Visted a relative here, and the experience was amazing. The infinity pool and the Kempegowda airport view are absolutely stunning. It's the perfect escape from the city's traffic.
Overview
Mvn Aero One Phase I
Overview
Mvn Aero One Phase I
Overview
Mvn Aero One Phase I
Overview
Photo: MVN Aero OneVisted a relative here, and the experience was amazing. The infinity pool and the Kempegowda airport view are absolutely stunning. It's the perfect escape from the city's traffic.
Marvelous luxury project very detailing on every inch. First time, I see terrace swimming pool. Amazing. Booked 2 flats. Slow progress since my last visit. overall they are making like it printed in brochure. I was shocked when they say…
My sister travelling via this road thought it's star hotel but she was told by cab driver it's apartment. She ask me persue about the project. I was stunned to see their high rise pool and high rise amentities first of it's kind in…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 294 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mvn Aero One Phase I in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4.5 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 4.5 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 4.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 5 km | Locked | |
| Varnam Phase 1c | about 6.5 km | Locked | |
| Birla Trimaya | about 6.5 km | Locked | |
| Birla Trimaya Phase-3 | 6.6 km | Locked | |
| Sattva Vasanta Cove | 6.7 km | Locked | |
| Birla Trimaya Phase-2 | about 7 km | Locked | |
| Sattva Vasanta Skye | 6.9 km | Locked | |
| Barca II At Godrej Msr City | about 7.5 km | Locked | |
| Godrej MSR City | 7.6 km | Locked |
| Mvn Aero One Phase I This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 4.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 4.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
| Aeropolis, A Project Of Sattva Group | about 5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
| Varnam Phase 1c | about 6.5 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
| Birla Trimaya | about 6.5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
| Rent, 2BHK, 3 km | ₹24,500 /mo · 6 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹21.5 /mo, as listed · 6 listings with a size |
| Projects within 4 km, counted | 13 (5 with an approximate location) | |
|---|---|---|
| Flats in them | 3,352 | |
| Booked | 2,152 of 3,352 (64%) | |
| Unsold | 1,200 | |
| Booked a month, pooled | 45 flats | |
| Months to sell, pooled | 22 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest government-flagged flood location | 18.1 km, Shankrappa Layout, MAruthi nagar |
| Nearest storm drain | 1.0 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 120 m to the south-east, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Nearest city water main | 13.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.0 km to the south, tertiary drain | |
|---|---|---|
| Ground level | 881 m above sea level, plus or minus 4 m | |
| Metro, operational | 25.1 km, K.R. Puram | |
| Metro, under construction | 2.9 km, KIA Terminal |
| Kempegowda Airport | 11.2 | 16 | 3.0 |
| MG Road (CBD) | 39.3 | 39 | 30.3 |
| Manyata Tech Park | 34.4 | 35 | 22.5 |
| ITPL, Whitefield | 35.2 | 35 | 26.5 |
| Ecospace, Bellandur ORR | 42.9 | 47 | 33.3 |
| Electronic City Ph 1 | 58.2 | 59 | 42.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.6 km to the south-east | |
| Quarry | 2.4 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.5 km to the south-west |