As of 18 Nov 2026
New projects in Bihar, page 3
India
2,056 projects are registered with the real estate regulator in Bihar. 1,854 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
230 of the 1,854 are still filed as under construction, and 223 are already past the completion date their promoter filed. 275 have at least one complaint or court case filed against them.
Projects 201 to 300 of 1,854
| SAI SIGNATURE SQUAREBRERAP00194-3/559/R-320/2018 | Sai Vikash Developers | Patna | Apartments | Completed | Sep 2021 | 56 |
| SANCHAR NAGARBRERAP00060-2/274/R-464/2019 | R.R. Builders And Developers | Patna | Mixed | Completed | Jul 2021 | 852 |
| SARDA MANSIONBRERAP00469-1/561/R-487/2019 | Raman And Kumar Construction Limited | – | Apartments | Registered | Dec 2023 | 9 |
| SARITA KUNJ PHASE 1BRERAP00273-3/352/R-575/2019 | Ghar Lakshmi Buildcon Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Oct 2019 | 28 |
| SARITA KUNJ PHASE 2BRERAP00273-2/353/R-504/2019 | Ghar Lakshmi Buildcon Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Oct 2019 | 45 |
| SARITA KUNJ SMART CITYBRERAP00273-5/382/R-1058/2020 | Ghar Lakshmi Buildcon Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Dec 2025 | 80 |
| SARVAYONI CITYBRERAP00263-2/350/R-587/2019 | Shree Lok Nath Baba Homes Pvt Ltd | Patna | Apartments | Registered | Dec 2021 | 90 |
| SAUR VATIKABRERAP00321-1/215/R-347/2019 | Magadh Developers | Nalanda | Apartments | Completed | Apr 2021 | 180 |
| sehra towerBRERAP00343-1/871/R-832/2019 | Sehra Real Estate Developrs Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Dec 2019 | 32 |
| SHAIL VILLABRERAP00103-1/479/R-168/2018 | Mandvi Buildcon Pvt.Ltd | Patna | Apartments | Completed | Jan 2022 | 19 |
| SHANTI EXSOTICABRERAP42609-1/1015/R-741/2019 | Orange Estate Pvt Ltd | Patna | Apartments | Completed | Dec 2022 | 48 |
| SHANTI HERITAGEBRERAP00416-1/283/R-246/2018 | Sai Ganapati Heritage Pvt Ltd | Patna | Mixed | Registered | Apr 2021 | 8 |
| Shashwat MansionBRERAP00510-1/464/R-145/2018 | Geetraj Construction Pvt. Ltd. | Patna | Apartments | Completed | Mar 2021 | 13 |
| SHIBLI ENCLAVEBRERAP40848-1/1082/R-927/2020 | Azam Construction And Developers Private Limited | Patna | Mixed | Under constructionpast its filed completion date | Dec 2021 | 30 |
| SHILPI COMPLEXBRERAP20240-1/1005/R-820/2019 | Om City Homes Pvt.Ltd | Patna | Apartments | Under constructionpast its filed completion date | May 2019 | 12 |
| SHIV BHAJJU VIHARBRERAP00134-4/610/R-495/2019 | Star india construction private ltd | Patna | Apartments | Under constructionpast its filed completion date | Dec 2019 | 60 |
| SHIV COMPLEXBRERAP03944-2/1085/R-885/2020 | Hamz Homes Constructions Developer | Patna | Apartments | Registered | Feb 2023 | 12 |
| SHIV JANKIBRERAP00033-2/48/R-169/2018 | Samrat Vijay Construction Pvt. Ltd. | Muzaffarpur | Commercial | Under constructionpast its filed completion date | Mar 2020 | 24 |
| SHIV KAMLESH APARTMENTBRERAP00044-1/163/R-134/2018 | Kumar Construction | Patna | Apartments | Completed | Feb 2020 | 82 |
| Shri Brij Balaji TownshipBRERAP00871-2/620/R-425/2019 | Raj Construction | Patna | Apartments | Registered | Apr 2022 | 80 |
| SHUBH S SHIV VATIKABRERAP00431-5/1210/R-1104/2021 | Sai Shrinkhala Developers Private Limited | – | Apartments | Registered | Oct 2023 | 16 |
| Shukdeo EnclaveBRERAP00075-3/1072/R-882/2020 | Shri Balajee Nest Builder Private Limited | Patna | Mixed | Registered | Jul 2024 | 23 |
| SIDHESHWAR PALACEBRERAP73156-1/1144/R-1053/2020 | Balaji Nexgen Homes Private Limited | Bhojpur | Mixed | Under constructionpast its filed completion date | Apr 2017 | 49 |
| SIGNATURE TOWERBRERAP30652-7/235/R-1532/2023 | Rajnirmal Homes Private Limited | Patna | Apartments | Registered | Feb 2025 | 57 |
| Silver CoastBRERAP00130-1/324/R-286/2018 | Sarvodaya Grih Nirman Pvt. Ltd. | Patna | Apartments | Under constructionpast its filed completion date | Mar 2020 | 182 |
| SKILL TOWERBRERAP00551-3/533/R-699/2019 | Arunendra Developers Private Limited | Patna | Apartments | Registered | Feb 2022 | 48 |
| SNEH CHHAVI VATIKABRERAP00307-1/220/R-133/2018 | Sneh Chhavi Vatika | Patna | Apartments | Under constructionpast its filed completion date | Dec 2018 | 16 |
| SOHO BADRINARAYANBRERAP00602-1/588/R-378/2019 | Soho Infrastructure Pvt Ltd | Patna | Apartments | Under constructionpast its filed completion date | Dec 2020 | 20 |
| SOHO NIRMALABRERAP00602-2/590/R-349/2019 | Soho Infrastructure Pvt Ltd | Patna | Apartments | Under constructionpast its filed completion date | Dec 2020 | 70 |
| SONA SANAT APPARTMENTBRERAP01041-1/725/R-592/2019 | Nameta Kumari | Patna | Apartments | Under constructionpast its filed completion date | Apr 2019 | 16 |
| SUBH LAXMI COMPLEXBRERAP31139-2/1080/R-1220/2021 | Subhagami Realestate Pvt Ltd | Patna | Apartments | Registered | Apr 2023 | 44 |
| SUDHA HOME TOWNBRERAP00212-1/180/R-191/2018 | Geetanjali Real Tech Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Oct 2021 | 163 |
| SUMITRA HEIGHTSBRERAP14524-1/1049/R-784/2019 | Baidhanath Constructions Pvt. Ltd. | Patna | Mixed | Registered | May 2023 | 30 |
| SUMITRA MITTAL ENCLAVEBRERAP00663-1/485/R-533/2019 | Mittal Tech Llp | – | Apartments | Completed | Mar 2021 | 14 |
| SUNAINA TOWERBRERAP44704-3/170/R-1474/2022 | Maa Shakti Infracon Pvt Ltd | Patna | Mixed | Registered | Dec 2024 | 10 |
| SUNIT AMBROSIABRERAP20442-1/970/R-758/2019 | Sunit Housing Private Limited | Patna | Apartments | Registered | Apr 2023 | 90 |
| SUNRISE SAI OZONE PLAZABRERAP00029-2/147/R-39/2018 | Sunrise Sai Developers Pvt. Ltd. | Patna | Mixed | Completed | Dec 2020 | 121 |
| SUSHANT LAKE VIEW APARTMENTBRERAP45757-1/921/R-665/2019 | Nanak Constructions | Darbhanga | Apartments | Completed | Sep 2022 | 25 |
| SUSHEELA ENCLAVEBRERAP00063-2/44/R-15/2018 | Patliputra Engineers Private Limited | Patna | Apartments | Registered | Dec 2020 | 33 |
| TEJASWIS SHREE MAHESHWAR COMPLEXBRERAP20432-6/1101/R-1022/2020 | Tejaswi Infraatech Private Limited | Darbhanga | Mixed | Registered | Aug 2022 | 94 |
| The Residency-City Centre PatnaBRERAP05734-1/994/R-766/2019 | Utkarsh Sfatik Limited | Patna | Apartments | Completed | Mar 2022 | 127 |
| TIRUVANT PURAM CITY VIDHUT NAGARBRERAP00417-3/458/R-293/2018 | Nesh India Infrastructure Pvt Ltd | Patna | Apartments | Under constructionpast its filed completion date | Dec 2021 | 3,000 |
| TIRUVANTPURAM CITY A.G.BRERAP00417-5/460/R-371/2019 | Nesh India Infrastructure Pvt Ltd | Patna | Apartments | Under constructionpast its filed completion date | Dec 2020 | 478 |
| TULSI BIHARBRERAP00613-4/481/R-384/2019 | Raj Construction | Patna | Apartments | Registered | Nov 2020 | 12 |
| Universal Royal ResidencyBRERAP00073-9/36/R-87/2018 | Universal Green Infra Ltd | Patna | Apartments | Under constructionpast its filed completion date | Dec 2022 | 180 |
| Universal UltimaBRERAP00073-6/690/R-921/2020 | Universal Green Infra Ltd | Patna | Apartments | Registered | Dec 2022 | 52 |
| URBAN PLAZABRERAP00251-1/250/R-323/2018 | Azalfa Building Construction Pvt Ltd | Patna | Commercial | Completed | Dec 2018 | 106 |
| URMILA VATIKABRERAP00165-10/536/R-365/2019 | Grihvatika Homes Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Jun 2021 | 55 |
| usha bhartiBRERAP00597-1/541/R-432/2019 | Bharti Projects Media And Infratech | Muzaffarpur | Mixed | Under constructionpast its filed completion date | Sep 2020 | 48 |
| UTTAM VEENA RESIDENCYBRERAP52459-1/101/R-1344/2022 | Uttam Construction And Developers | Patna | Apartments | Registered | May 2025 | 12 |
| Vaishali ParkBRERAP00325-1/218/R-805/2019 | Makan Developers (I) Pvt. Ltd. | Vaishali | Apartments | Under constructionpast its filed completion date | Apr 2022 | 261 |
| VASTU VIHAR AIIMS PROJECT-7BRERAP00015-9/237/R-641/2019 | Technoculture Building Centre Private Limited | Patna | Mixed | Completed | Oct 2020 | 374 |
| VASTU VIHAR ARAH PHASE 02BRERAP00015-2/364/R-711/2019 | Technoculture Building Centre Private Limited | Bhojpur | Apartments | Completed | Oct 2024 | 122 |
| VASTU VIHAR GAYA PHASE-04BRERAP00015-17/339/R-600/2019 | Technoculture Building Centre Private Limited | Gaya | Mixed | Completed | Mar 2021 | 128 |
| VASTU VIHAR HAJIPUR PHASE 01 EXTENSION 01BRERAP00015-48/843/R-612/2019 | Technoculture Building Centre Private Limited | Vaishali | Apartments | Under constructionpast its filed completion date | Apr 2021 | 33 |
| VENUS EMPIREBRERAP00014-2/1273/R-1035/2020 | Venus Star Construction Pvt. Ltd. | Patna | Apartments | Registered | Dec 2024 | 358 |
| VENUS PARADISEBRERAP00014-1/04/R-1/18 | Venus Star Construction Pvt. Ltd. | Patna | Apartments | Completed | Dec 2021 | 220 |
| VIJAY ENCLAVEBRERAP00351-2/675/R-607/2019 | Urmila Homes Jv | Muzaffarpur | Apartments | Completed | Dec 2020 | 30 |
| VIP RESIDENCYBRERAP00165-6/253/R-81/2018 | Grihvatika Homes Private Limited | Patna | Apartments | Under constructionpast its filed completion date | Oct 2021 | 77 |
| YAMUNA VIHARBRERAP00798-1/554/R-742/2019 | Shalimar Milestone Estates Pvt Ltd | Patna | Apartments | Under constructionpast its filed completion date | Dec 2019 | 64 |
| 3D APARTMENTBRERAP187328070625271029E00 | Vantage And Psvs Jv | Patna | Apartments | Registered | Oct 2029 | 12 |
| A M PINNACLEBRERAP00427-9/155/R-1663/2024 | R.D.Eco Developers Pvt. Ltd. | – | Apartments | Registered | Oct 2025 | 286 |
| Aadhvik Ashok EnclaveBRERAP54235-1/17/R-1304/2022 | Aadhvik Developers | Patna | Apartments | Registered | Jun 2025 | 23 |
| AAKRITI'S THE NESTBRERAP00358-2/372/R-149/2018 | Aakriti Buildcon Pvt Ltd | Patna | Apartments | Registered | Jul 2023 | 154 |
| Aaniket Urmila ComplexBRERAP190728040925150430E00 | Sai Aaniket Infra LLP | Patna | Mixed | Registered | Apr 2030 | 24 |
| AAROHI CITYBRERAP00312-3/129/R-1776/2024 | Aarohi Homes Private Limited | Patna | Mixed | Registered | Mar 2028 | 287 |
| AARTI KUNJBRERAP92310-1/221/R-1515/2023 | Nandish Developers And Construction Private Limited | Gaya | Apartments | Registered | Sep 2027 | 16 |
| Abdul Majeed TowerBRERAP190122060825100827E00 | Highway & Hydel Projects Private Limited | Bhagalpur | Mixed | Registered | Aug 2027 | 32 |
| Adi Krishna ResidencyBRERAP00291-4/91/R-1403/2022 | StructoArch Consultants Pvt. Ltd. | Patna | Apartments | Registered | Dec 2026 | 32 |
| ADITYA MEENA ENCLAVEBRERAP51645-1/99/R-1234/2021 | Shrestha Aditya Constructions | Patna | Apartments | Registered | Nov 2024 | 15 |
| ADPS PALACEBRERAP00356-9/217/R-1513/2023 | Vastu vastaya builder pvt ltd | Gaya | Apartments | Registered | Dec 2026 | 20 |
| AJAY CITYBRERAP182728070325110828E00 | Sai Sampann Infra LLP | Patna | Apartments | Registered | Aug 2028 | 170 |
| ALPANA BUSINESS PARKBRERAP185128040525030929E00 | Magadh Developers | Patna | Commercial | Registered | Sep 2029 | 1 |
| ALPHA PARKBRERAP93651-2/50/R/1383/2022 | Aditya Buildmax Private Limited | Muzaffarpur | Mixed | Registered | Feb 2027 | 55 |
| AMAN SKS HEIGHTSBRERAP198428070526311232E00 | Nandani And Tbipl Infra Pvt Ltd | Patna | Apartments | Registered | Dec 2032 | 65 |
| ANAMIKA RESIDENCYBRERAP24925-2/22/R-1803/2025 | Dwarka Dwellings Private Limited | Patna | Apartments | Registered | Aug 2029 | 9 |
| ANANT ENCLAVEBRERAP190322040925280829E00 | Swarn Shilpi Buildtech Private Limited | Bhagalpur | Apartments | Registered | Aug 2029 | 19 |
| ANGAN HERITAGEBRERAP61923-1/196/R-1498/2022 | Rakesh Ranjan | Patna | Apartments | Registered | May 2027 | 72 |
| ANJU SUMITRA TOWERBRERAP183028070425120929E00 | Vanasthali Home Llp | Patna | Mixed | Registered | Sep 2029 | 31 |
| ANSHU AKANSHA BUDHA ENCLAVEBRERAP195335060226300831E00 | Budha Construction Vn Private Limited | Gaya | Apartments | Registered | Aug 2031 | 36 |
| APEX TWIN TOWERBRERAP00985-1/773/R-459/2019 | Mohini Constructions | Patna | Apartments | Registered | Nov 2021 | 104 |
| APOGEE TOWERBRERAP25722-1/153/R-1764/2024 | Apogee Property India Private Limited | Patna | Apartments | Registered | Dec 2028 | 16 |
| APRAJITA COMPLEXBRERAP21802-1/39/R-1567/2023 | Satish Kumar Pathak | – | Apartments | Registered | Mar 2027 | 32 |
| ARA CITY CENTERBRERAP182529010325171029E00 | Akash Deep | Bhojpur | Mixed | Registered | Oct 2029 | 36 |
| ARADHYA CITYBRERAP94350-2/04/R-1528/2023 | Ayuradhya Construction Private Limited | Gaya | Mixed | Registered | Sep 2028 | 339 |
| ARANYA PNB RESIDENCYBRERAP00066-1/88/R-60/2018 | Aranya Engicon Pvt Ltd | Patna | Apartments | Registered | Feb 2021 | 136 |
| ARANYA YAMUNA RESIDENCYBRERAP00066-2/148/R-1295/2022 | Aranya Engicon Pvt Ltd | Patna | Apartments | Registered | Apr 2024 | 28 |
| ARCON ARUN ASHOK MANSIONBRERAP30301-2/107/R-1435/2022 | Arcon Project Private Limited | Patna | Mixed | Registered | Jan 2026 | 12 |
| ARJUN ENCLAVEBRERAP192122061025230830E00 | Shree Khatu Shyam Developer | Bhagalpur | Apartments | Registered | Aug 2030 | 13 |
| ARTI RESIDENCYBRERAP00323-3/186/R-1299/2022 | Shristi Homes Pvt Ltd | Muzaffarpur | Apartments | Registered | Jan 2025 | 13 |
| ASHA KIRAN ENCAVE BLOCK-2BRERAP192328071025040430E00 | Devasha Homes Private Limited | Patna | Apartments | Registered | Apr 2030 | 8 |
| ASHA VIHAR PHASE-IVBRERAP00055-6/165/R-1472/2022 | Asha Realty Developers Private Limited | Muzaffarpur | Apartments | Registered | May 2027 | 67 |
| Ashiana Green City Phase- 2BRERAP00237-2/122/R-1253/2021 | Ashiana Creators Pvt Ltd | Patna | Apartments | Registered | Sep 2026 | 352 |
| Ashirwad IOB Galaxy Phase IIBRERAP193828091225070945E00 | Ashirwad Engicon Private Limited | Patna | Mixed | Registered | Sep 2045 | 856 |
| Ashirwad Rose ValleyBRERAP00036-7/671/R-1203/2021 | Ashirwad Engicon Private Limited | Patna | Mixed | Registered | Dec 2021 | 472 |
| ASHOKA ENCLAVEBRERAP35029-1/201/R-1508/2022 | Jay Shree Shyam Homes | Patna | Mixed | Registered | Oct 2027 | 24 |
| ASTARA URBANABRERAP195628040226060329E00 | Previous Names : DREAM HOUSING PROJECTS PVT. LTD New Name: ASTARA PROJECTS PRIVATE LIMITED | Patna | Apartments | Registered | Mar 2029 | 12 |
| Asthanu Basu ArcadeBRERAP186328070625100230E00 | Asthanu Buildcon | Patna | Mixed | Registered | Feb 2030 | 50 |
| AVIGNABRERAP00263-3/1008/R-842/2019 | Shree Lok Nath Baba Homes Pvt Ltd | Patna | Apartments | Registered | Jun 2023 | 35 |
| B M APARTMENTBRERAP45037-4/92/R-1195/2021 | Daksha Construction Private Limited | – | Apartments | Registered | Aug 2023 | 32 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region