Not verified yet: Recent price, super built-up; Gross yield; North Bengaluru, past year; Price paid per sq ft, super built-up.
•• ••• ••••
Title Title report •• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries Schedule in the EC vs KGIS neighbours Survey sketch Survey sketch filed with K-RERA Sketch, sanction and mutation vs KGIS map Land record Filing vs KGIS map •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey Ownership Joint development agreement •• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Embassy Edge (Embassy Springs)'s developer filed before you say yes.
× Embassy Edge (Embassy Springs)
Embassy Group · Devanahalli
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Airport height (2 of 2) valid until 6 Apr 2029 Airport height (2 of 2): valid until 6 Apr 2029 As of 18 Nov 2026 2021 2023 2025 2027 2029 Airport height (1 of 2) valid until 18 Mar 2029 Airport height (1 of 2): valid until 18 Mar 2029 Airport height (2 of 2) valid until 6 Apr 2029 Airport height (2 of 2): valid until 6 Apr 2029 As of 18 Nov 2026
2021 2023 2025 2027 2029 Airport height (1 of 2) valid until 18 Mar 2029 Airport height (1 of 2): valid until 18 Mar 2029 Airport height (2 of 2) valid until 6 Apr 2029 Airport height (2 of 2): valid until 6 Apr 2029 As of 18 Nov 2026
2021 2023 2025 2027 2029 Airport height (1 of 2) valid until 18 Mar 2029 Airport height (1 of 2): valid until 18 Mar 2029 Airport height (2 of 2) valid until 6 Apr 2029 Airport height (2 of 2): valid until 6 Apr 2029 As of 18 Nov 2026
Valid as of this report Validity ended
RERA Registration certificates Registration certificate PRM/KA/RERA/1250/303/PR/180526/001825 Not verified yet: Building plan, Land conversion, Conversion order.
•••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Embassy Edge (Embassy Springs)'s developer filed before you say yes.
× Embassy Edge (Embassy Springs)
Embassy Group · Devanahalli
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
•• %
Payments Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Embassy Edge (Embassy Springs)'s developer filed before you say yes.
× Embassy Edge (Embassy Springs)
Embassy Group · Devanahalli
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Months to sell, derived from filed bookings
The area Comparable projects Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 3,696 unsold flats ÷ 233 booked a month across 15 projects 16 months Embassy Verde Phase 2 Embassy Verde Phase 2, about 0.5 km: 5 unsold ÷ 697 booked in 9 months 0 months Embassy Verde…assy Springs) Embassy Verde (Embassy Springs), 330 m: 1 unsold ÷ 96 booked in 9 months 0 months Embassy Greens…assy Springs) Embassy Greenshore (Embassy Springs), 530 m: 251 unsold ÷ 146 booked in 9 months 16 months Serene Amara B…umbia Pacific Serene Amara By Columbia Pacific, about 1 km: 3 unsold ÷ 19 booked in 6 months 1 months Ds Max Sky Shlokam Ds Max Sky Shlokam, about 2.5 km: 382 unsold ÷ 290 booked in 9 months
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Unit mix filed; Unit types; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Median rent, 3 km; Rents and yields.
21.0 km Peenya
Around it Water Groundwater, Yelahanka taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Yelahanka: 32.6 m Yelahanka taluk average, July 2023 11.4 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
Not verified yet: Kitchen handover, Sewage plant, Power backup.
