Overview
Surya Serene Skyline
Overview
Surya Serene Skyline
Overview
Surya Serene Skyline
Overview

Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2 BHK & 3 BHK Units · avg 79 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | Aditya Birla Housing Finance Ltd · ₹30.00 Cr disbursed | |
|---|---|---|
| Records searched to | 21 Mar 2025 | |
| Building plan (BIAPPA) | Sanctioned 19 Mar 2025 | |
| Escrow bank | HDFC · Whitefield Main Road Branch |
Data room
101 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Surya Serene Skyline in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner · Survey 48/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 48/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Anneshwara Grama Panchayath · Survey 48/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAP/TP/CC/325/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/090525/007731
K-RERA registration
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 21 Mar 2025 |
|---|
| Developer's project loan | Aditya Birla Housing Finance Ltd · ₹30.00 Cr disbursed |
|---|
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey , 1 page, not in English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 13,139 sq m | |
| Extent the filed land schedule names for these survey numbers | 8,195 sq m | |
| Plot area against the filed extent | 1.6 times | |
| Land area filed with K-RERA | 7,515 sq m | |
| Village, hobli and taluk on the KGIS map | Chikkasanne, Kasaba hobli, Devanahalli taluk | |
| Sy. 48/1: filed extent, KGIS plot | 8,195 sq m, 13,139 sq m | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 48/1 | |
|---|---|---|
| Land extent, Sy 48/1 | 2 Acre- 01 Gunta | |
| Whole survey numbers on the KGIS map | 13,139 sq m (the project holds a share) | |
| Land area of this registration | 7,515 sq m | |
| Khata | E Khatha · Anneshwara Grama Panchayath · 16 Nov 2024 | |
| Sale deed | Dated 8 Nov 2005 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 48/1 | 1 | 2 acres 1 gunta | 2 acres 1 gunta | 3 acres 10 guntas | The map differs by 1 acre 9 guntas | 0 |
Valid as of this reportValidity ended
| Building plan (BIAPPA) | Sanctioned 19 Mar 2025 · No. BIAAP/TP/CC/325/2024-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/411/2024 · issued 19 Dec 2024 | Clear |
| Environmental clearance | SEIAA 177 CON 2024 · EC identification no. EC24C3801KA5544057N · issued 28 Jan 2025 | Clear |
| Airport height NOC | valid until 31 Jul 2032 | Clear |
| Pollution board (CFE) | consent order CTE-344877 · issued 27 Aug 2024 · valid until 30 Jul 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 29 Apr 2005 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 48/1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 BHK & 3 BHK Units | 117 | 850 |
| Sold, Q2 2026-27 | 17 / 117 | |
|---|---|---|
| Unsold, Q2 2026-27 | 100 | |
| Months to sell, derived from filed bookings | 180 months |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 1.5 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 1.5 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 1.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 3 km | Locked | |
| Sattva Vasanta Cove | about 4.5 km | Locked | |
| Sattva Vasanta Skye | about 4.5 km | Locked | |
| Varnam Phase 1c | about 5 km | Locked | |
| Birla Trimaya Phase-3 | about 5 km | Locked | |
| Birla Trimaya | about 5 km | Locked | |
| Birla Trimaya Phase-2 | about 5.5 km | Locked | |
| Godrej MSR City | about 5.5 km | Locked | |
| Barca II At Godrej Msr City | about 5.5 km | Locked |
| Surya Serene Skyline This project | This project is the point the others are measured from | 31 Dec 2028 | 15% (17 of 117) | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 1.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 1.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 91% Agriculture, 9% Residential (main), over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 17 km, Shankrappa Layout, MAruthi nagar | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.61 (188 covered spaces for 117 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement

| Main structure | Not started · planned by 31 Dec 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2028 | |
| Club house | Not started | |
| Completion | 44% | |
| Completion, accountant | 48.4% of the estimated cost spent |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 19 Mar 2025 |
| Building heights, fire NOC | 45 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/411/2024 · issued 19 Dec 2024 | |
| Environmental clearance | SEIAA 177 CON 2024 · EC identification no. EC24C3801KA5544057N · issued 28 Jan 2025 | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 20 Mar 2025 · site inspected 15 Mar 2025 | |
| Engineer's certificate, registration | Dated 28 Mar 2025 | |
| Chartered accountant's certificate, registration | Dated 13 Jan 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹81.0 L 2.5%Development · ₹31.00 Cr 97.5%
| Estimated cost, at registration | ₹31.81 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹15.50 Cr | |
| Estimated cost, engineer's certificate | ₹31.00 Cr | |
| Estimated cost, chartered accountant's certificate | ₹44.01 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹44.01 Cr | |
| Cost incurred | ₹21.31 Cr (48.4% of the Form 4 Q2 2026-27 estimate) |
Sold (17) 14.5%Unsold (100) 85.5%
| Sold, Q3 2025-26 | 12 / 117 · 105 available | |
|---|---|---|
| Sold, Q4 2025-26 | 17 / 117 · 100 available | |
| Sold, Q1 2026-27 | 17 / 117 · 100 available | |
| Sold, Q2 2026-27 | 17 / 117 · 100 available | |
| Unsold, Q2 2026-27 | 100 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | HDFC · Whitefield Main Road Branch | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹37.6 L in Q2 2026-27 | |
| Withdrawn from the escrow account to date | ₹37,59,576 |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 1.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 3 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Sattva Vasanta Cove | about 4.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Sattva Vasanta Skye | about 4.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Projects within 4 km, counted | 19 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 5,262 | |
| Booked | 3,565 of 5,262 (68%) | |
| Unsold | 1,697 | |
| Booked a month, pooled | 56 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 25.5 km, K.R. Puram | |
| Metro, under construction | about 3.5 km, Airport City |
| Kempegowda Airport | 8 | 4 |
| MG Road (CBD) | 33.5 | 30 |
| Manyata Tech Park | 28.5 | 22 |
| ITPL, Whitefield | 43.5 | 27.5 |
| Ecospace, Bellandur ORR | 54 | 34 |
| Electronic City Ph 1 | 53 | 43.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |