Decent budget friendly project and the consultant was very patient in explaining the project details
Overview
Sowparnika Life on the Green
Overview
Sowparnika Life on the Green
Overview
Sowparnika Life on the Green
Overview
Photo: Sowparnika Life On The GreenTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Deputy Commissioner Bangalore · Survey 81
K-RERA filing, land schedule
Approvals
| Building plan (Local Planning Authority) | Sanctioned 3 Dec 2022 · No. STRRPA/TP/LAO/19/16-17 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Mitta Orrin | about 0.5 km |
|---|
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | VISTRA ITCL (INDIA) LIMITED · ₹25.00 Cr disbursed | |
|---|---|---|
| Building plan | Sanctioned 3 Dec 2022 | |
| Escrow bank | HDFC · OLD AIRPORT ROAD |
Data room
161 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Decent budget friendly project and the consultant was very patient in explaining the project details
I purchased this property, but quite disappointed. 1. After purchase they made the society road public, while purchasing they promised it’s for society use only 2. Swimming pool position changed without any prior information, and it’s in…
Souparnika - Life On the Green is a beautifully designed villa project.Harshini from the sales team was very helpful in getting us all the details of the project .She was also prompt in replying to our messages and calls.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | – | 1 | 1 | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
All 194 projects in Sarjapur → · Sowparnika Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sowparnika Life on the Green in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 72/1, 72/2, 88, 80/7
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 72/1, 72/2, 88, 80/7
K-RERA filing, land schedule
Covers 80/7 only
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 72/1, 72/2, 88, 80/7
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Bidaraguppe Grama Panchayathi · Survey 72/1, 72/2, 88, 80/7 and 1 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Bidaraguppe Grama Panchayathi · Survey 72/1, 72/2, 88, 80/7 and 1 more
K-RERA filing, land schedule
Covers 80/7 only
Approval or registration
Khata issued
E Khatha · Bidaraguppe Grama Panchayathi · Survey 72/1, 72/2, 88, 80/7 and 1 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Bidaraguppe Grama Panchayathi · Survey 72/1, 72/2, 88, 80/7 and 1 more
K-RERA filing, land schedule
Covers 80/4 only
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 80/4
K-RERA filing, land schedule
Covers 80/4 only
Approval or registration
Khata issued
E Khatha · Bidaraguppe Grama Panchayathi · Survey 80/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan STRRPA/TP/LAO/19/16-17
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/090523/005925
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | VISTRA ITCL (INDIA) LIMITED · ₹25.00 Cr disbursed |
|---|
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 72/1, 72/2, 88, 80/4, 80/7, 81 | |
|---|---|---|
| Owner kind, Sy 72/1 | Individual | |
| Share as printed, Sy 72/1 | 100 | |
| Owner as printed, Sy 72/1 | ||
| Owner kind, Sy 72/2 | Individual | |
| Share as printed, Sy 72/2 | 100 | |
| Owner as printed, Sy 72/2 | ||
| Owner kind, Sy 88 | Individual | |
| Share as printed, Sy 88 | 100 | |
| Owner as printed, Sy 88 | ||
| Owner kind, Sy 80/4 | Individual |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 9 Apr 2026 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 72/1, 72/2, 88, 80/7 | Converted 11 May 2016 · Deputy Commissioner, Bangalore | |
| Sy 80/4 | Converted 7 Sep 2016 · Deputy Commissioner, Bangalore | |
| Sy 81 | Converted 11 May 2016 · Deputy Commissioner Bangalore | |
| Survey numbers | 72/1 · 72/2 · 88 · 80/4 · 80/7 · 81 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Locked |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 4.5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 4.5 km | Locked |
|---|
| Shriram 107southeast - Phase 3 | about 4.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 4.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 4.5 km | Locked |
|---|
| SOBHA Townpark | 4.8 km | Locked |
|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 5 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 5 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 5 km | Locked |
|---|
| Sowparnika Life on the Green This project | This project is the point the others are measured from | 9 Apr 2026 | – | Not verified yet |
|---|---|---|---|---|
| Mitta Orrin | about 0.5 km | 31 Dec 2027 | 46% (36 of 79) | Locked |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 4.5 km | 31 Dec 2026 | 100% (280 of 280) | Locked |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 4.5 km | 30 Sep 2028 | 100% (280 of 280) | Locked |
| Shriram 107southeast - Phase 3 | about 4.5 km | 7 Jan 2027 | 100% (1,055 of 1,055) | Locked |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4.5 km | 30 Jun 2028 | 100% (261 of 261) | Locked |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4.5 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
| Projects within 4 km, counted | 11 (11 with an approximate location) | |
|---|---|---|
| Villas in them | 2,152 | |
| Booked | 997 of 2,152 (46%) | |
| Unsold | 1,155 | |
| Booked a month, pooled | 25 villas | |
| Months to sell, pooled | 44 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Parks & open space, at the filed pin | Review |
|---|---|---|
| Nearest government-flagged flood location | 14.5 km, Gunjur |
| Nearest storm drain | 100 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 30 m to the west, an unnamed tank |
As the promoter reported it

| Completion | 100% | |
|---|---|---|
| Completion, accountant | 100% of the estimated cost spent |
| RERA completion date | 9 Apr 2026 | Review |
|---|---|---|
| Work began, as filed | 10 Apr 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, May 2026 (3 filed) | Clear |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹31.68 Cr 52.9%Development · ₹28.15 Cr 47.1%
| Estimated cost, at registration | ₹59.83 Cr | |
|---|---|---|
| Cost incurred | ₹59.83 Cr (100% of the estimate) | |
| Cost left | ₹0 | |
| Receivable, sold villas | ₹0 |
| Escrow bank | HDFC · OLD AIRPORT ROAD | |
|---|---|---|
| Designated account, collected | ₹0 in Q1 2026-27 | |
| Designated account, withdrawn | ₹0 in Q1 2026-27 | |
| Net amount withdrawable, Form 4 | ₹15,76,45,002 |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 0 |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Share as printed, Sy 80/4 | 100 |
|---|
| Owner as printed, Sy 80/4 |
|---|
| Owner kind, Sy 80/7 | Individual |
|---|
| Share as printed, Sy 80/7 | 100 |
|---|
| Owner as printed, Sy 80/7 |
|---|
| Owner kind, Sy 81 | Individual |
|---|
| Share as printed, Sy 81 | 100 |
|---|
| Owner as printed, Sy 81 |
|---|
| Khata | E Khatha · Bidaraguppe Grama Panchayathi · 21 Jun 2016; E Khatha · Bidaraguppe Grama Panchayathi · 3 Nov 2016 |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 12.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 100 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 862 m above sea level, plus or minus 4 m | |
| Metro, operational | 10.8 km, Bommasandra | |
| Metro, under construction | 18.0 km, Kadubeesanahalli |
| Kempegowda Airport | 61.4 | 69 | 45.1 |
| MG Road (CBD) | 34.3 | 41 | 27.9 |
| Manyata Tech Park | 44.9 | 51 | 32.6 |
| ITPL, Whitefield | 28.1 | 38 | 21.2 |
| Ecospace, Bellandur ORR | 24.2 | 37 | 18.0 |
| Electronic City Ph 1 | 16.5 | 19 | 12.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |