Photo: Kumar PalazzioTitle & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
4BHK · avg 358 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 7 Aug 2025 | |
| Escrow bank | ICICI Bank · Vasanthapura Main Road, Bengaluru |
Data room
112 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Kumar Palazzio in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 7 Aug 2025 · No. DHL-LBPAS-10961/25-26/BP | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-128075 · issued 16 Jul 2024 · valid until 31 Dec 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2030 |
| Land conversion | Converted 12 Jan 2001 · District Commissioner Office Bengaluru Rural | |
|---|---|---|
| Survey numbers | 26/1 · 26/3 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Houses | Carpet per house, average (sq ft) |
|---|---|---|
| 4BHK | 29 | 3,853 |
| Sold, Q2 2026-27 | 3 / 29 | |
|---|---|---|
| Unsold, Q2 2026-27 | 26 | |
| Months to sell, derived from filed bookings | Too few bookings to project (3 houses booked in 9 months) |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 6 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 6 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 6 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 8 km | Locked | |
| Sattva Vasanta Cove | about 9.5 km | Locked | |
| Sattva Vasanta Skye | about 9.5 km | Locked | |
| Varnam Phase 1c | about 10 km | Locked | |
| Birla Trimaya Phase-3 | about 10.5 km | Locked | |
| Birla Trimaya | about 10.5 km | Locked | |
| Godrej MSR City | about 10.5 km | Locked | |
| Birla Trimaya Phase-2 | about 10.5 km | Locked | |
| Barca II At Godrej Msr City | about 10.5 km | Locked |
| Kumar Palazzio This project | This project is the point the others are measured from | 31 Mar 2030 | 10% (3 of 29) | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 6 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 6 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 38% Residential (main), 30% Agriculture, 23% Transport & communication, 9% Parks & open space, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 22 km, Shankrappa Layout, MAruthi nagar | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 4.00 (116 covered spaces for 29 units) | |
| Power backup | Not declared |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 24 Jul 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 18 Mar 2029 | |
| Completion | 11% | |
| Completion, accountant | 17.9% of the estimated cost spent |
| Possession, agreement | 31 Mar 2030 | |
|---|---|---|
| Schedule end | 31 Mar 2030 | |
| RERA completion date | 31 Mar 2030 | |
| Completion date, agreement | 31 Mar 2030 | |
| Work began, as filed | 25 Nov 2025 |
| Building heights, fire NOC | 11.25 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 17 Oct 2025 · site inspected 20 Aug 2025 | |
| Engineer's certificate, registration | Dated 20 Aug 2025 | |
| Chartered accountant's certificate, registration | Dated 22 Nov 2025 | |
| Chartered accountant, Form 4 | Dated 10 Oct 2026 | |
| Architect's quarterly progress certificate | 11% complete per the architect, as of 12 Oct 2026 | |
| Architect's quarterly progress certificate dated | 12 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 30 Sep 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹9.24 Cr 8.2%Development · ₹103.24 Cr 91.8%
| Estimated cost, at registration | ₹112.48 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹90.00 Cr | |
| Estimated cost, chartered accountant's certificate | ₹112.48 Cr, same as the filing | |
| Cost incurred | ₹20.08 Cr (17.9% of the estimate) |
Sold (3) 10.3%Unsold (26) 89.7%
| Sold, Q3 2025-26 | 0 / 29 · 29 available | |
|---|---|---|
| Sold, Q4 2025-26 | 2 / 29 · 27 available | |
| Sold, Q1 2026-27 | 2 / 29 · 27 available | |
| Sold, Q2 2026-27 | 3 / 29 · 26 available | |
| Unsold, Q2 2026-27 | 26 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 1 | |
| 4 BHK, sold | 3 / 29 |
| Escrow bank | ICICI Bank · Vasanthapura Main Road, Bengaluru | |
|---|---|---|
| Designated account, collected | ₹50.0 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹35.0 L in Q2 2026-27 (70% of that quarter's deposits) | |
| Share of collections deposited in escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 6 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 8 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Sattva Vasanta Cove | about 9.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Sattva Vasanta Skye | about 9.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Projects within 4 km, counted | 6 (6 with an approximate location) | |
|---|---|---|
| Houses in them | 2,357 | |
| Booked | 1,710 of 2,357 (73%) | |
| Unsold | 647 | |
| Booked a month, pooled | 32 houses | |
| Months to sell, pooled | 14 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 30 km, K.R. Puram | |
| Metro, under construction | about 8 km, KIA Terminal |
| Kempegowda Airport | 13.5 | 8 |
| MG Road (CBD) | 39 | 35 |
| Manyata Tech Park | 34 | 27 |
| ITPL, Whitefield | 43 | 31.5 |
| Ecospace, Bellandur ORR | 53.5 | 38.5 |
| Electronic City Ph 1 | 58.5 | 48 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 3 km to the south-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |