Visted a relative here, and the experience was amazing. The infinity pool and the Kempegowda airport view are absolutely stunning. It's the perfect escape from the city's traffic.
Overview
MVN Aero One Phase 1
Part ofMVN Aero One3 phases, 350 flats
Overview
MVN Aero One Phase 1
Part ofMVN Aero One3 phases, 350 flats
Overview
MVN Aero One Phase 1
Part ofMVN Aero One3 phases, 350 flats
Overview
Part ofMVN Aero One3 phases, 350 flats
Photo: MVN Aero OneTitle & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹11.00 Cr 15.7%Development · ₹59.00 Cr 84.3%
Loan & collateral
| Escrow bank | HDFC · DEVANHALLI |
|---|
Data room
89 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Visted a relative here, and the experience was amazing. The infinity pool and the Kempegowda airport view are absolutely stunning. It's the perfect escape from the city's traffic.
Marvelous luxury project very detailing on every inch. First time, I see terrace swimming pool. Amazing. Booked 2 flats. Slow progress since my last visit. overall they are making like it printed in brochure. I was shocked when they say…
My sister travelling via this road thought it's star hotel but she was told by cab driver it's apartment. She ask me persue about the project. I was stunned to see their high rise pool and high rise amentities first of it's kind in…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
All 308 projects in Devanahalli → · Mf Farmlands Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open MVN Aero One Phase 1 in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | KSFES/NOC/164/2020 · issued 18 Sep 2020 | Clear |
| Environmental clearance | SEIAA 160 CON 2019 · issued 12 Feb 2020 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/011018/273631 · issued 31 Jan 2018 · permissible top elevation 940.42 m above mean sea level · validity ended 30 Jan 2026 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | Applied for · Applied 2 Nov 2026 | |
|---|---|---|
| RERA completion date | 31 Jul 2025 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4.5 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 4.5 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 4.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 5 km | Locked | |
| Varnam Phase 1c | about 6.5 km | Locked | |
| Birla Trimaya | about 6.5 km | Locked | |
| Birla Trimaya Phase-3 | 6.6 km | Locked | |
| Sattva Vasanta Cove | 6.7 km | Locked | |
| Birla Trimaya Phase-2 | about 7 km | Locked | |
| Sattva Vasanta Skye | 6.9 km | Locked | |
| Barca II At Godrej Msr City | about 7.5 km | Locked | |
| Godrej MSR City | 7.6 km | Locked |
| MVN Aero One Phase 1 This project | This project is the point the others are measured from | 31 Jul 2025 | – | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 4.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 4.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
| Aeropolis, A Project Of Sattva Group | about 5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
| Varnam Phase 1c | about 6.5 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
| Birla Trimaya | about 6.5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
| Rent, 2BHK, 3 km | ₹24,500 /mo · 6 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹21.5 /mo, as listed · 6 listings with a size |
| Projects within 4 km, counted | 13 (5 with an approximate location) | |
|---|---|---|
| Flats in them | 3,352 | |
| Booked | 2,152 of 3,352 (64%) | |
| Unsold | 1,200 | |
| Booked a month, pooled | 45 flats | |
| Months to sell, pooled | 22 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest government-flagged flood location | 18.1 km, Shankrappa Layout, MAruthi nagar |
| Nearest storm drain | 1.0 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 110 m to the south-east, an unnamed water body |
| Schedule end | 31 May 2025 | |
|---|---|---|
| RERA completion date | 31 Jul 2025 | Red flag |
| Work began, as filed | 1 Feb 2021 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | KSFES/NOC/164/2020 · issued 18 Sep 2020 | |
|---|---|---|
| Environmental clearance | SEIAA 160 CON 2019 · issued 12 Feb 2020 |
| Estimated cost, at registration | ₹70.00 Cr |
|---|
| Escrow bank | HDFC · DEVANHALLI |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 13.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.0 km to the south, tertiary drain | |
|---|---|---|
| Ground level | 881 m above sea level, plus or minus 4 m | |
| Metro, operational | 25.1 km, K.R. Puram | |
| Metro, under construction | 2.9 km, KIA Terminal |
| Kempegowda Airport | 11.3 | 16 | 3.0 |
| MG Road (CBD) | 39.3 | 39 | 30.3 |
| Manyata Tech Park | 34.4 | 35 | 22.5 |
| ITPL, Whitefield | 35.1 | 35 | 26.4 |
| Ecospace, Bellandur ORR | 42.9 | 47 | 33.3 |
| Electronic City Ph 1 | 58.2 | 59 | 42.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.6 km to the south-east | |
| Quarry | 2.4 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.5 km to the south-west |