Building plan (BIAPPA)Sanctioned 27 Jun 2025No. DP - BIAAPA/TP/LAO/DP/116/2023-24/24-25/1088, VP - BIAAPA/TP/CC/DP/36/2025-26/447
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 7 of 7 parcelsDates and authorities below
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
4BHK · avg 217 m² 52.6%3BHK · avg 141 m²
Location & risks
What is the location like?
Review1 to review
Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedLocal authority (VILLAGE PANCHAYATH)Declared by the promoter
Metro, operationalabout 26 kmK.R. Puram
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion16%As of Q2 2026-27, promoter's return
Possession, agreement31 Mar 2030Agreement for sale, p. 15
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Review1 to review
Sold14 / 76As of Q2 2026-27
Sold in Q2 2026-270!ReviewReview
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanADITYA BIRLA HOUSING FINANCE LIMITED · ₹50.00 Cr disbursedAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
ADITYA BIRLA HOUSING FINANCE LIMITED · ₹50.00 Cr disbursed
Building plan (BIAPPA)
Sanctioned 27 Jun 2025
Escrow bank
HDFC · NO. 60, MEERA SADAN, 1st MAIN ROAD, SESHADRIPURAM
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
190 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 2 of 7 filed survey numbers matched, 5 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Dont buy, they will delay for forever, just search merusri and read review of other projects.
Ssanyam kawatra19 Jul 2026★★★★★
If you're considering Merusri Sunscape, I strongly recommend visiting Merusri Sunlit Grove first. I am a buyer in Sunlit Grove. The project has faced repeated delays, promised timelines have been missed, and completion has taken far longer…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Merusri Sunscape in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765 and 400 kV
Its corridor, to scale
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Internal roads; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per villa; Sewage plant; Design consultants (Form 6); Fire safety; Environmental clearance.
Land · ₹10.00 Cr 12.5%Development · ₹70.00 Cr 87.5%
Form 4
Estimated cost, at registration
₹80.00 Cr
Estimated cost, architect's certificate
₹70.00 Cr
Estimated cost, Form 4 Q2 2026-27
₹98.00 Cr
Cost incurred
₹15.11 Cr (15.4% of the Form 4 Q2 2026-27 estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (14) 18.4%Unsold (62) 81.6%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
3 / 76 · 73 available
Sold, Q4 2025-26
4 / 76 · 72 available
Sold, Q1 2026-27
14 / 76 · 62 available
Sold, Q2 2026-27
14 / 76 · 62 available
Unsold, Q2 2026-27
62
Sold in Q4 2025-26
1
Sold in Q1 2026-27
10
Sold in Q2 2026-27
0
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · NO. 60, MEERA SADAN, 1st MAIN ROAD, SESHADRIPURAM
Designated account, collected
₹2.98 Cr in Q2 2026-27
Designated account, withdrawn
₹3.09 Cr in Q2 2026-27
Amount withdrawable, Form 4
₹15,68,00,000
Net amount withdrawable, Form 4
₹12,58,82,411
Withdrawn from the escrow account to date
₹3,09,17,589
Not verified yet: Receivable, sold villas; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class
Through the year
January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several)
Water supply, as filed
Local authority (VILLAGE PANCHAYATH)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot