Overview
Cosmos
Overview
Cosmos
Overview
Cosmos
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | 1 | Clear |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DC OFFICE BENGALURU · Survey 58/2
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 20 Jan 2026 · No. BBMP/CC/17738/25-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Builder: CORBITAL BUILDERS
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 74 m² 58.8%3BHK · avg 81 m² 41.2%
Location & risks
Construction & progress
Developer
Land · ₹30.78 Cr 75.8%Development · ₹9.85 Cr 24.2%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 20 Jan 2026 | |
| Escrow bank | ICICI Bank · HRBR LAYOUT |
Data room
Source: K-RERA project page and the documents filed there, as read by us. 15 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Cosmos in the interactive atlas
Transfer of the land
Sale deed
Survey 58/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 58/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/CC/17738/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/160726/008813
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 58/2 | |
|---|---|---|
| Land extent, Sy 58/2 | 0.39.0.00 | |
| Land area of this registration | 3,946 sq m | |
| Khata | A Khatha · BBMP · 26 Aug 2024 | |
| Sale deed | Dated 29 Jul 2024 |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2029 |
| Land conversion | Converted 28 Jun 2024 · DC OFFICE BENGALURU | |
|---|---|---|
| Survey numbers | 58/2 |
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 40 | 797 |
| 3BHK | 28 | 876 |
| Sattva Vasanta Skye | about 0.5 km | Locked | |
|---|---|---|---|
| Sattva Vasanta Cove | about 0.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 1.5 km | Locked | |
| Godrej MSR City | about 2 km | Locked | |
| Barca II At Godrej Msr City | about 2 km | Locked | |
| Varnam Phase 1c | about 2.5 km | Locked | |
| Birla Trimaya Phase-3 | about 2.5 km | Locked | |
| Birla Trimaya Phase-2 | about 3 km | Locked | |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 3 km | Locked | |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 3 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 3 km | Locked | |
| Birla Trimaya | about 3 km | Locked |
| Cosmos This project | This project is the point the others are measured from | 31 Dec 2029 | – | Not verified yet |
|---|---|---|---|---|
| Sattva Vasanta Skye | about 0.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Sattva Vasanta Cove | about 0.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
| Aeropolis, A Project Of Sattva Group |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 13.5 km, Kondappa layout |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 0.00 (0 covered spaces for 68 units) | |
| Power backup | Not declared |
| Schedule end | 31 Dec 2029 | |
|---|---|---|
| RERA completion date | 31 Dec 2029 | |
| Work began, as filed | 1 Jul 2026 |
| Building heights, fire NOC | 14.95 m filed |
|---|
| Power backup | Not provided |
|---|
| Estimated cost, at registration | ₹40.63 Cr |
|---|
| Escrow bank | ICICI Bank · HRBR LAYOUT |
|---|
| about 1.5 km |
| 9 Jul 2026 |
| 95% (949 of 1,001) |
| Locked |
| Godrej MSR City | about 2 km | 31 Mar 2030 | 100% (1,957 of 1,961) | Locked |
|---|
| Barca II At Godrej Msr City | about 2 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
|---|
| Varnam Phase 1c | about 2.5 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
|---|
| Projects within 4 km, counted | 31 (31 with an approximate location) | |
|---|---|---|
| Flats in them | 15,546 | |
| Booked | 10,082 of 15,546 (65%) | |
| Unsold | 5,464 | |
| Booked a month, pooled | 176 flats | |
| Months to sell, pooled | 30 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 23.5 km, K.R. Puram | |
| Metro, under construction | about 3 km, Doddajala |
| Kempegowda Airport | 11.5 | 5.5 |
| MG Road (CBD) | 32 | 27 |
| Manyata Tech Park | 27 | 19 |
| ITPL, Whitefield | 43.5 | 26.5 |
| Ecospace, Bellandur ORR | 47.5 | 32 |
| Electronic City Ph 1 | 51.5 | 41.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1.5 km, named Sadahalli Quarry on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the east |