Visited this project and like the overall theme, location of this project.. this is on the upcoming metro line between Sarjapura to athibele.. will be excellent location for future
Overview
Jrc Kanso
Overview
Jrc Kanso
Overview
Jrc Kanso
Overview
Photo: JRC KansoTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 45/6, 45/7, 45/8, 45/17 and 2 more
Approvals
| Building plan (Anekal Planning Authority) | Sanctioned 12 Mar 2026 · No. CC/1047/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
4BHK · avg 197 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹68.8 L 0.2%Development · ₹290.65 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 12 Mar 2026 | |
| Escrow bank | HDFC · Sarjapur Road-2, Banaglore |
Data room
122 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 6 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 6 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Visited this project and like the overall theme, location of this project.. this is on the upcoming metro line between Sarjapura to athibele.. will be excellent location for future
Amazing location , good architecture, value for price all the villas built on 1500 sft which gives spacious luxury villa
We have seen how well JRC Palladio have been architected, JRC gives high priority to design, less houses, best design, great amenities…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jrc Kanso in the interactive atlas
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Department of Rural Development and Panc · Survey 45/6, 45/7, 45/8, 45/17 and 2 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Anekal Planning Authority · plan CC/1047/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/250526/008679
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of the survey sketch. Filed with K-RERA: JRC KANSO - ADLR Survey Sketch.
| Filed survey numbers matched to the KGIS map | 6 of 6 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,17,665 sq m | |
| Extent the filed land schedule names for these survey numbers | 31,465 sq m | |
| Plot area against the filed extent | 3.74 times | |
| Land area filed with K-RERA | 29,603 sq m | |
| Village, hobli and taluk on the KGIS map | Handhenahalli, SARJAPURA1 hobli, ANEKAL taluk | |
| Mutation entry | None open on 6 of 6 filed surveys |
Satellite map with the 6 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 6 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 45/6, 45/7, 45/8, 45/17, 45/18, 45/19 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,17,665 sq m (the project holds a share) | |
| Land area of this registration | 29,603 sq m | |
| Khata | E Khatha · Department of Rural Development and Panc · 19 Sep 2025 |
| Sy. No. 45/6 | Not read yet | 0 | ||||
| Sy. No. 45/7 | Not read yet | 0 | ||||
| Sy. No. 45/8 | Not read yet | 0 | ||||
| Sy. No. 45/17 | Not read yet | 0 | ||||
| Sy. No. 45/18 | Not read yet | 0 | ||||
| Sy. No. 45/19 | Not read yet |
| Environmental clearance | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 28 Mar 2031 |
| Land conversion | Converted 17 Jan 2025 · Deputy Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 45/6 · 45/7 · 45/8 · 45/17 · 45/18 · 45/19 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Type | Houses | Carpet per house, average (sq ft) |
|---|---|---|
| 4BHK | 122 | 2,122 |
| Mitta Orrin | about 2.5 km | Locked | |
|---|---|---|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 4.5 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 4.5 km | Locked | |
| Mahidhara Harmony | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4.5 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 4.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 4.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 4.5 km | Locked | |
| SOBHA Townpark | about 4.5 km | Locked |
| Jrc Kanso This project | This project is the point the others are measured from | 28 Mar 2031 | – | Not verified yet |
|---|---|---|---|---|
| Mitta Orrin | about 2.5 km | 31 Dec 2027 | 46% (36 of 79) | Locked |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 4.5 km | 31 Dec 2026 | 100% (280 of 280) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 12.5 km, Gunjur | |
|---|---|---|
| Government land in the filed surveys | Sy 45: 7% of the parent survey, 2.03 of 28.94 acres | Review |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 2.00 (244 covered spaces for 122 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 20 Jun 2031 | |
|---|---|---|
| RERA completion date | 28 Mar 2031 | |
| Work began, as filed | 2 May 2026 |
| Building heights, fire NOC | 10 m filed, 6 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Environmental clearance | Filed with the registration | |
|---|---|---|
| Architect's certificate, registration | Dated 14 Apr 2026 · site inspected 13 Apr 2026 | |
| Chartered accountant's certificate, registration | Dated 14 Apr 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹291.34 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹257.66 Cr | |
| Estimated cost, chartered accountant's certificate | ₹291.34 Cr, same as the filing |
| Escrow bank | HDFC · Sarjapur Road-2, Banaglore |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 4.5 km | 30 Sep 2028 | 100% (280 of 280) | Locked |
|---|
| Mahidhara Harmony | about 4.5 km | 10 Sep 2026 | 62% (91 of 146) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4.5 km | 30 Jun 2028 | 100% (261 of 261) | Locked |
|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 4.5 km | 30 Jun 2031 | 47% (230 of 492) | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Houses in them | 3,657 | |
| Booked | 1,457 of 3,657 (40%) | |
| Unsold | 2,200 | |
| Booked a month, pooled | 73 houses | |
| Months to sell, pooled | 29 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 9.5 km, Bommasandra | |
| Metro, under construction | about 16 km, Kadubeesanahalli |
| Kempegowda Airport | 59 | 43 |
| MG Road (CBD) | 37 | 25.5 |
| Manyata Tech Park | 40 | 30.5 |
| ITPL, Whitefield | 25.5 | 19 |
| Ecospace, Bellandur ORR | 21.5 | 16 |
| Electronic City Ph 1 | 19 | 11 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |