78
/100
Review
80th percentile in Bengaluru Higher than 678 of 844 scored projects
This project 0 25 50 75 100 0 60 80 100 Percentile in Bengaluru Clear 80–100 Review 60–79 Red flag, below 60DOSL Score Title Approvals 100 Disputes Contract Valuation – Location 50 Construction 100 Developer 100 Loan 50 0 60 80 100
Google reviews S Surendra surya 18 Sep 2026 ★ ★ ★ ★ ★ My experience has been extremely disappointing. Unprofessional sales process: FLOW Realty, the sales agency appointed by the builder, appears to take little responsibility after booking, leaving buyers to deal with the builder directly.…
P Prishita Mohanty 10 Sep 2026 ★ ★ ★ ★ ★ Amazing unit plans with well-thought-out layouts, along with great real-view amenities that make the property even more appealing. Overall, a good experience.
S Simply Peace 8 Aug 2026 ★ ★ ★ ★ ★ I would give -5 rating if Google had those scale. This apartment is hell! 100 power cuts every day, bad builder, construction of phase 2 continues 7 days and never stop late night many times even after requesting. Water contamination, water…
Not verified yet: Recent price, super built-up; Gross yield; North Bengaluru, past year; Price paid per sq ft, super built-up.
•• ••• ••••
Title Title report •• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries Schedule in the EC vs KGIS neighbours Encumbrance certificate, Form 15 Survey sketch Survey sketch filed with K-RERA Sketch, sanction and mutation vs KGIS map Land record Filing vs KGIS map •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey Ownership Joint development agreement Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Belvedere By Ukn Airport District -Phase 2's developer filed before you say yes.
× Belvedere By Ukn Airport District -Phase 2
U.K.N. PROPERTIES PRIVATE LIMITED · Sadahalli / Navratna Agrahara, off Airport Rd
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Environmental clearance SEIAA 135 CON 2015 · issued 16 Feb 2016 ✓ Clear
Airport height NOC Filed with the registration
Pollution board (CFE) Filed with the registration
Water supply NOC Filed with the registration
RERA Registration certificates Registration certificate PRM/KA/RERA/1251/309/PR/060324/006682 Not verified yet: Validity.
•••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Belvedere By Ukn Airport District -Phase 2's developer filed before you say yes.
× Belvedere By Ukn Airport District -Phase 2
U.K.N. PROPERTIES PRIVATE LIMITED · Sadahalli / Navratna Agrahara, off Airport Rd
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
•• %
Payments Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Belvedere By Ukn Airport District -Phase 2's developer filed before you say yes.
× Belvedere By Ukn Airport District -Phase 2
U.K.N. PROPERTIES PRIVATE LIMITED · Sadahalli / Navratna Agrahara, off Airport Rd
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Residential1 BHK · avg 44 m²: 19.2% Residential 3 BHK/2BA · avg 89 m²: 8.1% 595 flats filed Residential 3 BHK/3BA · avg 104 m² 36.8% Residential 2 BHK · avg 70 m² 36% Residential1 BHK · avg 44 m² 19.2% Residential 3 BHK/2BA · avg 89 m² 8.1%
The area Comparable projects Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 5,558 unsold flats ÷ 298 booked a month across 32 projects 19 months Bhartiya Garden Estate Phase-2 Bhartiya Garden Estate Phase-2, about 0.5 km: 136 unsold ÷ 211 booked in 9 months 6 months Echoes Of Eden By Sumo Echoes Of Eden By Sumo, about 0.5 km: 27 unsold ÷ 14 booked in 9 months 17 months Bhartiya Garden Estate Phase-3 Bhartiya Garden Estate Phase-3, about 0.5 km: 162 unsold ÷ 381 booked in 9 months 4 months Jayan One Jayan One, about 1 km: 46 unsold ÷ 25 booked in 9 months 17 months Ds Max Sky Shlokam Ds Max Sky Shlokam, about 1 km: 382 unsold ÷ 290 booked in 9 months 12 months
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Basemap: Esri, OpenStreetMap contributors Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 220 kV Its corridor, to scale Buried cable Storm drain, smaller Approximate location: the filed pin, good to the neighbourhood, not the plotOpen on the map
Around it Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: about 10 km by road about 10 km MG Road (CBD) MG Road (CBD): about 28.5 km by road about 28.5 km Manyata Tech Park Manyata Tech Park: about 23.5 km by road about 23.5 km ITPL, Whitefield ITPL, Whitefield: about 40 km by road about 40 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: about 44 km by road about 44 km Electronic City Ph 1 Electronic City Ph 1: about 48 km by road about 48 km
Nuisances Distance from the filed pin Quarry Quarry: about 0.5 km, Sadahalli Quarry about 0.5 km Electrical substation Electrical substation: about 1 km about 1 km
Quarry Quarry: about 0.5 km, Sadahalli Quarry about 0.5 km Electrical substation Electrical substation: about 1 km about 1 km
Quarry Quarry: about 0.5 km, Sadahalli Quarry about 0.5 km Electrical substation Electrical substation: about 1 km about 1 km
Quarry
Not verified yet: Groundwater; Zoning, RMP 2015; Nearest high-tension line; Kitchen handover; Sewage plant; What it means; Through the year; Nearest city water main; Ground level.
0% 50% 100% Q3 2025-26: 35% 35% Q3 2025-26 Q4 2025-26: 41% 41% Q4 2025-26 Q1 2026-27: 43% 43% Q1 2026-27 Q2 2026-27: 51% 51% Q2 2026-27 Promised 28 Feb 2031: 100% (needed) Promised 28 Feb 2031 0% 50% 100% Q3 2025-26: 35% 35% Q3 2025-26 Q4 2025-26: 41% 41% Q4 2025-26 Q1 2026-27: 43% 43% Q1 2026-27 Q2 2026-27: 51% 51% Q2 2026-27 Promised 28 Feb 2031: 100% (needed) Promised 28 Feb 2031 0% 50% 100% Q3 2025-26: 35% 35% Q3 2025-26 Q4 2025-26: 41% 41% Q4 2025-26 Q1 2026-27: 43% 43% Q1 2026-27 Q2 2026-27: 51% 51% Q2 2026-27 Promised 28 Feb 2031: 100% (needed) Promised 28 Feb 2031 0% 50% 100% Q3 2025-26: 35% 35% Q3 2025-26 Q4 2025-26: 41% 41% Q4 2025-26 Q1 2026-27: 43% 43% Q1 2026-27 Q2 2026-27: 51% 51% Q2 2026-27 Promised 28 Feb 2031: 100% (needed) Promised 28 Feb 2031 As the promoter reported it Possession date in the agreement
Work left By component, Q2 2026-27 Tower A Tower A: 40% 40% Tower B Tower B: 50% 50% Tower E Tower E: 55% 55% Tower F Tower F: 55% 55% Tower G Tower G: 35% 35% Tower H Tower H: 50% 50% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 95% 95% Retaining wall (All types) Retaining wall (All types): 98% 98% Main structure Main structure: 50% 50% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 40% 40% Railing and Grill fixing Railing and Grill fixing: 9% 9% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 8% 8% Elevation work Elevation work: 5% 5% Club House Not started Electricity Not started Outdoor Sports facility Not started Parks Not started Swimming Pool Not started Water and Sanitation Not started Sewage Treatment Plant (STP) Not started Sewage and Drainage System Not started Solid waste management and disposal Not started Storm water drains Not started Street Lighting Not started Water Supply, external Not started Water conservation/rain water harvesting/recharg e of ground water, external Not started Electrification, Water supply and Sanitary Finishing Not started Basic work of Water supply, Sanitary and Electrification Not started Emergency Evacuation services Not started Fire protection and fire safety requirements Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharg e of ground water, internal Not started Common entrance and exit for the building/common portico/foyer/vera ndah Not started Common storage spaces Not started Corridor/Lobbies Not started Open parking areas Not started Staircases Not started Terrace Not started
Tower A Tower A: 40% 40% Tower B Tower B: 50% 50% Tower E Tower E: 55% 55% Tower F Tower F: 55% 55% Tower G Tower G: 35% 35% Tower H Tower H: 50% 50% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100%
Tower A Tower A: 40% 40% Tower B Tower B: 50% 50% Tower E Tower E: 55% 55% Tower F Tower F: 55% 55% Tower G Tower G: 35% 35% Tower H Tower H: 50% 50% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100%
Tower A Tower A: 40% 40% Tower B Tower B: 50% 50% Tower E Tower E: 55% 55% Tower F Tower F: 55% 55% Tower G Tower G: 35% 35% Tower H Tower H: 50% 50% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100%
Quarterly return, Q2 2026-27 Dates Dates Builder's schedule runs about 2 months past the promised possession date. 2024 2026 2028 2030 Work began 1 Mar 2024 As of 19 Nov 2026 Keys promised 28 Feb 2031 RERA deadline 28 Feb 2031 Builder's schedule ends 7 May 2031 Work began: 1 Mar 2024 As of 19 Nov 2026 Keys promised: 28 Feb 2031 RERA deadline: 28 Feb 2031 Builder's schedule ends: 7 May 2031
Builder's schedule runs about 2 months past the promised possession date. 2024 2026 2028 2030 Work began 1 Mar 2024 As of 19 Nov 2026 Keys promised 28 Feb 2031 RERA deadline 28 Feb 2031 Builder's schedule ends 7 May 2031 Work began: 1 Mar 2024 As of 19 Nov 2026 Keys promised: 28 Feb 2031 RERA deadline: 28 Feb 2031 Builder's schedule ends: 7 May 2031
Builder's schedule runs about 2 months past the promised possession date. 2024 2026 2028 2030 Work began 1 Mar 2024 As of 19 Nov 2026 Keys promised 28 Feb 2031 RERA deadline 28 Feb 2031 Builder's schedule ends 7 May 2031 Work began: 1 Mar 2024 As of 19 Nov 2026 Keys promised: 28 Feb 2031 RERA deadline: 28 Feb 2031 Builder's schedule ends: 7 May 2031
Builder's schedule runs about 2 months past the promised possession date. 2024 2026 2028 2030 Work began 1 Mar 2024 As of 19 Nov 2026 Keys promised 28 Feb 2031 RERA deadline 28 Feb 2031 Builder's schedule ends 7 May 2031 Work began: 1 Mar 2024 As of 19 Nov 2026 Keys promised: 28 Feb 2031 RERA deadline: 28 Feb 2031 Builder's schedule ends: 7 May 2031
Builder's schedule runs about 2 months past the promised possession date.
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Not verified yet: Structure; Structural safety certificate; Internal roads; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹2.71 Cr: 0.8% Development · ₹330.25 Cr: 99.2% ₹333 Cr estimated cost Land · ₹2.71 Cr 0.8% Development · ₹330.25 Cr 99.2%
Sales Sold vs unsold, Q2 2026-27 Sold (328): 54.3% Unsold (276): 45.7% 54% 604 flats Sold (328) 54.3% Unsold (276) 45.7%
Sold per quarter Q4 2025-26 Q4 2025-26: booked flats went from 316 to 326 10 flats Q1 2026-27 Q1 2026-27: booked flats went from 326 to 327 1 flat Q2 2026-27 Q2 2026-27: booked flats went from 327 to 328 1 flat
Q4 2025-26 Q4 2025-26: booked flats went from 316 to 326 10 flats Q1 2026-27 Q1 2026-27: booked flats went from 326 to 327 1 flat Q2 2026-27 Q2 2026-27: booked flats went from 327 to 328 1 flat
Q4 2025-26 Q4 2025-26: booked flats went from 316 to 326 10 flats Q1 2026-27 Q1 2026-27: booked flats went from 326 to 327 1 flat Q2 2026-27 Q2 2026-27: booked flats went from 327 to 328 1 flat
Q4 2025-26 Q4 2025-26: booked flats went from 316 to 326 10 flats Q1 2026-27 Q1 2026-27: booked flats went from 326 to 327 1 flat Q2 2026-27 Q2 2026-27: booked flats went from 327 to 328 1 flat
Compliance Escrow, Q2 2026-27 Paid in Paid into the designated account in Q2 2026-27 ₹9.28 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹8.50 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹9.28 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹8.50 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹9.28 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹8.50 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹9.28 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹8.50 Cr
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Q3 2025-26 Q3 2025-26: 35% built, as the promoter reported it 35% Q4 2025-26 Q4 2025-26: 41% built, as the promoter reported it 41% Q1 2026-27 Q1 2026-27: 43% built, as the promoter reported it 43% Q2 2026-27 Q2 2026-27: 51% built, as the promoter reported it 51%
Q3 2025-26 Q3 2025-26: 35% built, as the promoter reported it 35% Q4 2025-26 Q4 2025-26: 41% built, as the promoter reported it 41% Q1 2026-27 Q1 2026-27: 43% built, as the promoter reported it 43% Q2 2026-27 Q2 2026-27: 51% built, as the promoter reported it 51%
Q3 2025-26 Q3 2025-26: 35% built, as the promoter reported it 35% Q4 2025-26 Q4 2025-26: 41% built, as the promoter reported it 41% Q1 2026-27 Q1 2026-27: 43% built, as the promoter reported it 43% Q2 2026-27 Q2 2026-27: 51% built, as the promoter reported it 51%
Q3 2025-26 Q3 2025-26: 35% built, as the promoter reported it 35% Q4 2025-26 Q4 2025-26: 41% built, as the promoter reported it 41% Q1 2026-27 Q1 2026-27: 43% built, as the promoter reported it 43% Q2 2026-27 Q2 2026-27: 51% built, as the promoter reported it 51%
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
3 km 2 km Filed pin pin may be this far off: 1 km Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller Lake or tank Metro lines (dashed: planned) Metro station High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Approximate location: the filed pin, good to the neighbourhood, not the plotHydenben Clifton Hydenben Clifton, about 1 km: 61 unsold ÷ 9 booked in 9 months 61 months Within 4 km, pooled 5,558 unsold flats ÷ 298 booked a month across 32 projects 19 months Bhartiya Garden Estate Phase-2 Bhartiya Garden Estate Phase-2, about 0.5 km: 136 unsold ÷ 211 booked in 9 months 6 months Echoes Of Eden By Sumo Echoes Of Eden By Sumo, about 0.5 km: 27 unsold ÷ 14 booked in 9 months 17 months Bhartiya Garden Estate Phase-3 Bhartiya Garden Estate Phase-3, about 0.5 km: 162 unsold ÷ 381 booked in 9 months 4 months Jayan One Jayan One, about 1 km: 46 unsold ÷ 25 booked in 9 months 17 months Ds Max Sky Shlokam Ds Max Sky Shlokam, about 1 km: 382 unsold ÷ 290 booked in 9 months 12 months Hydenben Clifton Hydenben Clifton, about 1 km: 61 unsold ÷ 9 booked in 9 months 61 months
Within 4 km, pooled 5,558 unsold flats ÷ 298 booked a month across 32 projects 19 months Bhartiya Garden Estate Phase-2 Bhartiya Garden Estate Phase-2, about 0.5 km: 136 unsold ÷ 211 booked in 9 months 6 months Echoes Of Eden By Sumo Echoes Of Eden By Sumo, about 0.5 km: 27 unsold ÷ 14 booked in 9 months 17 months Bhartiya Garden Estate Phase-3 Bhartiya Garden Estate Phase-3, about 0.5 km: 162 unsold ÷ 381 booked in 9 months 4 months Jayan One Jayan One, about 1 km: 46 unsold ÷ 25 booked in 9 months 17 months Ds Max Sky Shlokam Ds Max Sky Shlokam, about 1 km: 382 unsold ÷ 290 booked in 9 months 12 months Hydenben Clifton Hydenben Clifton, about 1 km: 61 unsold ÷ 9 booked in 9 months 61 months
Within 4 km, pooled 5,558 unsold flats ÷ 298 booked a month across 32 projects 19 months Bhartiya Garden Estate Phase-2 Bhartiya Garden Estate Phase-2, about 0.5 km: 136 unsold ÷ 211 booked in 9 months 6 months Echoes Of Eden By Sumo Echoes Of Eden By Sumo, about 0.5 km: 27 unsold ÷ 14 booked in 9 months 17 months Bhartiya Garden Estate Phase-3 Bhartiya Garden Estate Phase-3, about 0.5 km: 162 unsold ÷ 381 booked in 9 months 4 months Jayan One Jayan One, about 1 km: 46 unsold ÷ 25 booked in 9 months 17 months Ds Max Sky Shlokam Ds Max Sky Shlokam, about 1 km: 382 unsold ÷ 290 booked in 9 months 12 months Hydenben Clifton Hydenben Clifton, about 1 km: 61 unsold ÷ 9 booked in 9 months 61 months
1 km Filed pin pin may be this far off: 1 km 1 km Filed pin pin may be this far off: 1 km 3 km 2 km Filed pin pin may be this far off: 1 km Kempegowda Airport Kempegowda Airport: about 10 km by road about 10 km MG Road (CBD) MG Road (CBD): about 28.5 km by road about 28.5 km Manyata Tech Park Manyata Tech Park: about 23.5 km by road about 23.5 km ITPL, Whitefield ITPL, Whitefield: about 40 km by road about 40 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: about 44 km by road about 44 km Electronic City Ph 1 Electronic City Ph 1: about 48 km by road about 48 km Kempegowda Airport Kempegowda Airport: about 10 km by road about 10 km MG Road (CBD) MG Road (CBD): about 28.5 km by road about 28.5 km Manyata Tech Park Manyata Tech Park: about 23.5 km by road about 23.5 km ITPL, Whitefield ITPL, Whitefield: about 40 km by road about 40 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: about 44 km by road about 44 km Electronic City Ph 1 Electronic City Ph 1: about 48 km by road about 48 km
Kempegowda Airport Kempegowda Airport: about 10 km by road about 10 km MG Road (CBD) MG Road (CBD): about 28.5 km by road about 28.5 km Manyata Tech Park Manyata Tech Park: about 23.5 km by road about 23.5 km ITPL, Whitefield ITPL, Whitefield: about 40 km by road about 40 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: about 44 km by road about 44 km Electronic City Ph 1 Electronic City Ph 1: about 48 km by road about 48 km
Six city anchors · OSRM, no traffic Quarry: about 0.5 km, Sadahalli Quarry about 0.5 km Electrical substation Electrical substation: about 1 km about 1 km
100% Upto Plinth Level Upto Plinth Level: 95% 95% Retaining wall (All types) Retaining wall (All types): 98% 98% Main structure Main structure: 50% 50% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 40% 40% Railing and Grill fixing Railing and Grill fixing: 9% 9% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 8% 8% Elevation work Elevation work: 5% 5% Club House Not started Electricity Not started Outdoor Sports facility Not started Parks Not started Swimming Pool Not started Water and Sanitation Not started Sewage Treatment Plant (STP) Not started Sewage and Drainage System Not started Solid waste management and disposal Not started Storm water drains Not started Street Lighting Not started Water Supply, external Not started Water conservation/rain water harvesting/recharge of ground water, external Not started Electrification, Water supply and Sanitary Finishing Not started Basic work of Water supply, Sanitary and Electrification Not started Emergency Evacuation services Not started Fire protection and fire safety requirements Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Common storage spaces Not started Corridor/Lobbies Not started Open parking areas Not started Staircases Not started Terrace Not started 100% Upto Plinth Level Upto Plinth Level: 95% 95% Retaining wall (All types) Retaining wall (All types): 98% 98% Main structure Main structure: 50% 50% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 40% 40% Railing and Grill fixing Railing and Grill fixing: 9% 9% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 8% 8% Elevation work Elevation work: 5% 5% Club House Not started Electricity Not started Outdoor Sports facility Not started Parks Not started Swimming Pool Not started Water and Sanitation Not started Sewage Treatment Plant (STP) Not started Sewage and Drainage System Not started Solid waste management and disposal Not started Storm water drains Not started Street Lighting Not started Water Supply, external Not started Water conservation/rain water harvesting/recharge of ground water, external Not started Electrification, Water supply and Sanitary Finishing Not started Basic work of Water supply, Sanitary and Electrification Not started Emergency Evacuation services Not started Fire protection and fire safety requirements Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Common storage spaces Not started Corridor/Lobbies Not started Open parking areas Not started Staircases Not started Terrace Not started 100% Upto Plinth Level Upto Plinth Level: 95% 95% Retaining wall (All types) Retaining wall (All types): 98% 98% Main structure Main structure: 50% 50% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 40% 40% Railing and Grill fixing Railing and Grill fixing: 9% 9% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 8% 8% Elevation work Elevation work: 5% 5% Club House Not started Electricity Not started Outdoor Sports facility Not started Parks Not started Swimming Pool Not started Water and Sanitation Not started Sewage Treatment Plant (STP) Not started Sewage and Drainage System Not started Solid waste management and disposal Not started Storm water drains Not started Street Lighting Not started Water Supply, external Not started Water conservation/rain water harvesting/recharge of ground water, external Not started Electrification, Water supply and Sanitary Finishing Not started Basic work of Water supply, Sanitary and Electrification Not started Emergency Evacuation services Not started Fire protection and fire safety requirements Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Common storage spaces Not started Corridor/Lobbies Not started Open parking areas Not started Staircases Not started Terrace Not started