100% Q3 2025-26: 61% 61% Q3 2025-26 Q4 2025-26: 66% 66% Q4 2025-26 Q1 2026-27: 72% 72% Q1 2026-27 Q2 2026-27: 83% 83% Q2 2026-27 0% 50% 100% Q3 2025-26: 61% 61% Q3 2025-26 Q4 2025-26: 66% 66% Q4 2025-26 Q1 2026-27: 72% 72% Q1 2026-27 Q2 2026-27: 83% 83% Q2 2026-27 0% 50% 100% Q3 2025-26: 61% 61% Q3 2025-26 Q4 2025-26: 66% 66% Q4 2025-26 Q1 2026-27: 72% 72% Q1 2026-27 Q2 2026-27: 83% 83% Q2 2026-27 0% 50% 100% Q3 2025-26: 61% 61% Q3 2025-26 Q4 2025-26: 66% 66% Q4 2025-26 Q1 2026-27: 72% 72% Q1 2026-27 Q2 2026-27: 83% 83% Q2 2026-27 As the promoter reported it
Work left By component, Q2 2026-27 Tower Gardenia Tower Gardenia: 72% 72% Tower Hibiscus Tower Hibiscus: 77% 77% Tower Fucshia Tower Fucshia: 67% 67% Tower Daisy Tower Daisy: 67% 67% Tower Elderberry Tower Elderberry: 75% 75% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Sub-structure flooring (Parking Floor, more than one floor below general ground level) Sub-structure flooring (Parking Floor, more than one floor below general ground level): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 80% 80% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 55% 55% Railing and Grill fixing Railing and Grill fixing: 52% 52% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 48% 48% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 28% 28% Staircases Staircases: 25% 25% CCTV Surveillance Not started Electricity Not started Gas Not started Outdoor Sports facility Not started Parks Not started Swimming Pool Not started Storm water drains Not started Internal and External work including landscapes as per santioned drawings Not started Painting Not started Energy management Not started Sewage and Drainage System Not started Solid waste management and disposal Not started Street Lighting Not started Water Supply Not started Common entrance and exit for the building / common portico/foyer/vera ndah Not started Outer Wall Not started Staircases and Lift lobbies, corridor,lobbies, corridor Not started Water conservation and renewable energy Not started
Tower Gardenia Tower Gardenia: 72% 72% Tower Hibiscus Tower Hibiscus: 77% 77% Tower Fucshia Tower Fucshia: 67% 67% Tower Daisy Tower Daisy: 67% 67% Tower Elderberry Tower Elderberry: 75% 75% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100%
Tower Gardenia Tower Gardenia: 72% 72% Tower Hibiscus Tower Hibiscus: 77% 77% Tower Fucshia Tower Fucshia: 67% 67% Tower Daisy Tower Daisy: 67% 67% Tower Elderberry Tower Elderberry: 75% 75% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100%
Tower Gardenia Tower Gardenia: 72% 72% Tower Hibiscus Tower Hibiscus: 77% 77% Tower Fucshia Tower Fucshia: 67% 67% Tower Daisy Tower Daisy: 67% 67% Tower Elderberry Tower Elderberry: 75% 75% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100%
Quarterly return, Q2 2026-27 Dates Dates 2018 2021 2024 2027 Work began 20 Feb 2018 Builder's schedule ends 4 Jun 2021 As of 18 Nov 2026 RERA deadline 31 Dec 2027 Work began: 20 Feb 2018 Builder's schedule ends: 4 Jun 2021 As of 18 Nov 2026 RERA deadline: 31 Dec 2027
2018 2020 2022 2024 2026 2028 Work began 20 Feb 2018 Builder's schedule ends 4 Jun 2021 As of 18 Nov 2026 RERA deadline 31 Dec 2027 Work began: 20 Feb 2018 Builder's schedule ends: 4 Jun 2021 As of 18 Nov 2026 RERA deadline: 31 Dec 2027
2018 2020 2022 2024 2026 2028 Work began 20 Feb 2018 Builder's schedule ends 4 Jun 2021 As of 18 Nov 2026 RERA deadline 31 Dec 2027 Work began: 20 Feb 2018 Builder's schedule ends: 4 Jun 2021 As of 18 Nov 2026 RERA deadline: 31 Dec 2027
2018 2020 2022 2024 2026 2028 Work began 20 Feb 2018 Builder's schedule ends 4 Jun 2021 As of 18 Nov 2026 RERA deadline 31 Dec 2027 Work began: 20 Feb 2018 Builder's schedule ends: 4 Jun 2021 As of 18 Nov 2026 RERA deadline: 31 Dec 2027
Certificates Engineer, architect and fire certificates Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Club house; What the promoter specified · not an inspection; Specification sheet · brands "or equivalent"; Design consultants (Form 6).
Land · ₹73.93 Cr: 17.9% Development · ₹339.84 Cr: 82.1% ₹414 Cr estimated cost Land · ₹73.93 Cr 17.9% Development · ₹339.84 Cr 82.1%
Sales Sold vs unsold, Q2 2026-27 Sold (723): 87.5% Unsold (103): 12.5% 88% 826 flats Sold (723) 87.5% Unsold (103) 12.5%
Sold per quarter Q4 2025-26 Q4 2025-26: booked flats went from 610 to 624 14 flats Q1 2026-27 Q1 2026-27: booked flats went from 624 to 673 49 flats Q2 2026-27 Q2 2026-27: booked flats went from 673 to 723 50 flats
Q4 2025-26 Q4 2025-26: booked flats went from 610 to 624 14 flats Q1 2026-27 Q1 2026-27: booked flats went from 624 to 673 49 flats Q2 2026-27 Q2 2026-27: booked flats went from 673 to 723 50 flats
Q4 2025-26 Q4 2025-26: booked flats went from 610 to 624 14 flats Q1 2026-27 Q1 2026-27: booked flats went from 624 to 673 49 flats Q2 2026-27 Q2 2026-27: booked flats went from 673 to 723 50 flats
Q4 2025-26 Q4 2025-26: booked flats went from 610 to 624 14 flats Q1 2026-27 Q1 2026-27: booked flats went from 624 to 673 49 flats Q2 2026-27 Q2 2026-27: booked flats went from 673 to 723 50 flats
Compliance Escrow, Q2 2026-27 Paid in Paid into the designated account in Q2 2026-27 ₹30.67 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹20.80 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹30.67 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹20.80 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹30.67 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹20.80 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹30.67 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹20.80 Cr
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip.
Q1 2026-27 Q1 2026-27: 72% built, as the promoter reported it 72% Q2 2026-27 Q2 2026-27: 83% built, as the promoter reported it 83% Q3 2025-26 Q3 2025-26: 61% built, as the promoter reported it 61% Q4 2025-26 Q4 2025-26: 66% built, as the promoter reported it 66% Q1 2026-27 Q1 2026-27: 72% built, as the promoter reported it 72% Q2 2026-27 Q2 2026-27: 83% built, as the promoter reported it 83%
Q3 2025-26 Q3 2025-26: 61% built, as the promoter reported it 61% Q4 2025-26 Q4 2025-26: 66% built, as the promoter reported it 66% Q1 2026-27 Q1 2026-27: 72% built, as the promoter reported it 72% Q2 2026-27 Q2 2026-27: 83% built, as the promoter reported it 83%
Q3 2025-26 Q3 2025-26: 61% built, as the promoter reported it 61% Q4 2025-26 Q4 2025-26: 66% built, as the promoter reported it 66% Q1 2026-27 Q1 2026-27: 72% built, as the promoter reported it 72% Q2 2026-27 Q2 2026-27: 83% built, as the promoter reported it 83%
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Records searched to; Building plan; Unregistered agreements, over 10% paid; Sale deed in favour of.
1 km 3 km 2 km Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, smaller Lake or tank Metro lines (dashed: planned) Metro station High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable The site12 months Echoes Of Eden By Sumo Echoes Of Eden By Sumo, about 2.5 km: 27 unsold ÷ 14 booked in 9 months 17 months Within 4 km, pooled 3,696 unsold flats ÷ 233 booked a month across 15 projects 16 months Embassy Verde Phase 2 Embassy Verde Phase 2, about 0.5 km: 5 unsold ÷ 697 booked in 9 months 0 months Embassy Verde…assy Springs) Embassy Verde (Embassy Springs), 330 m: 1 unsold ÷ 96 booked in 9 months 0 months Embassy Greens…assy Springs) Embassy Greenshore (Embassy Springs), 530 m: 251 unsold ÷ 146 booked in 9 months 16 months Serene Amara B…umbia Pacific Serene Amara By Columbia Pacific, about 1 km: 3 unsold ÷ 19 booked in 6 months 1 months Ds Max Sky Shlokam Ds Max Sky Shlokam, about 2.5 km: 382 unsold ÷ 290 booked in 9 months 12 months Echoes Of Eden By Sumo Echoes Of Eden By Sumo, about 2.5 km: 27 unsold ÷ 14 booked in 9 months 17 months
Within 4 km, pooled 3,696 unsold flats ÷ 233 booked a month across 15 projects 16 months Embassy Verde Phase 2 Embassy Verde Phase 2, about 0.5 km: 5 unsold ÷ 697 booked in 9 months 0 months Embassy Verde…assy Springs) Embassy Verde (Embassy Springs), 330 m: 1 unsold ÷ 96 booked in 9 months 0 months Embassy Greens…assy Springs) Embassy Greenshore (Embassy Springs), 530 m: 251 unsold ÷ 146 booked in 9 months 16 months Serene Amara B…umbia Pacific Serene Amara By Columbia Pacific, about 1 km: 3 unsold ÷ 19 booked in 6 months 1 months Ds Max Sky Shlokam Ds Max Sky Shlokam, about 2.5 km: 382 unsold ÷ 290 booked in 9 months 12 months Echoes Of Eden By Sumo Echoes Of Eden By Sumo, about 2.5 km: 27 unsold ÷ 14 booked in 9 months 17 months
Within 4 km, pooled 3,696 unsold flats ÷ 233 booked a month across 15 projects 16 months Embassy Verde Phase 2 Embassy Verde Phase 2, about 0.5 km: 5 unsold ÷ 697 booked in 9 months 0 months Embassy Verde…assy Springs) Embassy Verde (Embassy Springs), 330 m: 1 unsold ÷ 96 booked in 9 months 0 months Embassy Greens…assy Springs) Embassy Greenshore (Embassy Springs), 530 m: 251 unsold ÷ 146 booked in 9 months 16 months Serene Amara B…umbia Pacific Serene Amara By Columbia Pacific, about 1 km: 3 unsold ÷ 19 booked in 6 months 1 months Ds Max Sky Shlokam Ds Max Sky Shlokam, about 2.5 km: 382 unsold ÷ 290 booked in 9 months 12 months Echoes Of Eden By Sumo Echoes Of Eden By Sumo, about 2.5 km: 27 unsold ÷ 14 booked in 9 months 17 months
500 m Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
20 to 40 Ten-year July mean for Yelahanka: 32.6 m Yelahanka taluk average, July 2023 11.4 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Yelahanka: 32.6 m Yelahanka taluk average, July 2023 11.4 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Yelahanka: 32.6 m Yelahanka taluk average, July 2023 11.4 m below ground Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: 14.3 km by road 14.3 km MG Road (CBD) MG Road (CBD): 31.5 km by road 31.5 km Manyata Tech Park Manyata Tech Park: 26.7 km by road 26.7 km ITPL, Whitefield ITPL, Whitefield: 44.3 km by road 44.3 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 47.0 km by road 47.0 km Electronic City Ph 1 Electronic City Ph 1: 51.4 km by road 51.4 km
Kempegowda Airport Kempegowda Airport: 14.3 km by road 14.3 km MG Road (CBD) MG Road (CBD): 31.5 km by road 31.5 km Manyata Tech Park Manyata Tech Park: 26.7 km by road 26.7 km ITPL, Whitefield ITPL, Whitefield: 44.3 km by road 44.3 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 47.0 km by road 47.0 km Electronic City Ph 1 Electronic City Ph 1: 51.4 km by road 51.4 km
Kempegowda Airport Kempegowda Airport: 14.3 km by road 14.3 km MG Road (CBD) MG Road (CBD): 31.5 km by road 31.5 km Manyata Tech Park Manyata Tech Park: 26.7 km by road 26.7 km ITPL, Whitefield ITPL, Whitefield: 44.3 km by road 44.3 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 47.0 km by road 47.0 km Electronic City Ph 1 Electronic City Ph 1: 51.4 km by road 51.4 km
