Well constructed. Very nice villas. On the approach path of runway 09L at KIA
Overview
Ar Villas
Overview
Ar Villas
Overview
Ar Villas
Overview
Photo: SSP AR VILLASTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Deputy Commissioner · Survey 127/4
Approvals
| Building plan (BIAPPA) | Sanctioned 28 Dec 2022 · No. BIAAPA/TP/CC/191/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Villas · avg 241 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 28 Dec 2022 | |
| Escrow bank | HDFC · Sadahalli |
Data room
169 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Well constructed. Very nice villas. On the approach path of runway 09L at KIA
The best villa destination in Sadahalli Devanahalli. Near by Doddajala metro station. The AR Villas developed by SSP will give you europen feel inside the layout.
Very well planned snd designed. Quality if work is to be appreciated. Amenities are under construction.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ar Villas in the interactive atlas
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Panchayati Raj · Survey 127/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAPA/TP/CC/191/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/280324/006747
K-RERA registration
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: Village Map & Sketch, 2 pages, not in English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 26,186 sq m | |
| Extent the filed land schedule names for these survey numbers | 9,915 sq m | |
| Plot area against the filed extent | 2.64 times | |
| Land area filed with K-RERA | 9,903 sq m | |
| Village, hobli and taluk on the KGIS map | J.I.Sadhahalli, Kasaba hobli, Devanahalli taluk | |
| Sy. 127/4: filed extent, KGIS plot | 9,915 sq m, 26,186 sq m | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 127/4 | |
|---|---|---|
| Land extent, Sy 127/4 | 2 Acre 18 Gunta | |
| Whole survey numbers on the KGIS map | 26,186 sq m (the project holds a share) | |
| Land area of this registration | 9,903 sq m | |
| Khata | A Khatha · Panchayati Raj · 24 Nov 2022 | |
| Sale deed | 6 Jul 2022 | |
| Title deed | Executed 6 Jul 2022 · Consideration ₹4.20 Cr · Devanahalli taluk |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 127/4 | 1 | 2 acres 18 guntas | 2 acres 18 guntas | 6 acres 19 guntas | The map differs by 4 acres 1 gunta | 0 |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 27 Dec 2024 |
| Land conversion | Converted 7 Apr 2005 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 127/4 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Villas | Carpet per villa, average (sq ft) |
|---|---|---|
| Villas | 26 | 2,594 |
| Sattva Vasanta Skye | about 1 km | Locked | |
|---|---|---|---|
| Sattva Vasanta Cove | about 1 km | Locked | |
| Godrej MSR City | about 1.5 km | Locked | |
| Barca II At Godrej Msr City | about 1.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 2.5 km | Locked | |
| Varnam Phase 1c | about 2.5 km | Locked | |
| Sattva City | about 2.5 km | Locked | |
| Birla Trimaya Phase-3 | about 2.5 km | Locked | |
| Birla Trimaya Phase-2 | about 3 km | Locked | |
| Birla Trimaya | about 3 km | Locked | |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4 km | Locked | |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 4 km | Locked |
| Ar Villas This project | This project is the point the others are measured from | 27 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Sattva Vasanta Skye | about 1 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Sattva Vasanta Cove | about 1 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
| Godrej MSR City |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Agriculture, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 12.5 km, Kondappa layout | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 3 km to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (26 covered spaces for 26 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 17 Sep 2024 |
|---|
| Possession, agreement | 27 Dec 2024 | |
|---|---|---|
| Schedule end | 27 Dec 2024 | |
| RERA completion date | 27 Dec 2024 | |
| Work began, as filed | 28 Dec 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
| Architect's certificate, registration | Dated 6 Jan 2023 · site inspected 6 Jan 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 6 Jan 2023 | |
| Chartered accountant's certificate, registration | Dated 10 Jan 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.00 Cr 18.1%Development · ₹22.70 Cr 81.9%
| Estimated cost, at registration | ₹27.70 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹22.00 Cr | |
| Cost left | ₹1.15 Cr | |
| Receivable, sold villas | ₹78.1 L |
Sold (15) 57.7%Unsold (11) 42.3%
| Villas sold, at completion | 15 | |
|---|---|---|
| Villas unsold, at completion | 11 | |
| Villas in the phase | 26 |
| Escrow bank | HDFC · Sadahalli |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 1.5 km |
| 31 Mar 2030 |
| 100% (1,957 of 1,961) |
| Locked |
| Barca II At Godrej Msr City | about 1.5 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 2.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Varnam Phase 1c | about 2.5 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
|---|
| Projects within 4 km, counted | 33 (33 with an approximate location) | |
|---|---|---|
| Villas in them | 18,955 | |
| Booked | 13,092 of 18,955 (69%) | |
| Unsold | 5,863 | |
| Booked a month, pooled | 293 villas | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 3 km to the south-west, tertiary drain | |
|---|---|---|
| Metro, operational | about 23 km, Goraguntepalya | |
| Metro, under construction | about 2 km, Doddajala |
| Kempegowda Airport | 10.5 | 6 |
| MG Road (CBD) | 29 | 26.5 |
| Manyata Tech Park | 24 | 18.5 |
| ITPL, Whitefield | 40.5 | 26.5 |
| Ecospace, Bellandur ORR | 44.5 | 31.5 |
| Electronic City Ph 1 | 48.5 | 41 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 0.5 km, named Sadahalli Quarry on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |