Overview
Aster
Overview
Aster
Overview
Aster
Overview
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map centred on the village the filing names, approximate: village level. The filing names only the village. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed village; basemap © OpenStreetMap contributors
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 294 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Aster is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 2.5 km, to a locality centre | Locked |
|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 2.5 km, to a locality centre | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 2.5 km, to a locality centre | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 4.5 km, to a locality centre | Locked |
|---|
| Sattva Vasanta Cove | about 6 km, to a locality centre | Locked |
|---|
| Sattva Vasanta Skye | about 6 km, to a locality centre | Locked |
|---|
| Varnam Phase 1c | about 6.5 km, to a locality centre | Locked |
|---|
| Birla Trimaya Phase-3 | about 6.5 km, to a locality centre | Locked |
|---|
| Birla Trimaya | about 7 km, to a locality centre | Locked |
|---|
| Birla Trimaya Phase-2 | about 7 km, to a locality centre | Locked |
|---|
| Godrej MSR City | about 7 km, to a locality centre | Locked |
|---|
| Barca II At Godrej Msr City | about 7 km, to a locality centre | Locked |
|---|
| Aster This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 2.5 km, to a locality centre | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 2.5 km, to a locality centre | 30 Jun 2027 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 2.5 km, to a locality centre | 31 Dec 2027 | 100% (20 of 20) | Locked |
| Aeropolis, A Project Of Sattva Group | about 4.5 km, to a locality centre | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
| Sattva Vasanta Cove | about 6 km, to a locality centre | 27 Dec 2030 | 14% (28 of 200) | Locked |
| Sattva Vasanta Skye | about 6 km, to a locality centre | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Nearest storm drain |
|---|
| about 1 km from the locality centre, tertiary drain |
| Nearest lake, tank or pond | about 0.5 km from the locality centre, an unnamed water body |
|---|
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | None within 3 km of the locality centre | |
| Quarry | about 1.5 km from the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 3 km from the locality centre |
Map centred on the village the filing names, approximate: village level. The filing names only the village. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed village; basemap © OpenStreetMap contributors
| Nearest drain | about 1 km from the locality centre, tertiary drain |
|---|