Photo: SSVD DIVINETitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 2 Feb 2022 · No. BBMP/Ad.com./RJH/1934/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 70 m² 60%3BHK · avg 88 m² 40%
Location & risks
Construction & progress
Developer
Land · ₹9.00 Cr 35.5%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 2 Feb 2022 | |
| Escrow bank | STATE BANK OF INDIA · BASAVANAGIDI |
Data room
122 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Don't worry about Google map(90% right data) and Google forecast(90% wrong). It Wil always show 80%wrong data
Very good building with decent community
This is a hidden bidding place, not a healthy business place... had finalized a flat amongst 4 options in same floor, before finalized sales man said 2 more customers are on same price, finally decided to book with same price and told will…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Abh SamrddhiLapsed · completion date passed | B V TARAKESHWARI | Plot | ~940–1,200 sqft (estimate: filed carpet plus 25%) | Feb 2026 |
| Aprameya PrasiddhiCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Arohana SerenityCompleted (regulator flag) | Nagaraja B | Plot | ~570–1,790 sqft (estimate: filed carpet plus 25%) | Completed |
| Byraveshwara LayoutLapsed · completion date passed | Channappa and Puttalakshmamma | Plot | ~800–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2024 |
| Cm1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 334 sqft carpet (as filed) | Feb 2025 |
| Dmr LegacyRegistered · no quarterly update yet | Individual promoter (named in the filing) | Plot | ~1,390–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| DS Max SamyakActive · 100% built | DS-Max Properties | Apartment | 761–1,078 sqft | Jan 2028 |
| Ds Max SatelliteCompleted · OC 24-04-2020 | DS-MAX PROPERTIES PRIVATE LIMITED | Apartment | – | Completed |
8 of 44 other projects in Kengeri, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ssvd Divine in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 17 Mar 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Aug 2024 |
| Land conversion | Converted 22 Sep 1988 · BDA | |
|---|---|---|
| Survey numbers | 4777/988/987/986/985/982/983/9 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 36 | 753 |
| 3BHK | 24 | 952 |
| Sumadhura Pramoda | about 2.5 km | Locked | |
|---|---|---|---|
| Samaya Sunshine | about 3 km | Locked | |
| Good Earth Ochre | about 5 km | Locked | |
| Sobha Royal Crest | about 5 km | Locked | |
| Good Earth Cadence | about 5.5 km | Locked | |
| Garden Square | about 7 km | Locked | |
| Song Of Wind | about 7.5 km | Locked | |
| Birla Tisya | about 8.5 km | Locked | |
| Adarsh Premia | about 8.5 km | Locked | |
| Jhanavi Trishul Alaska | about 8.5 km | Locked | |
| Srivara Vasudha | about 9 km | Locked | |
| Mahindra Eden Phase-2 | about 9 km | Locked |
| Ssvd Divine This project | This project is the point the others are measured from | 31 Aug 2024 | – | Not verified yet |
|---|---|---|---|---|
| Sumadhura Pramoda | about 2.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Samaya Sunshine | about 3 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Good Earth Ochre | about 5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, Sonnenahalli Bridge Upstream Gollarahatti |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Gandhi Niagara Hosa Here |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 0.90 (54 covered spaces for 60 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 31 Aug 2024 | |
|---|---|---|
| Schedule end | 31 Aug 2024 | |
| RERA completion date | 31 Aug 2024 | Red flag |
| Work began, as filed | 1 Apr 2022 |
| Building heights, fire NOC | 11.48 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 1 sq m |
|---|
| Architect's certificate, registration | Dated 5 May 2022 · site inspected 25 Apr 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 5 May 2022 | |
| Chartered accountant's certificate, registration | Dated 12 Apr 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹25.33 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹12.33 Cr | |
| Estimated cost, chartered accountant's certificate | ₹25.33 Cr, same as the filing |
| Escrow bank | STATE BANK OF INDIA · BASAVANAGIDI |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 Oct 2027 |
| 92% (35 of 38) |
| Locked |
| Sobha Royal Crest | about 5 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Good Earth Cadence | about 5.5 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
|---|
| Garden Square | about 7 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 3,202 | |
| Booked | 2,009 of 3,202 (63%) | |
| Unsold | 1,193 | |
| Booked a month, pooled | 59 flats | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 1.5 km, Kengeri Bus Terminal | |
| Metro, under construction | about 12.5 km, Tavarekere |
| Kempegowda Airport | 49.5 | 38.5 |
| MG Road (CBD) | 16.5 | 13.5 |
| Manyata Tech Park | 27 | 19.5 |
| ITPL, Whitefield | 33.5 | 28 |
| Ecospace, Bellandur ORR | 27 | 21 |
| Electronic City Ph 1 | 31.5 | 23 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Mailasandra Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1.5 km, named Hindu Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Kengeri S Town on OpenStreetMap |