Overview
Suraksha Sunrise Park
Overview
Suraksha Sunrise Park
Overview
Suraksha Sunrise Park
Overview
Photo: Shashi KiranTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 28 Oct 2024 · No. 120/2024-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2 BHK and 3 BHK · avg 75 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 28 Oct 2024 | |
| Escrow bank | HDFC · JAYANAGAR |
Data room
106 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Suraksha Sunrise Park in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Mar 2028 |
| Land conversion | Converted 30 Jan 2024 · Deputy Commissioner's Office | |
|---|---|---|
| Survey numbers | 330/1, 330/4, 330/5, 330/6 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 BHK and 3 BHK | 40 | 805 |
| Sold, Q2 2026-27 | 0 / 40 | |
|---|---|---|
| Unsold, Q2 2026-27 | 40 |
| Mitta Orrin | about 1.5 km | Locked | |
|---|---|---|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 4.5 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 4.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 4.5 km | Locked | |
| SOBHA Townpark | about 5 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 5 km | Locked | |
| Shriram 107southeast - Phase 3 | about 5 km | Locked |
| Suraksha Sunrise Park This project | This project is the point the others are measured from | 30 Mar 2028 | 0% (0 of 40) | Not verified yet |
|---|---|---|---|---|
| Mitta Orrin | about 1.5 km | 31 Dec 2027 | 46% (36 of 79) | Locked |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 4.5 km | 31 Dec 2026 | 100% (280 of 280) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 13 km, Gunjur |
|---|
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance | |
|---|---|---|
| Electricity, built | 0% | |
| Covered parking per unit | 1.13 (45 covered spaces for 40 units) | |
| Power backup | Not declared |
As the promoter reported it

| Main structure | 100% · planned by 31 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Mar 2027 | |
| Completion | 67% |
| Schedule end | 30 Dec 2027 | |
|---|---|---|
| RERA completion date | 30 Mar 2028 | |
| Work began, as filed | 1 Apr 2025 |
| Building heights, fire NOC | 14.55 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Site inspected 30 Jan 2025 | |
| Engineer's certificate, registration | Dated 30 Jan 2025 | |
| Chartered accountant, Form 4 | Dated 14 Jul 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹59.6 L 3.7%Development · ₹15.58 Cr 96.3%
| Estimated cost, at registration | ₹16.18 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹12.50 Cr | |
| Receivable, sold flats | ₹0 |
Unsold (40) 100%
| Sold, Q3 2025-26 | 0 / 40 · 40 available | |
|---|---|---|
| Sold, Q4 2025-26 | 0 / 40 · 40 available | |
| Sold, Q1 2026-27 | 0 / 40 · 40 available | |
| Sold, Q2 2026-27 | 0 / 40 · 40 available | |
| Unsold, Q2 2026-27 | 40 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | HDFC · JAYANAGAR | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 4.5 km | 30 Sep 2028 | 100% (280 of 280) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 4.5 km | 30 Jun 2028 | 100% (261 of 261) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 4.5 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 4.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Projects within 4 km, counted | 15 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 3,136 | |
| Booked | 1,519 of 3,136 (48%) | |
| Unsold | 1,617 | |
| Booked a month, pooled | 42 flats | |
| Months to sell, pooled | 37 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 10 km, Bommasandra | |
| Metro, under construction | about 16.5 km, Kadubeesanahalli |
| Kempegowda Airport | 58.5 | 44 |
| MG Road (CBD) | 35.5 | 26.5 |
| Manyata Tech Park | 46 | 31 |
| ITPL, Whitefield | 25 | 20 |
| Ecospace, Bellandur ORR | 24.5 | 16.5 |
| Electronic City Ph 1 | 18 | 11.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |