Nvt Mystic Garden Phase 2
Overview
Nvt Mystic Garden Phase 2
Overview
Nvt Mystic Garden Phase 2
Overview
Title & ownership
Approvals
| Building plan (BMRDA) | Sanctioned 6 May 2022 · No. STRRPA/TP/DP/09/2016-17 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Villas ( 4BHK) · avg 177 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 6 May 2022 | |
| Escrow bank | STATE BANK OF INDIA · 384/1 Indiranagar 100 ft Road, HAL 2nd Stage Branch,Bangalore |
Data room
125 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
All 194 projects in Sarjapur → · NVT Quality Lifestyle Projects Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nvt Mystic Garden Phase 2 in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 May 2025 |
| Land conversion | Converted 17 Dec 2021 · District Commissioner, Bangalore Urban,Bangalore | |
|---|---|---|
| Survey numbers | 80/1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Villas | Carpet per villa, average (sq ft) |
|---|---|---|
| Villas ( 4BHK) | 10 | 1,905 |
| Mitta Orrin | about 1 km | Locked | |
|---|---|---|---|
| Shriram 107southeast - Phase 3 | about 3.5 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 3.5 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 3.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 4 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 4 km | Locked | |
| SOBHA Townpark | about 4 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 4.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 4.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 4.5 km | Locked |
| Nvt Mystic Garden Phase 2 This project | This project is the point the others are measured from | 31 May 2025 | – | Not verified yet |
|---|---|---|---|---|
| Mitta Orrin | about 1 km | 31 Dec 2027 | 46% (36 of 79) | Locked |
| Shriram 107southeast - Phase 3 | about 3.5 km | 7 Jan 2027 | 100% (1,055 of 1,055) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 15 km, Doddakannelli |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.50 (15 covered spaces for 10 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 8 Dec 2023 |
|---|
| Possession, agreement | 31 May 2025 | |
|---|---|---|
| Schedule end | 31 Mar 2025 | |
| RERA completion date | 31 May 2025 | |
| Work began, as filed | 1 Jun 2022 |
| Building heights, fire NOC | 6.7 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Aluminium or UPVC windows | |
|---|---|---|
| Flooring | Wooden flooring | |
| Wiring | Concealed copper wiring | |
| Power backup | Provided, 30.5 sq m |
| Architect's certificate, registration | Site inspected 9 Jun 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 11 Jun 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.00 Cr 37.2%Development · ₹8.45 Cr 62.8%
| Estimated cost, at registration | ₹13.45 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹6.00 Cr |
Sold (10) 100%
| Villas sold, at completion | 10 | |
|---|---|---|
| Villas unsold, at completion | 0 | |
| Villas in the phase | 10 |
| Escrow bank | STATE BANK OF INDIA · 384/1 Indiranagar 100 ft Road, HAL 2nd Stage Branch,Bangalore |
|---|
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 6 | |
| Past promised date, not completed | 0 | |
| Other phases under this promoter name | 3 | |
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 5 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 |
|---|
| about 3.5 km |
| 31 Dec 2026 |
| 100% (280 of 280) |
| Locked |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 3.5 km | 30 Sep 2028 | 100% (280 of 280) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4 km | 30 Jun 2028 | 100% (261 of 261) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
|---|
| Projects within 4 km, counted | 23 (23 with an approximate location) | |
|---|---|---|
| Villas in them | 5,497 | |
| Booked | 3,588 of 5,497 (65%) | |
| Unsold | 1,909 | |
| Booked a month, pooled | 78 villas | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 10.5 km, Bommasandra | |
| Metro, under construction | about 18.5 km, Kadubeesanahalli |
| Kempegowda Airport | 62.5 | 46 |
| MG Road (CBD) | 33 | 28 |
| Manyata Tech Park | 43.5 | 33 |
| ITPL, Whitefield | 29 | 22 |
| Ecospace, Bellandur ORR | 31 | 18.5 |
| Electronic City Ph 1 | 15 | 12.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |