New projects in Delhi NCR, page 5
India
3,506 projects are registered with the real estate regulator in Delhi NCR, Delhi. 3,252 of them have enough filed detail for a full report here: who is building it, when it is due, and any court cases or complaints filed against it.
70 of the 3,252 are still filed as under construction, and 47 are already past the completion date their promoter filed. 2,018 have at least one complaint or court case filed against them.
Projects 401 to 500 of 3,252
| INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92GGM/443/175/2021/11 DATED 15.03.2021 | Dlf Utilities Limited | GurugramSector 91 / 92 | Other | Registered | Jun 2024 | 72 |
| INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92GGM/445/177/2021/13 DATED 22.03.2021 | Dlf Builders & Developers Private Limited | GurugramSector 91 / 92 | Other | Registered | Jun 2025 | 72 |
| INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92GGM/446/178/2021/14 DATED 22.03.2021 | Dlf Home Developerslimited | GurugramSector 91 / 92 | Other | Registered | Jun 2025 | 64 |
| INDIA RASHTRAGGM/631/363/2022/106 DATED 21.11.2022 | Next Generation Projects Pvt Ltd | GurugramSector 88a | Other | Registered | Nov 2026 | 78 |
| INDIA WORLDMARTGGM/960/692/2025/63 DATED 26.06.2025 | Betterchoice Realtors Private Limited | GurugramSector- 88a | Other | Registered | Sep 2029 | 57 |
| INDIABULLS ONE 09, PHASE-1333 OF 2017 DATED 24.10.2017 | Citra Properties Limited | GurugramSector 109 | Other | Registered | May 2023 | 137 |
| INDIABULLS ONE09298 OF 2017 DATED 13.10.2017 | Citra Properties Limited | GurugramSector 109 | Other | Registered | May 2024 | 384 |
| INDRAPRASTHA GREENSHRERA-PKL-FBD-200-2020 | Swatantra Land And Finance Private Limited | FaridabadSector 97 | Other | Registered | Mar 2023 | 109 |
| INFINITYGGM/436/168/2021/04 DATED 18.01.2021 | Pyramid Dream Homes Llp | GurugramSector-70 | Other | Lapsed | Sep 2025 | 684 |
| INSPIRE327 OF 2017 DATED 23.10.2017 | Brahma City Pvt Ltd | GurugramSector 60 | Other | Lapsed | Mar 2022 | 278 |
| IREO SKYON367 OF 2017 DATED 24.11.2017 | Ireo Private Limited | GurugramSector 60 | Other | Lapsed | Nov 2018 | 4 |
| ISHAN SINGH ( COMMERCIAL)13 OF 2018 DATED 11.01.2018 | Spaze Towers Pvt. Ltd. | GurugramSector-78 | Other | Lapsed | Jun 2020 | 479 |
| IT COLONY ( COMMERCE PARK)58 OF 2017 DATED 17.08.2017 | Emaar Mgf Land Ltd | GurugramSector 61 | Other | Registered | Mar 2021 | 0 |
| IT COMMERICAL LAND143 OF 2017 DATED 28.08.2017 | Indra Technologies Private Limited | GurugramSector-58 | Other | Registered | Jan 2019 | 0 |
| JHAJJAR ONEHRERA-PKL-JJR-57-2018 | Suman Villas Pvt Ltd | JhajjarSector 8 | Other | Lapsed | Mar 2020 | 324 |
| JINDAL GLOBAL CITY (PHASE-V)HRERA-PKL-SNP-243-2021 | Jindal Realty Limited | SonipatSector 33-34-35 | Other | Lapsed | Mar 2024 | 246 |
| JMD EMPIRE ( TOWER A AND B)67 OF 2017 DATED 18.8.2017 | Jmd Limited | GurugramSector-67 | Other | Registered | Nov 2018 | 528 |
| JMD SUBURBIO-1GGM/555/287/2022/30 DATED 25.04.2022 | Jmd Limited | GurugramSector 67 | Other | Lapsed | Oct 2018 | 519 |
| JMD SUBURBIO-II312 OF 2017 DATED 17.10.2017 | Jmd Limited | GurugramSector-67 | Other | Lapsed | Jun 2020 | 337 |
| JMS GROUP CAPITAL SQUAREGGM/855/587/2024/82 DATED 02.08.2024 | Jms Infra Reality Pvt. Ltd. | GurugramSector 95 | Other | Registered | Mar 2028 | 236 |
| JONEJA RESIDENCYHRERA-PKL-PWL-281-2021 | Joneja Infraprojects Private Limited | PalwalSector-6 | Other | Registered | Feb 2023 | 92 |
| JOYVILLE GURUGRAM PHASE IIIGGM/335/67/2019/29 DATED 24.05.2019 | Joyville Shapoorji Housing Pvt. Ltd. | GurugramSector-102 | Other | Registered | Apr 2024 | 235 |
| JOYVILLE GURUGRAM PHASE IVGGM/336/68/2019/30 DATED 24.05.2019 | Joyville Shapoorji Housing Pvt. Ltd. | GurugramSector-102 | Other | Registered | Dec 2024 | 281 |
| JOYVILLE GURUGRAM PHASE VIGGM/434/166/2021/02 DATED 08.01.2021 | Joyville Shapoorji Housing Private Limited | GurugramSector 102 | Other | Registered | Jul 2025 | 439 |
| JOYVILLE GURUGRAM VGGM/345/77/2019/39 DATED 06.09.2019 | Joyville Shapoorji Housing Private Limited | GurugramSec 102 | Other | Registered | Dec 2024 | 92 |
| JOYVILLE GURUGRAM-IGGM/295/2018/27 DATED 29.11.2018 | Joyville Shapoorji Housing Pvt Ltd | GurugramSector-102 | Other | Registered | Jul 2022 | 235 |
| JOYVILLE GURUGRAM-IIGGM/296/2018/28 DATED 29.11.2018 | Joyville Shapoorji Housing Pvt Ltd | GurugramSector-102 | Other | Registered | Mar 2023 | 281 |
| KASHIGGM/977/709/2025/80 DATED 27.08.2025 | Jai Ganga Realtech Llp | GurugramSector 89 & 93 | Other | Registered | Jan 2027 | 70 |
| KLJ SQUARE ( COMMERCIAL PROJECT)234 OF 2017 DATED 19.09.2017 | Klj Realtech Private Limited | GurugramSector 83 | Other | Registered | Dec 2021 | 235 |
| KST WHISPERING HEIGHTSHRERA-PKL-FBD-141-2019 | Kst Infrastructure Ltd. | FaridabadSector-88 | Other | Registered | Dec 2022 | 605 |
| LA CENTRALGGM/432/164/2020/48 DATED 22.12.2020 | Divine Vision Infra Retail Pvt. Ltd. | GurugramSector 74a | Other | Lapsed | Dec 2022 | 30 |
| LA DIMORA CITYHRERA-PKL-FBD-196-2020 | Lightstone Developers India Private Limited | FaridabadSector 97 | Other | Lapsed | Feb 2025 | 128 |
| LA DIMORA CITY PHASE 2HRERA-PKL-FBD-240-2021 | Lightstone Developers India Pvt Ltd | FaridabadSector 97 | Other | Lapsed | Dec 2025 | 248 |
| LA VIDA148 OF 2017 DATED 28.08.2017 | Sector -113,gatevida Developers Pvt.Ltd. | GurugramSector-112/113 | Other | Registered | Dec 2022 | 397 |
| LA VIDA PHASE 2GGM/639/371/2022/114 DATED 28.11.2022 | Sector 113 Gatevida Developers Private Ltd | GurugramSector 112/113 | Other | Registered | Aug 2027 | 284 |
| LANDMARK AVANAGGM/695/427/2023/39 DATED 13.02.2023 | Landmark Apartments Private Limited | GurugramSector 95 | Other | Registered | Jan 2028 | 246 |
| LANDMARK AVANA - 1ST PHASEGGM/740/472/2023/84 DATED 24.07.2023 | Landmark Apartments Private Limited | GurugramSector 95 | Other | Registered | Jul 2027 | 114 |
| LANDMARK CYBERPARKGGM/367/99/2019/61 DATED- 25.11.2019 | Landmark Apartments Pvt. Ltd. | GurugramSector 67 | Other | Lapsed | Dec 2018 | 0 |
| LANDMARK THE HOMES 81GGM/468/200/2021/36 DATED 16.07.2021 | Srv Automotives Pvt. Ltd. | GurugramSector 81 | Other | Lapsed | Feb 2026 | 780 |
| LAXMI APARTMENTS25 OF 2017 DATED 27.07.2017 | Pareena Infrastructure Pvt. Ltd. | GurugramSector-99 | Other | Registered | Sep 2020 | 837 |
| LEVANTE RESIDENCESGGM/1000/732/2025/103 DATED 16.10.2025 | Sv Infra Management Solutions Pvt. Ltd. (Formerly Known As Sv Infra Management Solutions Llp) | GurugramSector 104 | Other | Registered | Mar 2032 | 493 |
| LID NIVASAGGM/1020/752/2025/123 DATED 10.12.2025 | Lion Infradevelopers Llp | GurugramSector-6 | Other | Registered | Sep 2030 | 160 |
| LIFESTYLE HOMES272 OF 2017 DATED 09.10.2017 | Vatika Limited | GurugramSector-83 | Other | Lapsed | Jan 2018 | 62 |
| LOTUS ELISEGGM/377/109/2019/71 DATED 25.11.2019 | Lotus Realtech Pvt. Ltd. | GurugramSector-99 | Other | Registered | Sep 2021 | 158 |
| LUMINARE PHASE 2(SOLARIS)42 OF 2017 DATED 26.10.2017 | Mahindra Homes Pvt Ltd & Ireo Pvt Ltd | GurugramSector 59 | Other | Registered | Mar 2021 | 120 |
| LUMINARE PHASE 3 (TOWER B)GGM/551/283/2022/26 DATED 15.03.2022 | Mahindra Homes Private Limited | GurugramSector 59 | Other | Registered | Aug 2026 | 140 |
| LUMINARE PHASE I(SIRIUS)47 OF 2017 DATED 26.10.2017 | Mahindra Homes Pvt Ltd & Ireo Pvt Ltd | GurugramSector 59 | Other | Registered | Jan 2019 | 120 |
| LUSHLANDSGGM/837/569/2024/64 DATED 14.06.2024 | Adani Infrastructure And Developers Private Limited | GurugramSector 02 | Other | Registered | Jun 2029 | 251 |
| LUXE RESIDENCY - 112GGM/705/437/2023/49 DATED 29.03.2023 | Rishali Developers Llp | GurugramSector 112 | Other | Registered | Nov 2027 | 130 |
| LUXURY VILLAGGM/428/160/2020/44 DATED 24.11.2020 | Luxury Infrastructure Pvt. Ltd. | GurugramSector 30 | Other | Lapsed | Mar 2021 | 5 |
| M2K OLIVE GREEN FLOORSGGM/920/652/2025/23 DATED 04.03.2025 | Sadan Realtechprivate Limited | GurugramSector - 104 | Other | Registered | Dec 2029 | 160 |
| M3M 113 MARKETGGM/365/97/2019/59 DATED- 15.10.2019 | Lekh Buildtech Private Limited | GurugramSector-113 | Other | Registered | Oct 2021 | 105 |
| M3M 114 MARKETGGM/585/317/2022/60 DATED 04.07.2022 | Golden Gate Propbuild Private Limited | GurugramSector -114 | Other | Registered | Aug 2024 | 73 |
| M3M 84 MARKETGGM/366/98/2019/60 DATED-15.10.2019 | M3m India Private Limited | GurugramSector-84 | Other | Registered | Oct 2021 | 103 |
| M3M ALTITUDEGGM/821/553/2024/48 DATED 29.04.2024 | Manglam Multiplex Private Limited | GurugramSector 65 | Other | Registered | Jul 2031 | 342 |
| M3M ANTALYA HILLS 3GGM/844/576/2024/71 DATED 01.07.2024 | Loon Land Development Limited | GurugramSector 79 & 79b | Other | Registered | Oct 2028 | 491 |
| M3M ANTALYA HILLS PHASE 1GGM/650/382/2022/125 DATED 23.12.2022 | Loon Land Development Limited | GurugramSector 79 | Other | Registered | Dec 2025 | 795 |
| M3M ANTALYA HILLS PHASE IIGGM/662/394/2023/06 DATED 12.01.2023 (SUPERSEDED BY GGM/833/565/2024/60 DATED 03.06.2024) | Loon Land Development Limited | GurugramSector 79 | Other | Registered | Jun 2026 | 2,068 |
| M3M ATRIUM57GGM/513/245/2021/81 DATED 29.11.2021 | Paryapt Infrastructure Private Limited | GurugramSector 57 | Other | Registered | May 2025 | 274 |
| M3M BROADWAYGGM/299/2018/31 DATED 14.12.2018 (SUPERSEDED BY GGM/700/432/2023/44 DATED 02.03.2023) | Roshni Builders Pvt. Ltd. | GurugramSector-71 | Other | Lapsed | Oct 2025 | 1,488 |
| M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT)GGM/700/432/2023/44 DATED 02.03.2023 | Roshni Builders Private Limited | GurugramSector 71 | Other | Registered | Apr 2024 | 2,364 |
| M3M CAPITALGGM/531/263/2022/06 DATED 02.02.2022 | Union Buildmart Private Limited | GurugramSector -113 | Other | Registered | Jun 2026 | 644 |
| M3M CAPITAL PHASE -2GGM/612/344/2022/87 DATED 28.09.2022 | Union Buildmart Private Limited | GurugramSector -113 | Other | Registered | Dec 2026 | 1,760 |
| M3M CAPITAL PHASE-3GGM/825/557/2024/52 DATED 16.05.2024 | Union Buildmart Private Limited | GurugramSector-113 | Other | Registered | Mar 2027 | 268 |
| M3M CROWN PHASE 1GGM/687/419/2023/31 DATED 02.02.2023 | Metro Education & Welfare Private Limited | GurugramSector-111 | Other | Registered | Jan 2028 | 1,332 |
| M3M FLORA68GGM/594/326/2022/69 DATED 18.07.2022 | Hans Propcon Pvt. Ltd., Glory Infracon Pvt. Ltd., Blossom Propbuild Pvt. Ltd. | GurugramSector -68 | Other | Registered | Jun 2026 | 114 |
| M3M GOLF HILLS PHASE 1GGM/704/436/2023/48 DATED 29.03.2023 | Loon Land Development Limited | GurugramSector 79/ 79b | Other | Registered | Feb 2031 | 1,309 |
| M3M GOLF HILLS PHASE 2GGM/809/541/2024/36 DATED 01.04.2024 | Loon Land Development Limited | GurugramSector-79 & 79b | Other | Registered | Apr 2032 | 590 |
| M3M INTERNATIONAL FINANCIAL CENTER INCLUDING PHASE I & IIGGM/564/296/2022/39 DATED 23.05.2022 | Gentle Realtors Private Limited | GurugramSector-66 | Other | Registered | Dec 2024 | 476 |
| M3M J and CUPRERAPRJ690055/10/2025 | Mayfairsky Estates Private Limited | Gautam Buddha NagarSector-97, Noida | Mixed | Registered | Jul 2030 | 1,561 |
| M3M LATITUDE ( TOWER R-01)56 OF 2017 DATED 17.8.2017 | Manglam Multiplex Private Limited | GurugramSector 65 | Other | Registered | Jan 2023 | 160 |
| M3M MANSIONGGM/802/534/2024/29 DATED 18.03.2024 | Union Buildmart Private Limited | GurugramSector 113 | Other | Registered | Feb 2032 | 968 |
| M3M MARINA/M3M SIERRA 68 ( GROUP HOUSING COLONY)57(A) OF 2017 DATED 17.8.2017 | Hans Propcon Pvt. Ltd. Glory Infracon Pvt. Ltd. Blossom Propbuild Pvt. Ltd. M3m India Pvt. Ltd. | GurugramSector-68 | Other | Registered | Jan 2022 | 1,076 |
| M3M PARAGON57GGM/651/383/2022/126 DATED 23.12.2022 | Paryapt Infrastructureprivate Limited | GurugramSector-57 | Other | Registered | Aug 2026 | 858 |
| M3M PRIVE 73GGM/333/65/2019/27 DATED 24.05.2019 | Lavish Buildmart Pvt. Ltd. | GurugramSector-73 | Other | Registered | Feb 2024 | 294 |
| M3M ROUTE65GGM/605/337/2022/80 DATED 31.08.2022 (SUPERSEDED BY GGM/803/535/2024/30 DATED 27.03.2024) | Manglam Multiplex Private Limited | GurugramSector-65 | Other | Registered | Feb 2027 | 727 |
| M3M ROUTE65GGM/803/535/2024/30 DATED 27.03.2024 | Manglam Multiplex Private Limited | GurugramSector-65 | Other | Registered | Feb 2027 | 808 |
| M3M SOULITUDEGGM/501/233/2021/69 DATED 25.10.2021 | Aawam Residency Private Limited | GurugramSector-89 | Other | Registered | Sep 2025 | 864 |
| M3M SOULITUDE 2GGM/859/591/2024/86 DATED 12.08.2024 | Aawam Residency Private Limited | GurugramSector-89 | Other | Registered | Apr 2027 | 658 |
| M3M TEE POINT349 OF 2017 DATED 09.11.2017 | Marconi Infratech Pvt. Ltd. M3m India Pvt. Ltd. | GurugramSector-65 | Other | Registered | Jul 2021 | 329 |
| M3M URBANAGGM/341/73/2019/35 DATED 18.06.2019 | M3m India Pvt. Ltd. & Martial Buildcom Pvt. Ltd. | GurugramSector-67 | Other | Registered | Dec 2021 | 416 |
| M3M URBANA BUSINESS PARK347 OF 2017 DATED 09.11.2017 | Martial Buildcon Pvt. Ltd. M3m India Pvt. Ltd. | GurugramSector-67 | Other | Registered | Nov 2021 | 1,231 |
| M3M URBANA PREMIUM348 OF 2017 DATED 09.11.2017 | Martial Buildcon Pvt. Ltd. M3m India Pvt. Ltd. | GurugramSector-67 | Other | Registered | Feb 2024 | 257 |
| M3M XPRESSWAY 114GGM/718/450/2023/62 DATED 15.05.2023 | Generous Realtors Private Limited | GurugramSector 114 | Other | Registered | Apr 2025 | 44 |
| MACEO63 OF 2017 DATED 18.8.2017 | Anant Raj Limited And Jubilant Software Services Pvt. Ltd. | GurugramSector 91 | Other | Registered | Aug 2020 | 788 |
| MAGNUM BUSINESS DISTRICTGGM/990/722/2025/93 DATED 16.10.2025 | Galaxy Magnum Projects Limited | GurugramSector-74 | Other | Registered | Apr 2031 | 168 |
| MAGNUM CITY CENTRE ( COMMERCIAL PROJECT)227 OF 2017 DATED 19.09.2017 | M/S Galaxy Magnum Infraheights Ltd. | GurugramSector-63a | Other | Lapsed | Dec 2022 | 106 |
| MAGNUM GLOBAL PARKGGM/293/2018/25 DATED 29.11.2018 | Glo Tech Enterprises Pvt Ltd | GurugramSector-58 | Other | Registered | Dec 2022 | 250 |
| MAGNUM TOWERS ( TOWER A & C)225 OF 2017 DATED 19.09.2017 | Galaxy Magnum Infraheights Ltd. | GurugramSector-58 | Other | Lapsed | Jan 2019 | 179 |
| Mahagun My Laagoon Phase 1UPRERAPRJ999197/09/2024 | Aura Infrabiz Llp | Gautam Buddha NagarSector 12, Greater Noida West | Apartments | Registered | Apr 2029 | 750 |
| MANOR ONEGGM/364/96/2019/58 DATED 24.09.2019 | Kashish Developers Limited | GurugramSec-111 | Other | Registered | Dec 2021 | 714 |
| MANSHA OAKSHRERA-PKL-FBD-248-2021 | Mansha Buildcon Pvt. Ltd. | FaridabadSector-98 | Other | Registered | Apr 2026 | 132 |
| MANSHA VEGA STREETHRERA-PKL-FBD-275-2021 | Mansha Buildcon Private Limited | FaridabadSector-82 | Other | Lapsed | May 2026 | 53 |
| MAPSKO GALLERIA (PROJECT AREA 1.82 ACRES COMMERCIAL, PART OF RESIDENTIAL PLOTTED COLONY)HRERA-PKL-SNP-72-2018 | Mapsko Builders Pvt Ltd | SonipatSector - 27 | Other | Registered | Jun 2019 | 562 |
| MAPSKO MOUNT VILLE328 OF 2017 DATED 23.10.2017 | Mapsko Builders Pvt Ltd | GurugramSector 78-79 | Other | Registered | Aug 2020 | 756 |
| MAPSKO MOUNT VILLE PHASE - IIGGM/689/421/2023/33 DATED 02.02.2023 | Mapsko Builders Pvt Ltd | GurugramSector 78 & 79 | Other | Registered | Dec 2027 | 56 |
| MARBELLA307 OF 2017 DATED 17.10.2017 | Emaar Mgf Land Ltd | GurugramSector 65 &66 | Other | Registered | Oct 2022 | 268 |
| MARBELLA PHASE 2GGM/440/172/2021/08 DATED 01.03.2021 | Emaar Mgf Land Ltd | GurugramSector 65& 66 | Other | Registered | Dec 2023 | 136 |
| MARKET CITYGGM/306/2018/38 DATED 27.12.2018 | Orris Infrastructure Private Limited | GurugramSector - 89 | Other | Registered | Jan 2023 | 816 |
| MARKET WALKGGM/422/154/2020/38 DATED 26.10.2020 | Vatika Limited | GurugramSector- 82a | Other | Lapsed | Aug 2022 | 59 |
Listed in order of how much each report can say, then by name. Status and completion dates are as each promoter filed them. Every region