTU VIHAR DARBHANGA PHASE 01 EXTENSION 01BRERAP00015-22/763/R-636/2019 | Technoculture Building Centre Private Limited | Darbhanga | Apartments | Completed | Mar 2021 | 28 |
| VASTU VIHAR DEHRI PH 01 EXTENSION 01BRERAP00015-52/837/R-786/2019 | Technoculture Building Centre Private Limited | Rohtas | Mixed | Completed | Apr 2021 | 72 |
| VASTU VIHAR DEHRI-ON-SONE PH-02 EXT-03BRERAP00015-78/164/R-1351/2022 | Technoculture Building Centre Private Limited | Rohtas | Apartments | Registered | Sep 2024 | 36 |
| VASTU VIHAR GAYA PHASE-03 EXTENSION -2BRERAP00015-19/340/R-494/2019 | Technoculture Building Centre Private Limited | Gaya | Apartments | Completed | Dec 2019 | 120 |
| VASTU VIHAR GAYA PHASE-03 EXTENSION-1BRERAP00015-18/342/R-490/2019 | Technoculture Building Centre Private Limited | Gaya | Mixed | Completed | Aug 2022 | 149 |
| VASTU VIHAR GAYA PHASE-05BRERAP00015-20/338/R-318/2018 | Technoculture Building Centre Private Limited | Gaya | Apartments | Completed | Oct 2022 | 246 |
| VASTU VIHAR GAYA PHASE-6BRERAP00015-21/337/R-656/2019 | Technoculture Building Centre Private Limited | Gaya | Apartments | Under constructionpast its filed completion date | May 2022 | 113 |
| VASTU VIHAR HAJIPUR PHASE 02 EXTENSION 01BRERAP00015-55/858/R-829/2019 | Technoculture Building Centre Private Limited | Vaishali | Apartments | Completed | Apr 2021 | 13 |
| VASTU VIHAR HAJIPUR PHASE-06BRERAP00015-61/993/R-1148/2021 | Technoculture Building Centre Private Limited | Vaishali | Apartments | Registered | Jan 2024 | 25 |
| VASTU VIHAR JEHANABAD PH 01BRERAP00015-24/762/R-635/2019 | Technoculture Building Centre Private Limited | Jehanabad | Apartments | Completed | Mar 2021 | 115 |
| VASTU VIHAR KATIHAR PH-01EXT-03BRERAP00015-74/1202/R-1012/2020 | Technoculture Building Centre Private Limited | Katihar | Apartments | Completed | Jan 2025 | 34 |
| VASTU VIHAR KATIHAR PHASE 01 EXT02BRERAP00015-32/791/R-518/2019 | Technoculture Building Centre Private Limited | Katihar | Mixed | Completed | Apr 2021 | 69 |
| VASTU VIHAR MADHUBANI PHASE 01 EXT 01BRERAP00015-33/792/R-544/2019 | Technoculture Building Centre Private Limited | – | Apartments | Completed | Apr 2021 | 56 |
| VASTU VIHAR MOBARAKPUR PATNA PROJECT 03BRERAP00015-8/239/R-804/2019 | Technoculture Building Centre Private Limited | Patna | Mixed | Completed | Feb 2019 | 249 |
| VASTU VIHAR MOTIHARI PHASE 02 EXTENSION 1BRERAP00015-28/828/R-638/2019 | Technoculture Building Centre Private Limited | East Champaran | Apartments | Completed | Apr 2021 | 64 |
| VASTU VIHAR MUNGER PHASE 01 EXTENSION 01BRERAP00015-39/839/R-541/2019 | Technoculture Building Centre Private Limited | Munger | Apartments | Completed | Apr 2021 | 36 |
| VASTU VIHAR MUZAFFARPUR PH-02 EXT-01BRERAP00015-64/1053/R-990/2020 | Technoculture Building Centre Private Limited | Muzaffarpur | Apartments | Registered | Aug 2025 | 11 |
| VASTU VIHAR MUZAFFARPUR PH-02 EXT-02BRERAP00015-69/1150/R-943/2020 | Technoculture Building Centre Private Limited | Muzaffarpur | Apartments | Registered | Nov 2024 | 28 |
| VASTU VIHAR MUZAFFARPUR PHASE-02BRERAP00015-16/363/R-474/2019 | Technoculture Building Centre Private Limited | Muzaffarpur | Apartments | Completed | Oct 2021 | 326 |
| VASTU VIHAR MUZAFFARPUR-01-EXTENSION-1BRERAP00015-3/366/R-724/2019 | Technoculture Building Centre Private Limited | Muzaffarpur | Apartments | Completed | May 2021 | 70 |
| VASTU VIHAR PATNA PROJECT-08BRERAP00015-12/368/R-866/2019 | Technoculture Building Centre Private Limited | Patna | Apartments | Completed | Oct 2021 | 81 |
| VASTU VIHAR PURNIYA PHASE 02 EXTENSION 1BRERAP000015-67/1088/R-968/2020 | Technoculture Building Centre Private Limited | Purnea | Apartments | Registered | Aug 2025 | 45 |
| VASTU VIHAR SAHARSA PH-02BRERAP00015-79/123/R-1260/2022 | Technoculture Building Centre Private Limited | Saharasa | Apartments | Registered | Jun 2024 | 48 |
| VASTU VIHAR SAHARSA PHASE 01BRERAP00015-13/374/R-609/2019 | Technoculture Building Centre Private Limited | Saharasa | Mixed | Completed | Aug 2020 | 413 |
| vastu vihar Samastipur phase 01 extension 01BRERAP00015-49/844/R-1146/2021 | Technoculture Building Centre Private Limited | Samastipur | Apartments | Completed | Apr 2021 | 58 |
| VASTU VIHAR SASARAM PH 04BRERAP000015-54/861/R-963/2020 | Technoculture Building Centre Private Limited | Rohtas | Apartments | Under constructionpast its filed completion date | May 2022 | 16 |
| VASTU VIHAR SASARAM PH-03 EXT-01BRERAP00015-59/859/R-1015/2020 | Technoculture Building Centre Private Limited | Rohtas | Apartments | Completed | Jul 2021 | 61 |
| VASTU VIHAR SASARAM PHASE 02 EXTENSION 01BRERAP00015-53/862/R-899/2020 | Technoculture Building Centre Private Limited | Rohtas | Apartments | Completed | Apr 2021 | 27 |
| VASTU VIHAR SITAMARHI PHASE 01 EXTENSION 02BRERAP00015-30/803/R-534/2019 | Technoculture Building Centre Private Limited | Sitamarhi | Apartments | Completed | Mar 2021 | 32 |
| VASTU VIHAR SIWAN PHASE 01BRERAP00015-50/840/R-539/2019 | Technoculture Building Centre Private Limited | Siwan | Apartments | Completed | Apr 2021 | 69 |
| VASTU VIHAR,PHASE-02, PURNEABRERAP00015-1/05/R-106/2018 | Technoculture Building Centre Private Limited | Purnea | Apartments | Completed | Nov 2022 | 15 |
| VEENA SHYAM APARTMENTBRERAP01032-1/700/R-570/2019 | Sumanglam Construction | Patna | Apartments | Completed | May 2018 | 10 |
| VICTORIA PALACEBRERAP00079-1/615/R-398/2019 | Deepshree Properties Private Limited | Patna | Apartments | Completed | Nov 2022 | 100 |
| VIDHYARTHI SKYPERBRERAP00155-1/139/R-30/2018 | Yogendra Prasad Vidhyarthi | – | Mixed | Completed | Feb 2020 | 46 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region