Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Bhavisha MeadowsLapsed · completion date passed | BHAVISHA PROPERTIES | Apartment | – | Mar 2023 |
| CelestaCompleted · OC 04-03-2023 | GLOBAL EDIFICE BUILDERS | Apartment | 370–724 sqft carpet (as filed) | Completed |
| Dhiraan Urban ForestCompleted · OC 18-04-2024 | DHIRAAN INFRASTRUCTURE PVT LTD | Apartment | 460–970 sqft carpet (as filed) | Completed |
| Fortuners Infra ElixirRegistered · no quarterly update yet | FORTUNERS INFRA | Apartment | 418–864 sqft carpet (as filed) | Sep 2026 |
| Green AppleCompleted (regulator flag) | GLOBAL EDIFICE DEVELOPERS AND BUILDERS | Plot | – | Completed |
| Green Apple HikesCompleted · OC 27-01-2021 | GLOBAL EDIFICE DEVELOPERS AND BUILDERS | Apartment | 872 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Green VistaCompleted (regulator flag) | BEST PROPERTIES | Plot | – | Completed |
| High Classic DelightCompleted (regulator flag) | M/s HIGH CLASSIC BUILDERS AND DEVELOPERS | Plot | ~1,130–1,200 sqft (estimate: filed carpet plus 25%) | Completed |
8 of 23 other projects in Chandapura, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sreevari Gokulam in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Signature Heights | about 1.5 km | Locked |
|---|
| Shriram Sapphire (Codename Ultimate) | about 3 km | Locked |
|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 3 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 3 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 3 km | Locked |
|---|
| Mahidhara Harmony | about 3.5 km | Locked |
|---|
| Sowmya Skyla | about 3.5 km | Locked |
|---|
| Abhee Serenity Springs | about 3.5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 3.5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 3.5 km | Locked |
|---|
| SOBHA Townpark | about 4 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4 km | Locked |
|---|
| Sreevari Gokulam This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Signature Heights | about 1.5 km | 31 Oct 2028 | 51% (178 of 346) | Locked |
| Shriram Sapphire (Codename Ultimate) | about 3 km | 5 Nov 2028 | 100% (414 of 414) | Locked |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 3 km | 30 Jun 2031 | 47% (230 of 492) | Locked |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 3 km | 31 Dec 2030 | 73% (348 of 480) | Locked |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 3 km | 31 Dec 2032 | 84% (540 of 640) | Locked |
| Mahidhara Harmony | about 3.5 km | 10 Sep 2026 | 62% (91 of 146) | Locked |
| Projects within 4 km, counted | 35 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 15,671 | |
| Booked | 5,796 of 15,671 (37%) | |
| Unsold | 9,875 | |
| Booked a month, pooled | 47 flats | |
| Months to sell, pooled | 210 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 9.5 km, G K LAYOUT |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Lakshmisagara Kere |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 3.5 km, Bommasandra | |
| Metro, under construction | about 14 km, Ibbalur |
| Kempegowda Airport | 60.5 | 43.5 |
| MG Road (CBD) | 26.5 | 22.5 |
| Manyata Tech Park | 37 | 28.5 |
| ITPL, Whitefield | 27 | 20 |
| Ecospace, Bellandur ORR | 24.5 | 13.5 |
| Electronic City Ph 1 | 8.5 | 5.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Chandapura on OpenStreetMap |