Overview
Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BIAPPA) | Sanctioned 3 Aug 2026 · No. BIAPPA/TP/CC/78/2026-27/1434 | |
|---|---|---|
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 12 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 397 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sreeyan Sorin in the interactive atlas
Approval or registration
Land use converted
DC, Bengaluru Rural · Survey 128/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 128/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Gram Panchayat · Survey 128/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAPPA/TP/CC/78/2026-27/1434
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/051126/009083
K-RERA registration
Approval or registrationTransfer of the landThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 128/3 | |
|---|---|---|
| Land extent, Sy 128/3 | 1 Acre, 3 Gunta | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,350 sq m | |
| Khata | A Khatha · Gram Panchayat · 4 Apr 2026 | |
| Sale deed | Dated 29 May 2025 | |
| Power NOC (BESCOM) |
|---|
| Filed with the registration |
| Fire department | Filed with the registration |
|---|
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 10 Dec 2029 |
| Land conversion | Converted 4 Feb 2021 · DC, Bengaluru Rural | |
|---|---|---|
| Survey numbers | 128/3 |
3BHK · avg 70 m² 66.7%2BHK · avg 54 m² 33.3%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 24 | 578 |
| 3BHK | 48 | 757 |
| Sattva Vasanta Skye | about 1 km | Locked | |
|---|---|---|---|
| Sattva Vasanta Cove | about 1 km | Locked | |
| Godrej MSR City | about 1.5 km | Locked | |
| Barca II At Godrej Msr City | about 2 km | Locked | |
| Aeropolis, A Project Of Sattva Group |
| Sreeyan Sorin This project | This project is the point the others are measured from | 10 Dec 2029 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sattva Vasanta Skye | about 1 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Sattva Vasanta Cove | about 1 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 12.5 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 3 km to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.11 (80 covered spaces for 72 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 10 Dec 2029 | |
| RERA completion date | 10 Dec 2029 | |
| Work began, as filed | 5 Aug 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed, 2 towers | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
Land · ₹10.88 Cr 24.4%Development · ₹33.70 Cr 75.6%
| Estimated cost, at registration | ₹44.58 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Sector A Yelahanka | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BIAPPA) | Sanctioned 3 Aug 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Sector A Yelahanka | |
| about 2.5 km |
| Locked |
| Varnam Phase 1c | about 3 km | Locked |
|---|
| Sattva City | about 3 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 3 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 3 km | Locked |
|---|
| Birla Trimaya | about 3.5 km | Locked |
|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4 km | Locked |
|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 4 km | Locked |
|---|
| Godrej MSR City |
|---|
| about 1.5 km |
| 31 Mar 2030 |
| 100% (1,957 of 1,961) |
| Locked |
| Barca II At Godrej Msr City | about 2 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 2.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Varnam Phase 1c | about 3 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
|---|
| Projects within 4 km, counted | 35 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 18,996 | |
| Booked | 13,172 of 18,996 (69%) | |
| Unsold | 5,824 | |
| Booked a month, pooled | 293 flats | |
| Months to sell, pooled | 19 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 3 km to the south-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 2.5 km, Doddajala | |
| Kempegowda Airport | 6.5 |
| MG Road (CBD) | 26.5 |
| Manyata Tech Park | 18.5 |
| ITPL, Whitefield | 26.5 |
| Ecospace, Bellandur ORR | 32 |
| Electronic City Ph 1 | 41.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 0.5 km, named Sadahalli Quarry on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |