Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer fee₹ ••,•••
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Review2 to review
Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedBorewellDeclared by the promoter
Metro, operationalabout 21 kmPeenya
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion9%As of Q2 2026-27, promoter's return
Possession, agreement30 Jun 2031Agreement for sale, p. 16
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Review1 to review · 1 clear
Sold697 / 702✓ClearClear
Sold in Q2 2026-271!ReviewReview
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Records searched to
31 Aug 2025
Building plan (BIAPPA)
Sanctioned 30 Sep 2025
Escrow bank
HDFC · Kasturba Road
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
224 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 3 of 12 filed survey numbers matched, 9 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Very close to HT wire, flights noise Only one swimming pool and club house For 2800 flats.. they say 288acre but in fact there is separate gate for each apartment and villa groups.. they don't open and tell clearly on Available units The…
AAkshay Kamath29 Jul 2026★★★★★
I recently booked a 2.5 BHK at Embassy Verde Phase 2 and have been impressed with the project so far. The biggest highlight is the well-planned township with lots of greenery, which creates a pleasant and peaceful environment. The location…
KKiran Bb12 Jul 2026★★★★★
It's a good project with plenyof payment options. A bit far from the main road but could be a peaceful place to live in future with good facilities within the campus
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Embassy Verde Phase 2 in the interactive atlas
16 Jul 2012
DC Office, Bangalore Rural
26 Apr 2005in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local Panchayath
1 Acre
Survey 59
59/2
10 Aug 2012DC Office, Bangalore Rural
14 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local panchayath
3 Acres 13 Guntas
59/3P (part)
23 Aug 2012DC Office, Bangalore Rural
25 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local Panchayath
21 Guntas
93
23 Aug 2012DC Office, Bangalore Rural
18 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local Panchayath
20 Guntas
94
24 Aug 2012DC Office, Bangalore Rural
21 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local Panchayath
20 Guntas
99
16 Jul 2012DC Office, Bangalore Rural
3 May 2005in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local panchayath
30 Guntas
102
23 Aug 2012DC Office, Bangalore Rural
18 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local panchayath
1 Acre 2 Guntas
103
23 Aug 2012DC Office, Bangalore Rural
18 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local Panchayath
1 Acre
105
24 Aug 2012DC Office, Bangalore Rural
20 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local Panchayath
1 Acre
109
10 Aug 2012DC Office, Bangalore Rural
21 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local panchayath
1 Acre 4 Guntas
112
16 Jul 2012DC Office, Bangalore Rural
16 Mar 2005in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local Panchayath
1 Acre 26 Guntas
106
23 Aug 2012DC Office, Bangalore Rural
18 Sep 2012in favour of EMBASSY DEVELOPMENTS LIMITED
19 Dec 2024E Khatha · Local panchaytah
1 Acre 8 Guntas
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Consideration ₹3.14 Cr · Sy 59/2, Hegganahalli village, Kundana hobli, Devanahalli taluk · 3 Acres 13 Guntas
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 3 of 12 filed survey numbers matched, 9 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
E Khatha · Local Panchayath · 19 Dec 2024; E Khatha · Local panchayath · 19 Dec 2024; E Khatha · Local panchaytah · 19 Dec 2024
Sale deed
Dated 16 Mar 2005, 26 Apr 2005, 3 May 2005 and 5 more
Sale deed in favour of
EMBASSY DEVELOPMENTS LIMITED
Title deed
Consideration ₹4.0 L
Title deed
Sy 58, Kundana hobli, Devanahalli taluk · 1 Acre
Title deed
Sy 5, Nagamangala village, Kundana hobli, Devanahalli taluk · 31 Guntas; Sy 51/P6, Nagamangala village, Kundana hobli, Devanahalli taluk · 32 Guntas; and 1 more item
The RTC of each filed survey
Sy. No. 58/1
████████
1
3 acres
1 acre
5 acres 34 guntas
Differs: 4 acres 34 guntas apart
Not read yet
Sy. No. 59/2
Not read yet
Not read yet
Sy. No. 59/3P
Not read yet
Not read yet
Sy. No. 93
Not verified yet: Title opinion; Charges on the land; Landowner share of sales; Court-case search; High Court order; Encumbrance certificate, Form 15; Sketch dimensions; Sanctioned plan area; Mutation entry; Share of sales revenue; Joint development agreement.
Fire NOC
KSFES/NOC/264/2025 · issued 8 Sep 2025 · building height 57.35 m
✓Clear
Environmental clearance
SEIAA 70 CON 2021
✓Clear
Airport height NOC
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
30 Jun 2031
Registration certificates
PRM/KA/RERA/1250/303/PR/201125/008263
Land use
Conversion order
Land conversion
12 of 12 parcels converted
Sy 58/1, 99, 112
Converted 16 Jul 2012 · DC Office, Bangalore Rural
Sy 59/2, 109
Converted 10 Aug 2012 · DC Office, Bangalore Rural
Sy 93, 102, 103, 59/3P, 106
Converted 23 Aug 2012 · DC Office, Bangalore Rural
Sy 94, 105
Converted 24 Aug 2012 · DC Office, Bangalore Rural
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 220 kV
Its corridor, to scale
Buried cable
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Estimated cost, architect's and engineer's certificates
₹317.75 Cr
Estimated cost, Form 4 Q2 2026-27
₹382.97 Cr
Cost incurred
₹49.75 Cr (13% of the Form 4 Q2 2026-27 estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (697) 99.3%Unsold (5) 0.7%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
0 / 702 · 702 available
Sold, Q4 2025-26
620 / 702 · 82 available
Sold, Q1 2026-27
696 / 702 · 6 available
Sold, Q2 2026-27
697 / 702 · 5 available
Unsold, Q2 2026-27
5
Sold in Q4 2025-26
620
Sold in Q1 2026-27
76
Sold in Q2 2026-27
1
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · Kasturba Road
Designated account, collected
₹48.17 Cr in Q2 2026-27
Designated account, withdrawn
₹36.31 Cr in Q2 2026-27 (75% of that quarter's deposits)
Track record
DOSL builder track
K-RERA registrations under this promoter
5
Marked completed
0
Past promised date, not completed
0
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class
Through the year
January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several)
Water supply, as filed
Borewell
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot