Overview
Ds Max Spoorthi Nest
Overview
Ds Max Spoorthi Nest
Overview
Ds Max Spoorthi Nest
Overview
Title & ownership
Approvals
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 11 Mar 2025 · No. STRRPA/TP/CC/37/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 83 m² 93%2BHK
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹38.13 Cr |
|---|
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 11 Mar 2025 | |
| Escrow bank | Indian Bank · Kalyan nagar |
Data room
113 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
All 194 projects in Sarjapur → · DS Max Properties Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ds Max Spoorthi Nest in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | Converted 1 Jan 2022 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 76/10 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 13 | 9,149 |
| 3BHK | 174 | 1,55,517 |
| Sold, Q2 2026-27 | 27 / 187 | |
|---|---|---|
| Unsold, Q2 2026-27 | 160 | |
| Months to sell, derived from filed bookings | Too few bookings to project (3 flats booked in 6 months) |
| Mitta Orrin | about 2.5 km | Locked | |
|---|---|---|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 4.5 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 4.5 km | Locked | |
| Mahidhara Harmony | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 4.5 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 4.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 4.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 4.5 km | Locked | |
| SOBHA Townpark | about 5 km | Locked |
| Ds Max Spoorthi Nest This project | This project is the point the others are measured from | 31 Dec 2030 | 14% (27 of 187) | Not verified yet |
|---|---|---|---|---|
| Mitta Orrin | about 2.5 km | 31 Dec 2027 | 46% (36 of 79) | Locked |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 4.5 km | 31 Dec 2026 | 100% (280 of 280) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 12.5 km, Gunjur |
|---|
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 0.76 (142 covered spaces for 187 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 21 Dec 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 16 Sep 2030 | |
| Completion | 15% | |
| Completion, accountant | 16.3% of the estimated cost spent |
| Possession, agreement | 31 Dec 2030 | |
|---|---|---|
| Schedule end | 31 Dec 2030 | |
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 1 Dec 2025 |
| Structure | RCC framed structure | |
|---|---|---|
| Building heights, fire NOC | 14.95 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 11.14 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 9 Oct 2025 · site inspected 7 Oct 2025 | |
| Engineer's certificate, registration | Dated 9 Oct 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, engineer's certificate | ₹25.56 Cr |
|---|
| Estimated cost, Form 4 Q2 2026-27 | ₹25.75 Cr |
|---|
| Cost incurred | ₹4.19 Cr (16.3% of the Form 4 Q2 2026-27 estimate) |
|---|
Sold (27) 14.4%Unsold (160) 85.6%
| Sold, Q4 2025-26 | 24 / 187 · 163 available | |
|---|---|---|
| Sold, Q1 2026-27 | 23 / 187 · 164 available | |
| Sold, Q2 2026-27 | 27 / 187 · 160 available | |
| Unsold, Q2 2026-27 | 160 | |
| Sold in Q1 2026-27 | 1 booking cancelled or corrected (24 → 23 sold) | |
| Sold in Q2 2026-27 | 4 | |
| Flats booked, Form 4 Q4 2025-26 | 24 |
| Escrow bank | Indian Bank · Kalyan nagar | |
|---|---|---|
| Designated account, collected | ₹70.7 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹71.4 L in Q2 2026-27 | |
| Share of collections deposited in escrow | 100% |
| K-RERA registrations under this promoter | 46 | |
|---|---|---|
| Marked completed | 26 | |
| Past promised date, not completed | 6 | |
| Other phases under this promoter name | 39 | |
| With a filed extension or completion | 22 (19 completed, 3 extended) | |
| Average schedule slip | 22 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 4.5 km | 30 Sep 2028 | 100% (280 of 280) | Locked |
|---|
| Mahidhara Harmony | about 4.5 km | 10 Sep 2026 | 62% (91 of 146) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4.5 km | 30 Jun 2028 | 100% (261 of 261) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4.5 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
|---|
| Projects within 4 km, counted | 15 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 3,470 | |
| Booked | 1,430 of 3,470 (41%) | |
| Unsold | 2,040 | |
| Booked a month, pooled | 73 flats | |
| Months to sell, pooled | 27 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Handenahalli Grama Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 9.5 km, Bommasandra | |
| Metro, under construction | about 16 km, Kadubeesanahalli |
| Kempegowda Airport | 59 | 43 |
| MG Road (CBD) | 36.5 | 26 |
| Manyata Tech Park | 40 | 30.5 |
| ITPL, Whitefield | 25.5 | 19 |
| Ecospace, Bellandur ORR | 21.5 | 16 |
| Electronic City Ph 1 | 19 | 11 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |