Overview
Ozone Urbana
Overview
Ozone Urbana
Overview
Ozone Urbana
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 25 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 25 pages, English.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | SEIAA 95 CON 2015 · issued 25 Feb 2016 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/080315/154170 | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹266.00 Cr 19.8%Development · ₹1080.00 Cr 80.2%
Loan & collateral
| Escrow bank | HDFC · Kasturba Road |
|---|
Data room
55 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ozone Urbana in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 1,24,521 sq m |
|---|
| Pollution board (CFE) |
|---|
| Filed with the registration |
| RERA extensions | Applied for · Applied 7 Sep 2023 | |
|---|---|---|
| RERA completion date | 30 Sep 2023 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Sattva Vasanta Cove | about 0.5 km | Locked |
|---|
| Sattva Vasanta Skye | about 0.5 km | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 1.5 km | Locked |
|---|
| Godrej MSR City | about 2 km | Locked |
|---|
| Barca II At Godrej Msr City | about 2 km | Locked |
|---|
| Varnam Phase 1c | about 2.5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 2.5 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 2.5 km | Locked |
|---|
| Birla Trimaya | about 3 km | Locked |
|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 3 km | Locked |
|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 3 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 3 km | Locked |
|---|
| Ozone Urbana This project | This project is the point the others are measured from | 30 Sep 2023 | – | Not verified yet |
|---|---|---|---|---|
| Sattva Vasanta Cove | about 0.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
| Sattva Vasanta Skye | about 0.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Aeropolis, A Project Of Sattva Group | about 1.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
| Godrej MSR City | about 2 km | 31 Mar 2030 | 100% (1,957 of 1,961) | Locked |
| Barca II At Godrej Msr City | about 2 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
| Varnam Phase 1c | about 2.5 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
| Projects within 4 km, counted | 31 (31 with an approximate location) | |
|---|---|---|
| Flats in them | 15,123 | |
| Booked | 9,705 of 15,123 (64%) | |
| Unsold | 5,418 | |
| Booked a month, pooled | 177 flats | |
| Months to sell, pooled | 31 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 13.5 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Schedule end | 25 Dec 2021 | |
|---|---|---|
| RERA completion date | 30 Sep 2023 | Red flag |
| Work began, as filed | 1 Oct 2013 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | SEIAA 95 CON 2015 · issued 25 Feb 2016 |
| Estimated cost, at registration | ₹1346.00 Cr |
|---|
| Escrow bank | HDFC · Kasturba Road |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 23.5 km, K.R. Puram | |
| Metro, under construction | about 3 km, Doddajala |
| Kempegowda Airport | 12 | 5 |
| MG Road (CBD) | 32 | 27 |
| Manyata Tech Park | 27 | 19 |
| ITPL, Whitefield | 43.5 | 26.5 |
| Ecospace, Bellandur ORR | 47.5 | 32 |
| Electronic City Ph 1 | 51.5 | 41.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1.5 km, named Sadahalli Quarry on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south-east, named BIAL Substation on OpenStreetMap |