Kempegowda Airport Kempegowda Airport: 14.3 km by road 14.3 km MG Road (CBD) MG Road (CBD): 31.5 km by road 31.5 km Manyata Tech Park Manyata Tech Park: 26.7 km by road 26.7 km ITPL, Whitefield ITPL, Whitefield: 44.3 km by road 44.3 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 47.0 km by road 47.0 km Electronic City Ph 1 Electronic City Ph 1: 51.4 km by road 51.4 km
Six city anchors · OSRM, no traffic Nuisances Distance from the site Quarry Quarry: 1.9 km 1.9 km Electrical substation Electrical substation: 3.0 km 3.0 km
Quarry Quarry: 1.9 km 1.9 km Electrical substation Electrical substation: 3.0 km 3.0 km
Quarry Quarry: 1.9 km 1.9 km Electrical substation Electrical substation: 3.0 km 3.0 km
Quarry Quarry: 1.9 km 1.9 km Electrical substation Electrical substation: 3.0 km 3.0 km
Sub-structure flooring (Parking Floor, more than one floor below general ground level) Sub-structure flooring (Parking Floor, more than one floor below general ground level): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 80% 80% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 55% 55% Railing and Grill fixing Railing and Grill fixing: 52% 52% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 48% 48% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 28% 28% Staircases Staircases: 25% 25% CCTV Surveillance Not started Electricity Not started Gas Not started Outdoor Sports facility Not started Parks Not started Swimming Pool Not started Storm water drains Not started Internal and External work including landscapes as per santioned drawings Not started Painting Not started Energy management Not started Sewage and Drainage System Not started Solid waste management and disposal Not started Street Lighting Not started Water Supply Not started Common entrance and exit for the building / common portico/foyer/verandah Not started Outer Wall Not started Staircases and Lift lobbies, corridor,lobbies, corridor Not started Water conservation and renewable energy Not started Sub-structure flooring (Parking Floor, more than one floor below general ground level) Sub-structure flooring (Parking Floor, more than one floor below general ground level): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 80% 80% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 55% 55% Railing and Grill fixing Railing and Grill fixing: 52% 52% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 48% 48% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 28% 28% Staircases Staircases: 25% 25% CCTV Surveillance Not started Electricity Not started Gas Not started Outdoor Sports facility Not started Parks Not started Swimming Pool Not started Storm water drains Not started Internal and External work including landscapes as per santioned drawings Not started Painting Not started Energy management Not started Sewage and Drainage System Not started Solid waste management and disposal Not started Street Lighting Not started Water Supply Not started Common entrance and exit for the building / common portico/foyer/verandah Not started Outer Wall Not started Staircases and Lift lobbies, corridor,lobbies, corridor Not started Water conservation and renewable energy Not started Sub-structure flooring (Parking Floor, more than one floor below general ground level) Sub-structure flooring (Parking Floor, more than one floor below general ground level): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 80% 80% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 55% 55% Railing and Grill fixing Railing and Grill fixing: 52% 52% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 48% 48% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 28% 28% Staircases Staircases: 25% 25% CCTV Surveillance Not started Electricity Not started Gas Not started Outdoor Sports facility Not started Parks Not started Swimming Pool Not started Storm water drains Not started Internal and External work including landscapes as per santioned drawings Not started Painting Not started Energy management Not started Sewage and Drainage System Not started Solid waste management and disposal Not started Street Lighting Not started Water Supply Not started Common entrance and exit for the building / common portico/foyer/verandah Not started Outer Wall Not started Staircases and Lift lobbies, corridor,lobbies, corridor Not started Water conservation and renewable energy Not started