Very good experience until now. Entire team is very responsive. Happy to be part of Navami
Overview
Navami Chamara Heights
Overview
Navami Chamara Heights
Overview
Navami Chamara Heights
Overview
Photo: Navami Chamara HeightsTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BBMP) | Sanctioned 19 Jan 2024 · No. BBMP/Addl.Dir/Jdsouth/0030/23-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 1 Jan 2024 | Review |
| Building plan (BBMP) | Sanctioned 19 Jan 2024 | |
| Escrow bank | Karnataka Bank Ltd. · Basaveshwara Nagar |
Data room
183 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Very good experience until now. Entire team is very responsive. Happy to be part of Navami
We had a very positive experience with the Navami Chamara Heights project. The project is well planned, and the entire team was professional, courteous, and transparent throughout the process. The staff patiently answered all my queries and…
I had a great experience with Navami Chamara Heights. The entire process was very transparent, and the team provided clear information at every stage. Booking a flat was smooth and hassle-free, with excellent support from the sales team.…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | 1 | – | Review |
| Abh SamrddhiLapsed · completion date passed | B V TARAKESHWARI | Plot | ~940–1,200 sqft (estimate: filed carpet plus 25%) | Feb 2026 |
| Aprameya PrasiddhiCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Arohana SerenityCompleted (regulator flag) | Nagaraja B | Plot | ~570–1,790 sqft (estimate: filed carpet plus 25%) | Completed |
| Byraveshwara LayoutLapsed · completion date passed | Channappa and Puttalakshmamma | Plot | ~800–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2024 |
| Cm1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 334 sqft carpet (as filed) | Feb 2025 |
| Dmr LegacyRegistered · no quarterly update yet | Individual promoter (named in the filing) | Plot | ~1,390–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| DS Max SamyakActive · 100% built | DS-Max Properties | Apartment | 761–1,078 sqft | Jan 2028 |
| Ds Max SatelliteCompleted · OC 24-04-2020 | DS-MAX PROPERTIES PRIVATE LIMITED | Apartment | – | Completed |
8 of 44 other projects in Kengeri, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Navami Chamara Heights in the interactive atlas
Transfer of the land
Title deed executed
Sy 129, Ullalu village, Yeshwanthpur hobli, Bangalore North taluk; Sy 130
Title deed filed with K-RERA, pp. 1, 13 · See it in Documents
Transfer of the land
Sale deed
in favour of 1 Sri.A.C.Chandrashekar Raju, 2 Sri.A.C Srinivas Raju & 3 Sri.A.C.Krishna Raju · Survey 130
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 130
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 130
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/Jdsouth/0030/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/060324/006678
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 1 Jan 2024 |
|---|
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 11 of the encumbrance certificate. Filed with K-RERA: 1 EC form 2004 to Till date, 11 pages.
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: NCH Survey sketch, 1 page.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 130 | |
|---|---|---|
| Land extent, Sy 130 | 9,055 sq m | |
| Land area of this registration | 9,055 sq m | |
| Khata | A Khatha · BBMP · 3 Jun 2023 | |
| Sale deed | Dated 16 Dec 2013 | |
| Sale deed in favour of | 1 Sri.A.C.Chandrashekar Raju, 2 Sri.A.C Srinivas Raju & 3 Sri.A.C.Krishna Raju |
| Fire NOC (1 of 2) |
|---|
| KSFES/NOC/246/2023 · issued 16 Oct 2023 · building height 69.5 m | Clear |
| Fire NOC (2 of 2) | KSFES/NOC/220/2024 · issued 15 Jul 2024 · building height 97.6 m | Clear |
|---|
| Environmental clearance (1 of 2) | SEIAA 108 CON 2023 · EC identification no. EC23B038KA152156 | Clear |
|---|
| Environmental clearance (2 of 2) | SEIAA 87 CON 2024 · EC identification no. EC24C3801KA5246317N · issued 31 Jan 2025 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 5 Sep 2023 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2028 |
| Land conversion | Converted 28 Nov 2017 · Deputy Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 130 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
2.5 BEDROOM + 2 TOILET (Type 5) · avg 81 m² 16.9%3 BEDROOM + 3 TOILET (Type 4) · avg 99 m² 16.9%3 BEDROOM + 2 TOILET (Type 6) · avg 88 m² 16.9%2 BEDROOM + 2 TOILET (Type 2) · avg 72 m² 16.5%2 other types 32.9%
| 2 BEDROOM + 2 TOILET (Type 2) | 38 | 780 |
| 2.5 BEDROOM + 2 TOILET (Type 5) | 39 | 877 |
| 3 BEDROOM + 2 TOILET (Type 1) | 38 | 946 |
| 3 BEDROOM + 2 TOILET (Type 6) | 39 | 949 |
| 3 BEDROOM + 3 TOILET (Type 3) | 38 | 1,064 |
| 3 BEDROOM + 3 TOILET (Type 4) | 39 | 1,064 |
| Sold, Q2 2026-27 | 204 / 327 | |
|---|---|---|
| Unsold, Q2 2026-27 | 123 | |
| Months to sell, derived from filed bookings | 23 months |
| Sumadhura Pramoda | about 3 km | Locked | |
|---|---|---|---|
| Samaya Sunshine | about 5 km | Locked | |
| Sobha Royal Crest | about 6 km | Locked | |
| Good Earth Ochre | about 7 km | Locked | |
| Birla Tisya | about 7.5 km | Locked | |
| Good Earth Cadence | about 7.5 km | Locked | |
| Garden Square | about 8.5 km | Locked | |
| Song Of Wind | about 9 km | Locked | |
| Adarsh Premia | about 9 km | Locked | |
| Vista Padmalaya | about 9.5 km | Locked | |
| Srivara Vasudha | about 10.5 km | Locked | |
| Jhanavi Trishul Alaska | about 10.5 km | Locked |
| Navami Chamara Heights This project | This project is the point the others are measured from | 30 Jun 2028 | 62% (204 of 327) | Not verified yet |
|---|---|---|---|---|
| Sumadhura Pramoda | about 3 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Samaya Sunshine | about 5 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Sobha Royal Crest | about 6 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Sonnenahalli Bridge Upstream Gollarahatti |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| CCTV Surveillance, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.17 (271 covered spaces for 231 units) | |
| Sewage plant | Sewage treatment plant | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | 50% · planned by 6 Sep 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 12 Jun 2027 | |
| Completion | 40% | |
| Completion, accountant | 34% of the estimated cost spent |
| Possession, agreement | 30 Jun 2028 | |
|---|---|---|
| Schedule end | 31 Aug 2027 | |
| RERA completion date | 30 Jun 2028 | |
| Work began, as filed | 28 Feb 2024 |
| Structure | RCC structure, shear walls | |
|---|---|---|
| Building heights, fire NOC | 69.5 m on the fire NOC |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows (sliding) | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
| Wiring | Fire-resistant copper wiring | |
| Power backup | Power backup in flats: 1 kW | |
| Sewage plant | Sewage treatment plant |
| Structural engineer, quarterly | Form 6 · Jul 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety (1 of 2) | KSFES/NOC/246/2023 · issued 16 Oct 2023 · building height 69.5 m | |
| Fire safety (2 of 2) | KSFES/NOC/220/2024 · issued 15 Jul 2024 · building height 97.6 m | |
| Environmental clearance (1 of 2) | SEIAA 108 CON 2023 · EC identification no. EC23B038KA152156 | |
| Environmental clearance (2 of 2) | SEIAA 87 CON 2024 · EC identification no. EC24C3801KA5246317N · issued 31 Jan 2025 | |
| Architect, quarterly | Form 5 · Jul 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 8 Jul 2026 · site inspected 8 Jul 2026 | |
| Engineer's certificate, registration | Dated 8 Jul 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹39.08 Cr 26.4%Development · ₹109.00 Cr 73.6%
| Estimated cost, at registration | ₹148.08 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹139.07 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹246.56 Cr | |
| Cost incurred | ₹83.85 Cr (34% of the Form 4 Q2 2026-27 estimate) |
Sold (204) 62.4%Unsold (123) 37.6%
| Sold, Q4 2025-26 | 172 / 327 · 155 available | |
|---|---|---|
| Sold, Q1 2026-27 | 183 / 327 · 144 available | |
| Sold, Q2 2026-27 | 204 / 327 · 123 available | |
| Unsold, Q2 2026-27 | 123 | |
| Sold in Q1 2026-27 | 11 | |
| Sold in Q2 2026-27 | 21 | |
| Flats booked, Form 4 Q2 2026-27 | 204 |
| Escrow bank | Karnataka Bank Ltd. · Basaveshwara Nagar | |
|---|---|---|
| Designated account, collected | ₹14.14 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹10.23 Cr in Q2 2026-27 (72% of that quarter's deposits) | |
| Share of collections deposited in escrow | 72% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 Dec 2028 |
| 100% (329 of 329) |
| Locked |
| Good Earth Ochre | about 7 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
|---|
| Birla Tisya | about 7.5 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
|---|
| Good Earth Cadence | about 7.5 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
|---|
| Projects within 4 km, counted | 8 (8 with an approximate location) | |
|---|---|---|
| Flats in them | 1,336 | |
| Booked | 659 of 1,336 (49%) | |
| Unsold | 677 | |
| Booked a month, pooled | 33 flats | |
| Months to sell, pooled | 19 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3 km, Pattanagere | |
| Metro, under construction | about 13 km, Tavarekere |
| Kempegowda Airport | 47.5 | 37 |
| MG Road (CBD) | 17 | 13.5 |
| Manyata Tech Park | 25.5 | 18.5 |
| ITPL, Whitefield | 34.5 | 28 |
| Ecospace, Bellandur ORR | 27.5 | 21.5 |
| Electronic City Ph 1 | 34.5 | 24.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north-east, named Mallathahalli Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 2.5 km to the north-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |